Designs

RAPID

CRIEPI's sodium-cooled fast reactor of 10 MWt and 1 MWe for autonomous operation, which IAEA-TECDOC-1536 (2007) describes as factory fabricated and fueled. The same document calls it a successor of CRIEPI's lunar-base RAPID-L concept; RAPID-L (lunar concept) is a related but separate lunar concept, profiled separately; its lithium coolant and output are not assigned to terrestrial RAPID. This dated design profile does not establish current development, a deployment site or any regulatory permission.

Reactor type
Sodium-cooled fast reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
One source (IAEA/NEA): IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007). Record reviewed 3 Oct 2026.
Schematic of Natrium, this type's example. On the left, a wide reactor vessel inside a guard vessel holds the core low down, with control rods from above, an upper structure, one heat exchanger and one pump.
Schematic of Natrium, this type's example.

Catalog identity snapshot: 2007 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
Microreactor
Technology
Sodium-cooled fast reactor (SFR)
Coolant
Sodium
Spectrum
Fast
Developer / vendor(s) as of 2007
Central Research Institute of Electric Power Industry (CRIEPI)
Module electrical
1 MWe (gross/net unspecified)
Module thermal
10 MWth (nameplate; basis unspecified)
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
3 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

  • No projects tracked here.

Design sources

(1)

Evidence and open questions

(1 note)
  • Evidence review. IAEA-TECDOC-1536, January 2007, describes RAPID as a small sodium-cooled fast reactor of 10 000 kW(th) and 1000 kW(e), with U-Pu-Zr metal fuel, developed by CRIEPI for electricity and potable water in remote areas. It is at conceptual design stage. RAPID-L is named as the lunar predecessor at 200 kW(e) and was not copied. Mitsubishi Research Institute is named as a participant, not added as a vendor. Last checked 20 Oct 2026. IAEA-TECDOC-1536, Status of Small Reactor Designs Without On-Site Refuelling (2007)
    What would change this

    A later CRIEPI page that says whether the 1000 kW(e) figure is gross or net. Next scheduled check: 20 Jan 2027.