Policy and licensing / Oregon
Oregon: SMR policy and licensing
Selected federal, state, territory, and national measures whose official text was opened. This is not a complete list of laws, rules, programs or guidance for any jurisdiction. A jurisdiction without a page here is not a finding that it has no policy, and these pages do not rate or prefer any jurisdiction. Nothing here implies that a project is eligible for, or approved under, any measure.
89 projects in United States →
Federal measures apply in Oregon as everywhere in the United States and are listed once on the federal page. They are not counted here.
Where licensing stands
Built only from the records on this page. It is not a complete account of the law and not legal advice.
- Authorities named in recorded applications, reviews and decisions
- None recorded: no application or decision for a tracked project here is recorded.
- Licensing law or framework in the record
- NRC licensing measures are recorded once, on the federal page (10 records).
- Latest recorded step
- Enacted : Oregon conditions for a nuclear-fueled thermal power plant
- Open coverage gaps
- None open in the bounded review; a concluded review is not exhaustive. What the review of 5 Oct 2026 read.
Laws, rules and executive directives
- Oregon conditions for a nuclear-fueled thermal power plant · In effect
ORS 469.594 to 469.601 (2025 edition) · Oregon Legislative Assembly · affects: Siting
Oregon's 2025 official law book still requires a federally licensed high-level-waste repository before a site certificate for a nuclear-fueled thermal power plant, and it requires approval by the state's electors at the next available statewide general election. The certificate shall not be issued until that vote. The text cites a 1981 measure and does not approve a plant.
Not approved or pending: The earlier official chapter HTML timed out and the compiled PDF route returned a not-found error (HTTP 404). Those routes were not retried. This 2025 law book is the text that was read. No Oregon project is linked. The sections do not issue a site certificate. (Record checked .)
Bills, proposed rules and consultations
- None recorded.
Funding and support programs
- None recorded.
Regulatory guidance and inspector policies
- None recorded.
Recorded permissions and applications for tracked projects located in Oregon
Listed by project location only, with each action's issuing authority recorded. The jurisdiction measures above do not themselves authorize reactor construction or operation.
- None recorded.
What this review has read for Oregon
As of 5 Oct 2026. Bounded review concluded. A published record above is separate from research coverage: a class can be blocked or unreviewed even where records are published. Coverage for every state and territory.
- Statutes, session laws and bills: Evidence read. ORS 469.594 to 469.601 (conditions for a nuclear-fueled thermal power plant) were read in the Public Utility Commission's 2025 law book. The legislature's chapter page timed out.
- Governor or energy instruments: None found in sources checked. The Department of Energy's nuclear emergency preparedness page was read. It is an agency page, not an executive instrument.
- Commission or siting instruments: Evidence read. Energy Facility Siting Council rule OAR 345-001-0010 (definitions, 23 April 2026 version) was read. It defines nuclear terms and excludes nuclear plants from one facility category; it certificates nothing.
- Funding measures and awards: Evidence read. Enrolled Senate Bill 5518 (2025) was read: $179,870 for nuclear safety and emergency response. The chapter and approval lines on the copy are blank.
Sources read (6):
- www.oregonlegislature.gov/bills_laws/ors/ors469.html · checked 4 Oct 2026
- www.oregon.gov/energy/safety-resiliency/Pages/Emergency-Preparedness.aspx · checked 4 Oct 2026
- secure.sos.state.or.us/oard/viewSingleRule.action?ruleVrsnRsn=334999 · checked 4 Oct 2026
- www.oregon.gov/energy/About-Us/Pages/Budget.aspx · checked 4 Oct 2026
- olis.oregonlegislature.gov/liz/2025R1/Downloads/MeasureDocument/SB5518/Enro… · checked 4 Oct 2026
- www.oregon.gov/puc/about-us/Documents/LawBook.pdf · checked 4 Oct 2026
Sources that could not be read (1):
- www.oregonlegislature.gov/bills_laws/ors/ors469.pdf · checked 4 Oct 2026 · a not-found error (HTTP 404)