Projects / Canada · Siting

U-Battery first-of-a-kind siting bid at Chalk River (2019-2023)

The Urenco-led U-Battery consortium's bid to site a first-of-a-kind SMR at AECL's Chalk River campus in Canada is a proposal recorded at the siting stage.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Description

In July 2019 the consortium completed the first stage of Canadian Nuclear Laboratories' invitation to site the SMR and moved to the due-diligence stage, the last site-specific step on record. No site award, land arrangement or construction approval is established. In March 2023 Urenco ended its support for U-Battery after failing to secure new investors; a formal end of the Chalk River proposal is not separately recorded.

Key facts

Design
U-Battery (Microreactor)
Technology
High-temperature gas-cooled reactor (HTGR) · helium
Operator(s)
Not recorded
Vendor for linked design
—
Design origin
United Kingdom: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
Chalk River Laboratories campus (U-Battery siting bid) · Canada · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain reactors export point for Chalk River (CC BY 4.0, derived from GEM's Global Nuclear Power Tracker), the same campus point used for the Global First Power record; no position within the Chalk River Laboratories campus is published.
Coordinates
46.05, -77.3636 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
3 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

U-Battery first-of-a-kind siting bid at Chalk River (2019-2023) is recorded at Chalk River Laboratories campus (U-Battery siting bid), Ontario, Canada. Operator: No operator is recorded. Recorded vendor: No vendor is recorded. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'chalk-river-nuclear-power-plant' (46.05001, -77.3636)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 10 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

Urenco's 29 July 2019 release says U-Battery aims to replace diesel power for remote communities and off-grid sites such as northern mines. That is a general market. It names no recipient of power from a Chalk River unit. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019)

Contractor

Urenco's 29 July 2019 release says the Urenco-led U-Battery consortium passed the first stage of Canadian Nuclear Laboratories' invitation to site an SMR at Chalk River and moved to due diligence, in which CNL would evaluate the design, finances and security. CNL is the site host running the invitation, not a contractor, and no engineering or construction contractor is named. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019)

Funding and government decisions

Urenco's 29 July 2019 release says U-Battery received UK Advanced Modular Reactor program funding for design work, which is not Chalk River project funding. Urenco said on 20 March 2023 that it could no longer support the U-Battery project after failing to secure new commercial investors. No funding for a Chalk River unit is stated. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019); Urenco statement on U-Battery (20 March 2023)

Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

Urenco's 29 July 2019 release describes Urenco, the consortium lead, as an enrichment and fuel-cycle supplier, but names no fuel supply, quantity or delivery for a Chalk River unit. Urenco's 20 March 2023 statement on ending its support concerns its fuel business generally. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019)

Comparable schedule revision

Comparable schedule revision not established. Urenco's 29 July 2019 release and 20 March 2023 statement give no construction or operation date for a Chalk River U-Battery. The 2023 statement ended Urenco's support for the project. With no dated target there is nothing to revise. Urenco statement on U-Battery (20 March 2023)

Not recorded in SMRMap's reviewed evidence (4): Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes, 1 not yet reviewed)
  • Evidence review. Urenco's release of 29 July 2019 says the U-Battery consortium, led by Urenco, completed the first evaluation stage of Canadian Nuclear Laboratories' invitation to site a first-of-a-kind SMR at Atomic Energy of Canada Limited's Chalk River Laboratories campus in Chalk River, Ontario, and was invited to the due-diligence stage, in which CNL would evaluate the design, its financial viability and security requirements. The design is U-Battery; the release gives no output, unit count or intended operator for the Chalk River proposal, and no opened source records a site award, land agreement or license application. On 20 March 2023 Urenco said it could no longer continue its support of the U-Battery Advanced Modular Reactor project after failing to secure new commercial investors, and intended to transfer the intellectual property to the UK National Nuclear Laboratory; that statement does not mention Chalk River. The stored design, empty operator list, unstored capacity and siting stage stay as the last evidenced state, while the developer (the Urenco-led consortium) is identified and the Chalk River Laboratories campus is a named site. Whether the record should move to a halted stage is a coordinator decision, because the 2023 statement ends Urenco's support for the project as a whole but is not a Chalk River-specific withdrawal. No next documentary decision is expected; a CNL statement closing U-Battery's due-diligence stage would settle the Chalk River outcome. Last checked 19 Oct 2026. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019); Urenco statement on U-Battery (20 March 2023)
    What would change this

    A CNL or AECL statement on the outcome of U-Battery's due-diligence stage, or a National Nuclear Laboratory statement on the U-Battery intellectual property that mentions Canada, would change this record. Next scheduled check: 19 Jan 2027.

  • Developer or proposer. Urenco's 2019 release says the U-Battery consortium bidding for the Chalk River siting invitation is led by Urenco. That identifies the proposer for this exact bid. Last checked 19 Oct 2026. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019)
    What would change this

    None needed; a CNL record naming the consortium members would add detail. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed. The 2019 release names AECL's Chalk River Laboratories campus in Chalk River, Ontario as the site in CNL's invitation. No position within the campus is given, so the map uses the shared campus point. Last checked 19 Oct 2026. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019)
    What would change this

    A CNL site-allocation document giving a location on the campus would allow an approximate position. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. The last Chalk River step on record is the July 2019 move into CNL's due-diligence stage. In March 2023 Urenco said it would no longer support the U-Battery project after failing to secure new commercial investors and planned to transfer the design's intellectual property to the UK National Nuclear Laboratory. The statement does not mention Chalk River; no further site-specific decision is recorded. Last checked 23 Oct 2026. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019); Urenco statement on U-Battery (20 March 2023)
    What would change this

    A CNL or new-owner statement on any U-Battery deployment at Chalk River. Next scheduled check: 21 Jan 2027.

  • Permissions and public process: Not disclosed in the reviewed evidence. The July 2019 Urenco release describes Canadian Nuclear Laboratories' commercial siting invitation, under which the consortium moved to a due-diligence review of design, finances and security. That is a host-site selection process, not a regulatory permission; the release names no CNSC license application or public consultation. Last checked 23 Oct 2026. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019)
    What would change this

    A CNSC licensing record or CNL announcement naming a U-Battery application at Chalk River. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water). The 2019 invitation concerned a site on AECL's Chalk River Laboratories campus in Ontario. No specific parcel, land agreement, grid connection or water arrangement is described in the release, and no site award is recorded. Last checked 23 Oct 2026. U-Battery advancing toward siting a first-of-a-kind SMR in Canada (29 Jul 2019)
    What would change this

    A CNL site award or license application describing the U-Battery plot and its connections. Next scheduled check: 21 Jan 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 2 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.2 of 2 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: U-Battery first-of-a-kind siting bid at Chalk River (2019-2023) — https://smrmap.com/projects/ubattery-chalk-river/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “U-Battery first-of-a-kind siting bid at Chalk River (2019-2023)”. Record reviewed 3 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/ubattery-chalk-river/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.