PBMR (Pebble Bed Modular Reactor)

Historical South African PBMR-400 direct-cycle design: the PBMR contribution to the 2020 IAEA booklet gives 400 MWth / 165 MWe, without a gross/net electrical basis. The design evolved from earlier configurations, and the 2010 termination of the Koeberg demonstration remains separate from later efforts to revive PBMR technology. The 2025 revival account does not establish selection of the unchanged PBMR-400 or its rating for a new demonstration.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
No live project recorded here; 1 canceled (PBMR demonstration power plant at Koeberg). Development status as stated: Preliminary design completed; project stopped in 2010.
Evidence
3 sources; first primary source: South Africa national report, 7th CNS review meeting. Record reviewed 2 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Key facts

Class
SMR
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Spectrum
Thermal
Developer / vendor(s)
PBMR (Pty) Ltd
Module electrical
165 MWe (gross/net unspecified)
Module thermal
400 MWth (nameplate; basis unspecified)
Development status (as stated)
Preliminary design completed; project stopped in 2010
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Design sources

(3)

Evidence and open questions

(2 notes)
  • Evidence review. The 2020 IAEA booklet's PBMR-400 chapter records the historical direct-cycle reactor design at 400 MWth / 165 MWe, with gross/net unspecified. It describes evolution from the earlier 200 MWth basis and PBMR-268, and termination in 2010. The 18 November 2025 revival article concerns renewed development and a future demonstration; it does not establish that the unchanged historical PBMR-400 was selected for that demonstration. The historical design figures are not assigned to a revived deployment or treated as achieved output. Last checked 19 Oct 2026. IAEA 2020 SMR book: HTR-10 technical table; South Africa national report, 7th CNS review meeting; NEI: South Africa revives PBMR project
    What would change this

    A Necsa or South African government decision after November 2025 that selects a PBMR power configuration or reopens licensing. Next scheduled check: 19 Jan 2027.

  • Module rating. 400 MWth / 165 MWe are the historical PBMR-400 direct-cycle design figures in the 2020 booklet, not a finalized rating for the later revival. Earlier PBMR versions and the revived program remain distinct; gross/net is unspecified. Last checked 19 Oct 2026. IAEA 2020 SMR book: HTR-10 technical table
    What would change this

    A post-2025 Necsa specification if the revived program uses a different module output than 400 MW(t) / 165 MW(e). Next scheduled check: 19 Jan 2027.