Projects / France · Siting
Calogena nuclear heating plant at CEA Cadarache
Calogena proposes a heat-only demonstration at CEA Cadarache, with CEA as host and Calogena as intended designer, builder and operator.
Current status
- How current
- General record check . Bounded evidence review . None of the 3 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Thermal output is not recorded on this project.
- The mapped point is not an exact surveyed coordinate.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Its consultation dossier describes nominal power of 30–45 MWth and an exploratory increase from a 30 MWth baseline to 45 MWth; no finalized point rating or explicitly selected CAL30 version is stored. The voluntary consultation runs from 28 September to 28 November 2026. Calogena targets a creation-authorization application in mid-2027, construction in late 2029 and entry into service in late 2032; none is an achieved milestone or operating permission. ASNR's separate CAL30 design listing records safety-options requests and an opinion, rather than project creation authorization. The dossier estimates equipment costs at €104–208 million and describes equity/debt financing; it does not show the full budget committed. A long-term heat-sale contract remains planned. Framatome assembly production and Orano supply are conditional, while a separate uranium-contract claim names neither counterparties nor a Cadarache allocation. CEA is the host and intended heat beneficiary; the planned heat-sale contract is with an unnamed heat-network operator, not an established CEA offtake contract.
Key facts
- Design
- Design profile not linked (Microreactor)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Calogena
- Vendor for linked design
- Calogena
- Location
- CEA Cadarache · France · precision: site area (named plant, laboratory, base, port, campus or parcel)
OpenStreetMap Nominatim point for 'Center d'Études Nucléaires de Cadarache'; center point, not a facility plot. - Coordinates
- 43.6876, 5.7556 · site-area point (approximate)
- Electrical capacity
- thermal only (no MWe) · scope: plant
The project's consultation dossier gives nominal power as 30–45 MWth and describes exploration of an increase from a 30 MWth baseline to 45 MWth. - Thermal capacity
- Not recorded
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Record reviewed
- 5 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Calogena nuclear heating plant at CEA Cadarache is recorded at CEA Cadarache, Provence-Alpes-Côte d'Azur, France. Operator: Calogena. Recorded vendor: Calogena. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate). Other records at this site: Stellaria Alvin experimental reactor (INB Alpha) at Cadarache.
Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: 'Center d'Études Nucléaires de Cadarache'
This project is recorded as thermal only (no MWe). The project's consultation dossier gives nominal power as 30–45 MWth and describes exploration of an increase from a 30 MWth baseline to 45 MWth. Modules planned: 1. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Operator or intended licensed owner
- OperatorCalogena
- Reactor supplier
- Vendor named for this project (no design profile is linked)Calogena
- Customer or offtaker
Source-backed project statement Calogena's September 2026 consultation dossier for the Cadarache heating plant says a long-term heat purchase agreement is planned with the heat-network operator to fix a stable price for the contract's duration, and that heat-supply contracts would typically run 30 years. The heat-network operator is not named, and CEA is described as the host. The agreement is planned, not signed. Calogena: Cadarache public consultation dossier
- Funding and government decisions
Source-backed project statement Calogena's 2026 Cadarache consultation dossier says the initial construction capital for the module is to be provided by shareholders, Calogena where applicable, and debt, against an equipment estimate of €104 to 208 million, with a long-term heat purchase agreement planned. This is a planned financing structure without named lenders or committed amounts. The France 2030 aid of €5.2 million and €48 million and the press release's €100 million are funding of Calogena the company, not allocations to Cadarache. The €40 million Innovation Fund grant Calogena announced on 2 November 2026 is stated for its Pierrelatte project, not Cadarache. Calogena: Cadarache public consultation dossier; Calogena launches prior consultation on its nuclear heating plant at CEA Cadarache
- Fuel
- Project fuel information is described in the source-backed statement below.
Source-backed project statement Calogena's 2026 Cadarache consultation dossier says the fuel assemblies could be produced by Framatome at Romans-sur-Isère and that Orano could supply the fuel material, conversion and enrichment. It also claims secured uranium supply contracts without naming the sellers or a quantity for Cadarache. These are conditional supply intentions, not a signed fabrication contract, allocation or delivery for this plant. Calogena: Cadarache public consultation dossier
Not found in the sources we checked (2): Contractor; Comparable schedule revision
- Contractor
Calogena's 11 September 2026 press release and its Cadarache consultation dossier name no engineering or construction contractor for the plant. They say CEA, as host providing a parcel, signed a July 2025 letter of intent with Calogena for siting and heat-network connection studies of equipment that Calogena itself would design, build and operate. No creation authorization has been applied for. Calogena launches prior consultation on its nuclear heating plant at CEA Cadarache; Calogena: Cadarache public consultation dossier; ASNR, PRM projects and their fuel-fabrication plants
- Comparable schedule revision
Comparable schedule revision not established. Calogena's 2026 Cadarache consultation dossier states one set of targets: a creation-authorization application in mid-2027, construction from late 2029 and entry into service in late 2032. The 11 September 2026 press release's 2032 first commercial deployment is consistent with that, and the ASNR page lists design safety-option requests, not project milestones. No source read gives an earlier and a later date for the same milestone. Calogena: Cadarache public consultation dossier; ASNR, PRM projects and their fuel-fabrication plants; Calogena launches prior consultation on its nuclear heating plant at CEA Cadarache
Not recorded in SMRMap's reviewed evidence (2): Project proposer or applicant; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes)
- Evidence review. Calogena's project-specific Cadarache consultation dossier describes CEA as host and Calogena as the intended designer, builder and operator of the proposed heat-only equipment; this is not an operating authorization. The July 2025 letter of intent concerns siting and connection studies. The dossier presents nominal power of 30–45 MWth and explains that an increase from a 30 MWth baseline to 45 MWth is being explored, so a fixed finalized project rating is not selected. It does not explicitly name CAL30 as the selected Cadarache version; ASNR's generic CAL30 design listing remains separate. The voluntary consultation runs from 28 September to 28 November 2026. The dossier targets a creation-authorization application in mid-2027, construction in late 2029 and entry into service in late 2032; these are company targets, not permissions, achieved construction, first criticality or a specifically dated commercial-service commitment. It estimates equipment costs at €104–208 million and describes equity and debt, rather than closed full financing. It reports development aid of €5.2 million and €48 million, without assigning these as the complete project budget. A long-term heat sale contract is still planned. Framatome fuel assembly production and Orano fuel supply are described conditionally; a separate claim of secured uranium contracts names neither counterparties nor a Cadarache allocation. Siting and Calogena's intended operating role remain; general record-review dates are unchanged. Last checked 19 Oct 2026. Calogena: Cadarache public consultation dossier; Calogena launches prior consultation on its nuclear heating plant at CEA Cadarache
What would change this
Calogena's Cadarache creation-authorization application targeted for mid-2027, a fixed design/rating choice, or an executed project-specific heat or fuel contract. Next scheduled check: 5 Dec 2026.
- Design identified: Not disclosed in the reviewed evidence. The Cadarache dossier describes Calogena's heat-only reactor and a nominal 30–45 MWth design evolution but does not call the Cadarache unit CAL30. ASNR's CAL30 design list is not itself a deployment-specific selection. The vendor remains identified; a selected named model/version is not asserted. Last checked 19 Oct 2026. Calogena: Cadarache public consultation dossier
What would change this
A Cadarache application or Calogena design document explicitly names the selected model/version. Next scheduled check: 19 Jan 2027.
- Plant capacity (scope qualified). The project's consultation dossier gives nominal power as 30–45 MWth and describes exploration of an increase from a 30 MWth baseline to 45 MWth. This supports a ranged description, not a finalized point rating. A single point is therefore not stored; no electrical generation is implied. Last checked 19 Oct 2026. Calogena: Cadarache public consultation dossier
What would change this
The creation-authorization application fixes the Cadarache reactor's nominal thermal rating. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. After the consultation closes on 28 November 2026, the dossier says the guarantors report and Calogena then decides how to proceed; it targets filing the creation-authorization application in mid-2027, construction start in late 2029 and entry into service in late 2032. These are targets, not achieved milestones, and the authorization decision rests with the French authorities after ASNR review and a public inquiry. Last checked 23 Oct 2026. Calogena: Cadarache public consultation dossier
What would change this
Calogena's post-consultation decision or the filing of the creation-authorization application. Next scheduled check: 5 Dec 2026.
- Permissions and public process. Calogena's consultation dossier says a voluntary prior public consultation, overseen by guarantors appointed by France's public-debate commission, runs from 28 September to 28 November 2026, and that its findings will form part of the creation-authorization application to the nuclear safety authority ASNR. A public inquiry would follow during the authority's review. The dossier records an ASNR opinion of May 2026 on one safety option; no creation authorization has been applied for or granted. Last checked 23 Oct 2026. Calogena: Cadarache public consultation dossier
What would change this
The guarantors' consultation report, Calogena's decision on next steps, or the filing of the creation-authorization application. Next scheduled check: 5 Dec 2026.
- Site dependencies (land, grid, water). The dossier says CEA would host the project by making a plot on its Cadarache site available, and that CEA and Calogena signed a letter of intent in July 2025 to study siting and connection to the center's existing heat network, which is gas-fired today. It gives a footprint of about 1,200 m² for the building and 3,000 m² for the operating area, and a limited water need of about 5 m³ a day. A letter of intent for studies is not a secured land or heat-connection agreement. Last checked 23 Oct 2026. Calogena: Cadarache public consultation dossier
What would change this
A signed plot-provision or heat-supply agreement between CEA and Calogena, or the creation-authorization application describing the site. Next scheduled check: 15 Dec 2026.
- Spent fuel, waste and closure. The dossier says spent fuel would be stored temporarily on site and then sent to the applicable national treatment, recycling or management routes, that Orano could transport it, that it can be treated at La Hague and that the resulting final waste would meet the acceptance criteria of disposal centers run by the national waste agency Andra. It also notes the French legal duty to provision decommissioning, spent-fuel and waste costs with dedicated assets. These are Calogena's stated plans, not contracts. Last checked 23 Oct 2026. Calogena: Cadarache public consultation dossier
What would change this
A signed Orano transport or treatment contract for the Cadarache unit, or the creation-authorization application's waste and decommissioning plan. Next scheduled check: 15 Dec 2026.
Evidence dates
(0 of 3 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(3)
- Calogena launches prior consultation on its nuclear heating plant at CEA Cadarache (company, accessed 2 Oct 2026)
- ASNR, PRM projects and their fuel-fabrication plants (regulator, accessed 3 Nov 2026)
- Calogena: Cadarache public consultation dossier (company, accessed 19 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Calogena nuclear heating plant at CEA Cadarache — https://smrmap.com/projects/calogena-cadarache/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Calogena nuclear heating plant at CEA Cadarache”. Record reviewed 5 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/calogena-cadarache/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.