Designs

SINAP small modular thorium molten-salt research reactor (10 MWe)

Small modular thorium molten-salt research reactor of the Shanghai Institute of Applied Physics, described in the siting-stage environmental assessments published by China's ecology ministry. The January 2026 resubmission gives 10 MWe and 30 MWt; the July 2024 edition gave 10 MWe and 60 MWt, so the thermal rating changed between editions and the earlier figure is kept here as history. The developer and the National Energy Administration call it small modular. It is a research facility, distinct from the operating 2 MWt TMSR-LF1 and from the 100 MWt demonstration that remains program context.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Projects
Siting: SINAP small modular thorium molten-salt research reactor (10 MWe), Minqin.
Evidence
7 sources; first primary source: MEE: siting-stage environmental impact report (January 2026 resubmission), SINAP small modular thorium molten-salt reactor research facility. Record reviewed 8 Oct 2026.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Key facts

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
Molten salt
Spectrum
Thermal
Developer / vendor(s)
Shanghai Institute of Applied Physics
Module electrical
10 MWe (gross/net unspecified)
Module thermal
30 MWth (nameplate; basis unspecified)
Record reviewed
8 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Design sources

(7)

Evidence and open questions

(1 note)

Cite or share this page

SMRMap. “SINAP small modular thorium molten-salt research reactor (10 MWe)”. Record reviewed 8 Oct 2026. https://smrmap.com/designs/dsn-sinap-smtmsr-10mwe/ (accessed [date]).

“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.

Record details
Inclusion basis
Vendor SMR claim, capacity checked
Confidence (as stored in the record)
medium

Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.