VK-300

Simplified passive boiling-water reactor by NIKIET, listed in the IAEA's 2018 and 2020 SMR booklets (detailed design) at 750 MWt and 250 MWe. This dated design profile does not establish current development, a deployment site or any regulatory permission.

Reactor type
Boiling water reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
2 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 3 Oct 2026.
Schematic of BWRX-300, this type's example. A tall reactor vessel with, from bottom to top, control rods and drives, the core, a tall chimney, steam separators and a steam dryer.
Schematic of BWRX-300, this type's example.

Catalog identity snapshot: 2020 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Boiling water reactor (BWR)
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 2020
NIKIET
Module electrical
250 MWe (gross/net unspecified)
Module thermal
750 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
3 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

  • No projects tracked here.

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(2)

Evidence and open questions

(1 note)
  • Evidence review. The carried 2020 booklet sentences stay limited to the boiling-water classification, the UO2 fuel-rod sentence, and the detailed-design status line. They are not used for the developer, the purpose, the rating, or the deployment. The INIS preview URL returned a 7029-byte PDF.js shell. The paper text is the file that shell names, Kuznetsov and Gabaraev, NIKIET, Dubrovnik, May 2004. That paper calls VK-300 a boiling-water reactor developed for co-generation, states a reactor thermal value of 750 in the extracted Table 1 column, and describes a planned four-unit Arkhangelsk plant. It does not restate a single-unit electrical rating and does not say gross or net. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition); Kuznetsov and Gabaraev, VK-300 simplified boiling water reactor, Dubrovnik, May 2004
    What would change this

    A NIKIET VK-300 specification that states one module electrical output and says whether it is gross or net. The 2004 plant total is not that module figure. Next scheduled check: 20 Jan 2027.