Projects / United States · Announced

NuCube test microreactor at the Utah San Rafael Energy Lab

NuCube Energy's NuSun-1 is a test reactor proposal at the Utah San Rafael Energy Lab in Orangeville, under a June 2025 memorandum of understanding with Utah's Office of Energy Development.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Heat-pipe microreactor. How it works, with a 3D view.
Schematic of eVinci, this type's example. A horizontal canister holds a graphite core block with rows of fuel compacts, with control drums above and below it and shutdown rods coming in from the left.
Schematic of eVinci, this type's example.

Description

The memorandum covers siting and testing a NuCube microreactor (NuSun-1) at the lab. No schedule, rating or authorization step has been published. Distinct from the Ward 250 and Nuclea records at the same lab.

Key facts

Design
NuSun-1 (Microreactor)
Technology
Other · other
Operator(s)
Not recorded
Vendor for linked design
NuCube Energy
Location
Utah San Rafael Energy Lab · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Center of the map embedded on the lab's own About page, labeled 'San Rafael Energy Research Center' (39.2394, -111.0893). Lab-area point, not a surveyed reactor pad. Replaces an earlier road-centroid geocode.
Coordinates
39.2394, -111.0893 · site-area point (approximate)
Electrical capacity
Not recorded · scope: module
Thermal capacity
Not recorded
Modules planned
1
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

NuCube test microreactor at the Utah San Rafael Energy Lab is recorded at Utah San Rafael Energy Lab, Utah, United States. Operator: No operator is recorded. Recorded vendor: NuCube Energy. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate). Other records at this site: Valar Atomics Ward 250, Nuclea Morpheus test reactor siting at the Utah San Rafael Energy Lab.

Coordinate source: Utah San Rafael Energy Lab: about us (embedded map), Center of the map embedded on the lab's About page, labeled 'San Rafael Energy Research Center' (39.2394, -111.0893)

Electrical output is not recorded on this project. Modules planned: 1. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Fuel
  • Fuel form stated for NuSun-1TRISO
No project-specific fuel supply arrangement is recorded as a structured fact.

The lab's NuCube page and World Nuclear News of 12 June 2025 say the reactor uses TRISO fuel and heat pipes, which are design features. Neither names a fuel manufacturer, quantity or delivery for the Orangeville test, and the lab's molten-salt capability described in the article is not linked to NuCube. Utah San Rafael Energy Lab: NuCube Energy; WNN: Utah to host NuCube test reactor

Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

The Utah San Rafael Energy Lab's NuCube page and World Nuclear News of 12 June 2025 say the microreactor could generate electricity and high-temperature industrial heat for off-grid, rural or industrial users, but they name no buyer or user of output from the Orangeville test. Those are classes of use, and the lab is the test host. Utah San Rafael Energy Lab: NuCube Energy; WNN: Utah to host NuCube test reactor

Contractor

The lab's NuCube page and World Nuclear News of 12 June 2025 say the Utah San Rafael Energy Lab, operated by the Utah Office of Energy Development, signed a memorandum of understanding with NuCube Energy to site and test a NuCube microreactor in Orangeville, and that community-outreach discussions had begun. That is a site-host memorandum with the developer. No engineering or construction contractor is named, and no license or construction decision is shown. Utah San Rafael Energy Lab: NuCube Energy; WNN: Utah to host NuCube test reactor

Funding and government decisions

The lab's NuCube page and World Nuclear News of 12 June 2025 describe a siting and testing memorandum but state no funder, amount, application or award for the Orangeville NuCube test. The company's cost-competitiveness claim gives no figure. WNN: Utah to host NuCube test reactor; Utah San Rafael Energy Lab: NuCube Energy

Comparable schedule revision

Comparable schedule revision not established. World Nuclear News of 12 June 2025 and the lab's NuCube page report the siting memorandum but give no test or construction date for the NuCube unit. The article's one-year operation expectation concerns Valar Atomics' separate test reactor. With no dated NuCube target, no revision is shown. WNN: Utah to host NuCube test reactor; Utah San Rafael Energy Lab: NuCube Energy

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 notes, 1 not yet reviewed)
  • Evidence review. The Utah Office of Energy Development page says the Utah San Rafael Energy Lab, which that office operates, and NuCube Energy signed a memorandum of understanding to site and test a NuCube microreactor at the lab in Orangeville, Utah. The page gives the lab address as 800 N Coal Haul Rd, Orangeville, UT 84537, and describes the test unit as a TRISO-fuel, heat-pipe microreactor delivering heat above 1,000 °C for electricity and industrial heat. It does not use the name NuSun-1, give a megawatt rating, name a licensed operator, or state a test date. World Nuclear News dated 12 June 2025 reports the same memorandum for a test reactor in Orangeville and says community-outreach discussions about siting have begun. Neither page is a license, a construction decision, or a funding award. The stored single-module scope, unknown electrical basis, NuCube vendor link, Orangeville site and announced stage stay. The stored design name NuSun-1 is not in these two pages. Last checked 20 Oct 2026. Utah San Rafael Energy Lab: NuCube Energy; WNN: Utah to host NuCube test reactor
    What would change this

    A NuCube or Utah authorization filing for this test reactor, a dated test schedule, or a document that applies the name NuSun-1 to the Orangeville unit. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites. World Nuclear News reported in June 2025 that NuCube said testing its microreactors at the San Rafael Energy Lab would be the next step in the technology's development. Neither that report nor the lab's page gives a test date, rating or authorization step, so the timing of that step is not established. Last checked 23 Oct 2026. WNN: Utah to host NuCube test reactor
    What would change this

    A NuCube or Utah announcement of a test schedule or authorization for the Orangeville test reactor. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. World Nuclear News reported on 12 June 2025 that NuCube and the Utah San Rafael Energy Lab said they had begun discussing community outreach and engagement on siting the test reactor in Orangeville. Neither that report nor the lab's NuCube page names a DOE or NRC application, authorization or public hearing, so no permission is established. Last checked 23 Oct 2026. WNN: Utah to host NuCube test reactor
    What would change this

    A DOE authorization request or NRC filing for the NuCube test reactor, or a public meeting in Orangeville. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). The Utah San Rafael Energy Lab's NuCube page says the lab, operated by Utah's Office of Energy Development, and NuCube signed a memorandum of understanding to site and test a NuCube microreactor at the lab in Orangeville, and gives the lab's address on North Coal Haul Road. A memorandum is not a lease, and neither source describes the reactor's position, utilities or water arrangements. Last checked 23 Oct 2026. Utah San Rafael Energy Lab: NuCube Energy; WNN: Utah to host NuCube test reactor
    What would change this

    A site agreement or test plan placing the NuCube reactor at a specific location in the lab. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 2 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.2 of 2 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: NuCube test microreactor at the Utah San Rafael Energy Lab — https://smrmap.com/projects/nucube-usrel/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “NuCube test microreactor at the Utah San Rafael Energy Lab”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/nucube-usrel/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.