Designs / dsn-vber-150

VBER-150

Historical modular two-loop variant of VBER-300 in IAEA-TECDOC-1451 (May 2005), intended for floating or land-based power. The table gives 350 MWth and 110 MWe; the design discussion qualifies electrical output as about 110 MWe. The name does not mean 150 MWe. No current development, deployment or authorization is established.

Catalogue identity snapshot: 2005-05 (dated technical description; not confirmation of current development). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Class
SMR
Technology
Other
Coolant
light water
Spectrum
unknown
Developer / vendor(s) as of 2005-05
Afrikantov OKBM (catalogue designer)
Module electrical
approximately 110 MWe (nameplate (gross/net unspecified))
Module thermal
350 MWth (nameplate; basis unspecified)
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-13

Tracked deployment projects

Design sources