Projects / Norway · Siting

Fensfjorden Kjernekraft SMR proposal near Mongstad (Austrheim and Alver)

Fensfjorden Kjernekraft, owned by Norsk Kjernekraft and Austrheim municipality, proposes a nuclear plant of up to 1,200 MW near the Mongstad refinery in Norway.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . 2 of 5 listed sources have a publication or document date recorded here; the newest is 10 Apr 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

It sent a notification with a proposed impact-assessment program to the Energy Ministry on 1 September 2025. In April 2026 it began assessment work for the Mongstad region (Austrheim and Alver). Norsk Kjernekraft's projects are based on commercially available SMR technology; no technology is selected and the capacity figure is not stored. Separate from the Øygarden project. The project's notification describes feasibility work involving Norsk Kjernekraft and DL Energy before Fensfjorden Kjernekraft was established. This is preparatory collaboration; the cited passage does not establish a construction or EPC award.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Norsk Kjernekraft
Vendor for linked design
No selected-design vendor recorded
Location
Proposed Fensfjorden site, Austrheim · Norway · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate location stated in the September 2025 notification, Table 1-1, for proposed properties 130/160 and 130/159. This is a proposed site, not a site approval; final plant extent remains subject to assessment.
Coordinates
60.792, 5.012 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
3 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

Fensfjorden Kjernekraft SMR proposal near Mongstad (Austrheim and Alver) is recorded at Proposed Fensfjorden site, Austrheim, Vestland, Norway. Operator: Norsk Kjernekraft. Recorded vendor: No selected-design vendor is recorded. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: Fensfjorden Kjernekraft: notification with proposed assessment programme, September 2025, September 2025 notification, Table 1-1, approximate location of properties 130/160 and 130/159

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Operator or intended licensed owner
Contractor

Source-backed project statement The notification describes feasibility work involving Norsk Kjernekraft and DL Energy before Fensfjorden Kjernekraft was established. This is preparatory collaboration; the cited passage does not establish a construction or EPC award. Fensfjorden Kjernekraft: notification with proposed assessment programme, September 2025; Norsk Kjernekraft: locations (ten project companies); Norsk Kjernekraft: Fensfjorden Kjernekraft starts impact assessment (10 Apr 2026)

Programs and agreements naming the project
Not found in the sources we checked (4): Customer or offtaker; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

The reviewed sources do not establish a named project-specific power or heat purchaser, contractual quantity or completed offtake. Intended uses, host municipalities and general company customer plans are not buyer commitments. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Norsk Kjernekraft: Austrheim and Norsk Kjernekraft send nuclear assessment notification (1 Sep 2025); Fensfjorden Kjernekraft: notification with proposed assessment programme, September 2025; Norsk Kjernekraft: Taftøy assessment programme set by the government

Funding and government decisions

The reviewed sources do not establish a project-specific financing commitment or amount. General company backing, ownership and policy support do not by themselves establish allocated or paid project funding. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Fensfjorden Kjernekraft: notification with proposed assessment programme, September 2025; Norsk Kjernekraft: Taftøy assessment programme set by the government

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

The reviewed sources do not establish a project-specific fuel supplier commitment or delivery. General supply-market plans and reactor-design fuel requirements are kept separate. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Fensfjorden Kjernekraft: notification with proposed assessment programme, September 2025; Norsk Kjernekraft: Fensfjorden Kjernekraft starts impact assessment (10 Apr 2026)

Comparable schedule revision

Comparable schedule revision not established. The reviewed sources do not establish two dated statements revising the same project milestone. A single target, a fleet-level ambition or a different project’s timetable is not a schedule revision. This finding is confined to the cited sources reviewed on 21 October 2026; it is not evidence that no arrangement exists elsewhere. Damaged table text does not securely associate every year with its milestone; no target is inferred from it. Fensfjorden Kjernekraft: notification with proposed assessment programme, September 2025; Norsk Kjernekraft: Fensfjorden Kjernekraft starts impact assessment (10 Apr 2026); Norsk Kjernekraft: Taftøy assessment programme set by the government

Not recorded in SMRMap's reviewed evidence (3): Project proposer or applicant; Reactor supplier; Site host or owner
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Reactor supplier
Site host or owner

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes)

Evidence dates

(2 of 5 sources with a publication or document date)
Latest dated listed source publication: Norsk Kjernekraft: Fensfjorden Kjernekraft starts impact assessment (10 Apr 2026): 10 Apr 2026.Latest dated recorded event: no date recorded.3 of 5 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(5)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Fensfjorden Kjernekraft SMR proposal near Mongstad (Austrheim and Alver) — https://smrmap.com/projects/fensfjorden-smr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Fensfjorden Kjernekraft SMR proposal near Mongstad (Austrheim and Alver)”. Record reviewed 3 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/fensfjorden-smr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.