Formosa commercial CAREM proposal (2010 agreement)
Historical proposal for a commercial CAREM reactor in Formosa province, distinct from the CAREM-25 prototype at Lima. CNEA’s 2015–2025 strategic plan records the 2010 construction agreement, completed macro-siting and micro-siting work nearing completion. It describes approximately 120 MWe and plans engineering for higher-power CAREM modules. That historical concept figure is not assigned to the CAREM-25 design or treated as a current confirmed plant rating. The parcel, operator, current activity and final disposition remain unverified; the signing location supplies no map pin.
What this record says
Last verified 2026-10-13. This is a record review date, not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
Site and deployment
Formosa commercial CAREM proposal (2010 agreement) is recorded at Formosa CAREM candidate site (undisclosed), Formosa, Argentina. Operator: No operator is recorded. Vendor for a linked design: No selected-design vendor is recorded. Stage: Siting. Location precision: undisclosed. Other documented relationships: Project proposer: CNEA (Argentina).
Capacity
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Permission recorded
- No project-specific regulatory action is recorded here. This is not a finding that no permission exists.
Latest supported development
No actual dated development is recorded.
Next documented milestone
No next milestone date is recorded.
Material unknowns
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- No map pin is shown for this record.
View on map and table · Permissions and applications · Sources and check dates
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Not recorded
- Vendor for linked design
- No selected-design vendor recorded
- Other documented relationships
- Project proposer: CNEA (Argentina) · source
- Location
- Formosa CAREM candidate site (undisclosed) · Argentina · precision: undisclosed
Province and historical site-selection work documented; no selected parcel or signing-city coordinates assigned. - Coordinates
- undisclosed / not plotted
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Inclusion basis
- historical_smr_program
- Confidence
- medium
- Last verified
- 2026-10-13 (publication/verification date)
Milestones & dated events
- No dated milestones recorded yet.
Regulatory actions
- None recorded in this release.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Sources
- CNEA Strategic Plan 2015–2025: commercial CAREM in Formosa (government_primary, accessed 2026-10-13)