Designs

SEALER

SEALER, the Swedish Advanced Lead Reactor, is Blykalla's lead-cooled small modular reactor, each unit producing about 55 MWe by the company's account.

Reactor type
Lead-cooled fast reactor. How it works, with a 3D view.
Projects
Licensing: 2 projects. Furthest recorded stage of 4 using this design, including 1 canceled. Development status as stated: Conceptual design.
Evidence
3 sources; first primary source: Blykalla Untra application. Record reviewed 1 Oct 2026.
Schematic of BREST-OD-300, this type's example. A wide vessel, cut in section, has a central cavity holding the core low down, and a cavity on each side holding a steam generator and a pump.
Schematic of BREST-OD-300, this type's example.

Key facts

Class
SMR
Technology
Lead-cooled fast reactor (LFR)
Coolant
Lead
Spectrum
Fast
Developer / vendor(s)
Blykalla
Module electrical
55 MWe (gross/net unspecified)
Module thermal
140 MWth (nameplate; basis unspecified)
Fuel form
UN (uranium nitride), as stated by ARIS
Development status (as stated)
Conceptual design
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
1 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Agreements naming this design (2)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(3)

Evidence and open questions

(1 note)
  • Evidence review. The 2024 SMR Technology Catalogue (third edition, June 2025) describes SEALER-55, designed by Blykalla (Sweden), as a lead-cooled SMR for on-grid commercial power, 140 MWt / 55 MWe, with forced lead circulation, a non-pressurised primary, 12% enriched uranium nitride fuel in 84 hex-can assemblies and a 25-full-power-year core, at 'Conceptual design'. Blykalla's 25 August 2026 release calls the Swedish Advanced Lead Reactor (SEALER) a lead-cooled small modular reactor with each unit producing approximately 55 MWe, and announces its application to the Swedish government for up to eight units (up to 440 MW combined) at Untra in Tierp municipality, following a first application in May 2026 for Norrsundet in Gavle municipality; government approval is only the first step before SSM, court and municipal review. Deployment links supported: the Untra and Norrsundet projects; no opened source names Horby or Svalbard. The attached ARIS URL returned only a 42-character page title. Stored vendor, LFR family, lead coolant, 55 MWe (unspecified basis), UN fuel and 'Conceptual design' stay; the recorded 140 MWth thermal rating matches the catalog's 140 MWt, and the stored fast spectrum is not stated in any opened source. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); Blykalla Untra application
    What would change this

    The Swedish government's decision on Blykalla's Norrsundet (May 2026) or Untra (August 2026) applications, or an SSM licensing submission for SEALER-One, which would carry a regulator-dated design description including spectrum and thermal rating. Next scheduled check: 19 Jan 2027.