BARC SMR-55
BARC SMR-55 is a 55 MWe demonstration reactor that India's Department of Atomic Energy says is based on a pressurized water reactor design. The Bhabha Atomic Research Centre is designing and developing it.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- Siting: Tarapur SMR-55 lead proposal.
- Evidence
- 3 sources; first primary source: DAE parliamentary answer naming lead sites. Record reviewed 1 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
India's Department of Atomic Energy says the SMR-55 is based on a pressurized water reactor design. - Developer / vendor(s)
- Bhabha Atomic Research Centre
- Module electrical
- 55 MWe (gross/net unspecified)
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Coolant (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 1 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(3 without a known value)
- Coolant
- Not recorded
- Spectrum
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Tarapur SMR-55 lead proposal — Siting · India
Design sources
(3)
- DAE parliamentary answer naming lead sites (government, accessed 1 Oct 2026)
- Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026) (government, dated 5 Aug 2026, accessed 6 Oct 2026)
- Department of Atomic Energy: written answer to Lok Sabha unstarred question 2841, Nuclear Energy Mission and Bharat Small Modular Reactors (5 August 2026) (government, dated 5 Aug 2026, accessed 6 Oct 2026)
Evidence and open questions
(4 notes)
- Evidence review. The Press Information Bureau page first attached returned an access refusal (HTTP 403) and an Access Denied block page, so no passage was read from it. The Department of Atomic Energy's written answers to Lok Sabha questions 2793 and 2841 of 5 August 2026 say BARC has undertaken the 55 MWe SMR-55 as a demonstration reactor, based on a pressurized water reactor design, with Tarapur, Maharashtra approved as the site by the Atomic Energy Commission. Neither answer states the coolant, the neutron spectrum or a gross or net basis, so those stay unknown. Last checked 19 Oct 2026. DAE parliamentary answer naming lead sites; Department of Atomic Energy: written answer to Lok Sabha unstarred question 2841, Nuclear Energy Mission and Bharat Small Modular Reactors (5 August 2026); Department of Atomic Energy: written answers in Parliament on small reactors (posted May to September 2026)
What would change this
A DAE or BARC document that names the SMR-55's coolant and spectrum and the basis of the 55 MWe figure. Next scheduled check: 19 Jan 2027.
- Coolant: Not disclosed in the reviewed evidence. The Department of Atomic Energy's answers of 5 August 2026 call the SMR-55 based on a pressurized water reactor design but do not state its coolant. The first attached page is an an access refusal (HTTP 403) Access Denied response. Last checked 4 Nov 2026. Department of Atomic Energy: written answer to Lok Sabha unstarred question 2841, Nuclear Energy Mission and Bharat Small Modular Reactors (5 August 2026); DAE parliamentary answer naming lead sites
What would change this
A readable DAE or BARC SMR-55 description that names the coolant. Next scheduled check: 19 Jan 2027.
- Neutron spectrum: Not disclosed in the reviewed evidence. The Department of Atomic Energy's answers of 5 August 2026 call the SMR-55 based on a pressurized water reactor design but do not state its neutron spectrum. The first attached page is an an access refusal (HTTP 403) Access Denied response. Last checked 4 Nov 2026. Department of Atomic Energy: written answer to Lok Sabha unstarred question 2841, Nuclear Energy Mission and Bharat Small Modular Reactors (5 August 2026); DAE parliamentary answer naming lead sites
What would change this
A readable DAE or BARC SMR-55 description that names the neutron spectrum. Next scheduled check: 19 Jan 2027.
- Technology family. India's Department of Atomic Energy says the SMR-55 is based on a pressurized water reactor design. The answer does not describe its primary-circuit layout, so neither a loop nor an integral layout is recorded. Last checked 4 Nov 2026. Department of Atomic Energy: written answer to Lok Sabha unstarred question 2841, Nuclear Energy Mission and Bharat Small Modular Reactors (5 August 2026)
What would change this
A BARC, NPCIL or AERB document that changes the SMR-55 reactor type or layout. Next scheduled check: 4 Feb 2027.