Projects / Sweden · Canceled

Blykalla SEALER study at Hörby (withdrawn)

Hörby municipality and Blykalla signed a letter of intent in June 2025 to study SEALER reactors at Stavröd.

Current status

Stage
Canceled
How current
General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.
Same design
4 tracked: 2 licensing, 1 siting. Separately: 1 canceled. 10 tracked at canceled across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Lead-cooled fast reactor. How it works, with a 3D view.
Schematic of BREST-OD-300, this type's example. A wide vessel, cut in section, has a central cavity holding the core low down, and a cavity on each side holding a steam generator and a pump.
Schematic of BREST-OD-300, this type's example.

Description

In May 2026 Blykalla said SMRs in Hörby are no longer planned and is studying a factory at the same place instead. Historical record.

Key facts

Design
SEALER (SMR)
Technology
Lead-cooled fast reactor (LFR) · lead
Operator(s)
Not recorded
Vendor for linked design
Blykalla
Location
Stavröd, Hörby · Sweden · precision: town or locality only
The sources name this place but publish no coordinate for it, so no pin is shown.
Coordinates
Town named, no map pin
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded. The May 2026 sentence uses the plural SMRs and the 2025 study names SEALER without a count.
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

Blykalla SEALER study at Hörby (withdrawn) is recorded at Stavröd, Hörby, Skåne, Sweden. Operator: No operator is recorded. Recorded vendor: Blykalla. Stage: Canceled. Location precision: town or locality only; town named, no map pin.

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states 140 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Fuel
  • Fuel form stated for SEALERUN (uranium nitride), as stated by ARIS
No project-specific fuel supply arrangement is recorded as a structured fact.

Hörby municipality's project page quotes Blykalla saying uranium would be procured the same way as for Sweden's existing nuclear power unless new suppliers appeared, for example Swedish uranium mining. That names no supplier, allocation, fabrication or delivery for a Hörby reactor, and the reactor plan was withdrawn in May 2026. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)

Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

Hörby municipality's project page, covering the June 2025 letter of intent and Blykalla's May 2026 withdrawal, names no buyer of power or heat from a Hörby SEALER. It says the site suits local distribution of electricity and heat and that Blykalla hoped to offer connections to possible future industries, but no customer, quantity or agreement is named. The municipality was the study partner, not a buyer. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)

Contractor

Hörby municipality's project page names no engineering or construction contractor for a Hörby SEALER. It says the 18 June 2025 letter of intent committed the municipality, as host, and Blykalla to a joint pre-study of about 18 months at Stavröd that was not a decision to build, and that in May 2026 Blykalla said building SMRs in Hörby was no longer current. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)

Funding and government decisions

Hörby municipality's project page states no amount, grant, investment or cost share for the Hörby study or a reactor. Blykalla's answer there names financing and cost overruns as the main risk, which describes uncertainty rather than any funding. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)

Comparable schedule revision

Comparable schedule revision not established. Hörby municipality's page dates the letter of intent 18 June 2025 and describes a pre-study of about 18 months, with no construction or operation year. In May 2026 Blykalla said building SMRs in Hörby was no longer current. A withdrawal of the plan is a change of status, not an earlier and a later date for the same milestone. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(8 notes)
  • Evidence review. The municipal page supports the 18 June 2025 letter of intent to study SEALER at Stavröd, and Blykalla's May 2026 statement that building SMRs in Hörby is no longer current while a factory at the same place is being studied. No output or module count is stated. Last checked 20 Oct 2026. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)
    What would change this

    A Blykalla or municipal decision that restarts a reactor proposal at Stavröd, or that confirms the factory as a separate project. Next scheduled check: 20 Jan 2027.

  • Plant capacity (scope qualified): Not disclosed in the reviewed evidence. The municipal page describes a SEALER study and later a factory study. It states no electrical or thermal output. Last checked 19 Oct 2026. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)
    What would change this

    A Blykalla or Hörby document that states an output for the withdrawn reactor study. Next scheduled check: 19 Jan 2027.

  • Module/unit count: Not disclosed in the reviewed evidence. The May 2026 sentence uses the plural SMRs and the 2025 study names SEALER without a count. No count is stored. Last checked 19 Oct 2026. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)
    What would change this

    A study that stated how many SEALER units were under consideration at Stavröd. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. Hörby's page says the land area to be studied lies in Stavröd and that Blykalla is now studying a factory at the same place. It names a locality, not a parcel, property designation or facility point, so the site record names only the locality, without a pin. The reactor plan itself was dropped in May 2026. Last checked 19 Oct 2026. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)
    What would change this

    A Hörby or Blykalla document that restarts a reactor proposal and identifies the Stavröd parcel or property designation. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites: Not applicable. Hörby municipality's page records that in May 2026 Blykalla said building SMRs in Hörby is no longer planned and that it is instead examining a factory at the same site. The reactor study has ended, so no next decision applies to this record. Last checked 23 Oct 2026. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)
    What would change this

    A new Blykalla or other proposal to build reactors in Hörby. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. Hörby municipality's project page says the June 2025 letter of intent with Blykalla set up a joint pre-study of about 18 months, not a decision to build, and that building would need permits from the radiation safety authority and the Government, with the municipality holding a veto through planning. The municipality held two public information meetings in September 2025 with about 240 attendees and a webinar in February 2026. In May 2026 Blykalla said SMRs in Hörby were no longer planned. Last checked 23 Oct 2026. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)
    What would change this

    None expected for the reactor study; a new Blykalla nuclear proposal for Hörby would reopen this. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Hörby municipality's page says the land area to be studied for Blykalla's SEALER reactors lay at Stavröd, where component manufacturing could also be considered. After Blykalla withdrew the reactor plans in May 2026, the page says the company is instead examining a factory at the same place. No land agreement for reactors was reached in this source. Last checked 23 Oct 2026. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)
    What would change this

    A land or planning decision for a Blykalla factory at Stavröd, which would not be a reactor site. Next scheduled check: 23 Apr 2027.

  • Spent fuel, waste and closure: Not applicable. Hörby's municipality records that Blykalla ended the reactor pre-study in May 2026 before a permit application or construction. Project-generated spent fuel is not applicable to that abandoned pre-study. The municipality's earlier waste answer describes Swedish interim storage and final disposal in general terms. Financial commitments or site-restoration obligations are not established by these statements. Last checked 23 Oct 2026. Hörby kommun: småskalig kärnteknik i Hörby (avsiktsförklaring med Blykalla)
    What would change this

    A new nuclear proposal at Hörby that would create a waste question. Next scheduled check: 23 Apr 2027.

Evidence dates

(0 of 1 source with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.1 of 1 listed source has no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(1)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Blykalla SEALER study at Hörby (withdrawn) — https://smrmap.com/projects/blykalla-horby/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Blykalla SEALER study at Hörby (withdrawn)”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/blykalla-horby/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.