U-Battery

High-temperature gas-cooled microreactor of 10 MWt and 4 MWe listed by the IAEA's 2020 SMR booklet (conceptual design). Urenco withdrew its support for the project in March 2023. This dated design profile does not establish current development, a deployment site or any regulatory permission.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
Siting: U-Battery first-of-a-kind siting bid at Chalk River (2019-2023).
Evidence
2 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 3 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Catalog identity snapshot: 20 Mar 2023 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
Microreactor
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Spectrum
Thermal
Developer / vendor(s) as of 20 Mar 2023
Urenco
Module electrical
4 MWe (gross/net unspecified)
Module thermal
10 MWth (nameplate; basis unspecified)
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
3 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Design sources

(2)

Evidence and open questions

(1 note)
  • Evidence review. The 2020 IAEA booklet names Urenco of the United Kingdom and describes U-Battery as a high-temperature gas-cooled microreactor with helium and graphite, then gives thermal and electrical capacity as 10 / 4. The same section says it would supply power and heat for energy-intensive industries and remote locations. Urenco's statement of 20 March 2023 says it can no longer continue support of the U-Battery project. The quoted lines do not use the word thermal for the neutron spectrum, and they do not name Chalk River. Stored 4 MWe and 10 MWth nameplate values match the 10 / 4 pair and are unchanged. Stored status is empty. Last checked 19 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition); Urenco statement on U-Battery (20 March 2023)
    What would change this

    A Urenco or Canadian Nuclear Laboratories document that states whether the Chalk River siting bid survived the 20 March 2023 decision. Next scheduled check: 19 Jan 2027.