Projects / China · Announced
Ningdu multipurpose modular proposal (14th Five-Year plan)
Ningdu county plan describes planning research for six multipurpose modular units totalling 600,000 kW.
Current status
- How current
- General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Thermal output is not recorded on this project.
- No operator is recorded.
- No map pin is shown for this record.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Developer or proposer (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Vendor selection, construction approval, and present disposition are not established. Catalog cancellation was not imported.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Not recorded
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Ningdu multipurpose modular proposal (historical plan) · China · precision: town or locality only
County plan names Ningdu for planning research; exact boundary not verified. - Coordinates
- Town named, no map pin
- Electrical capacity
- 600 MWe (gross/net unspecified) · scope: plant
- Thermal capacity
- Not recorded
- Inclusion basis
- Earlier-plan record (historical SMR program)
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Ningdu multipurpose modular proposal (14th Five-Year plan) is recorded at Ningdu multipurpose modular proposal (historical plan), Jiangxi, China. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: town or locality only; town named, no map pin.
Recorded electrical output is 600 MWe (gross/net unspecified), scope plant. Modules planned: 6. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
Ningdu County's 14th Five-Year Plan, generated 15 April 2021, calls for planning research on a Ningdu small-reactor project and lists six multipurpose modular reactors totalling 600,000 kW, but names no utility, heat user or other recipient of the output. Ningdu county plan naming multipurpose modular units
- Contractor
Ningdu County's 14th Five-Year Plan, generated 15 April 2021, calls only for planning research on the small-reactor project and lists its configuration. It names no design institute, vendor, engineering firm or construction contractor. Ningdu county plan naming multipurpose modular units
- Funding and government decisions
Ningdu County's 14th Five-Year Plan, generated 15 April 2021, lists the six-unit, 600,000 kW multipurpose modular reactor project without any cost, budget or funder. Other yuan figures in the plan concern county statistics or other projects. Ningdu county plan naming multipurpose modular units
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
Ningdu County's 14th Five-Year Plan, generated 15 April 2021, describes the small-reactor project only as a planning study and a six-unit, 600,000 kW configuration. It does not mention fuel, a supplier or a delivery. Ningdu county plan naming multipurpose modular units
- Comparable schedule revision
Comparable schedule revision not established. Ningdu County's 14th Five-Year Plan, generated 15 April 2021, calls for planning research on the reactor project without any construction or operation date, and its 2035 horizon is the plan's own framing. No dated target exists in this source, so no schedule revision is shown. Ningdu county plan naming multipurpose modular units
Not recorded in SMRMap's reviewed evidence (5): Project proposer or applicant; Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- Reviewed 19 Oct 2026: not disclosed in the reviewed evidence.
- Operator or intended licensed owner
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(6 notes, 2 not yet reviewed)
- Evidence review. Ningdu's county plan calls for planning research into a small-reactor nuclear-power proposal and lists six multipurpose modular reactors with 600,000 kW total installed capacity. The stored six planned units and 600 MWe plant total describe that historical planning configuration, with gross/net unspecified. The source does not select a design, identify a vendor/operator, approve construction or establish present implementation. No per-module rating is calculated from the total. Last checked 19 Oct 2026. Ningdu county plan naming multipurpose modular units
What would change this
A later Ningdu government or project-company document identifying the technology, site, responsible companies and permission or disposition after the county planning research. Next scheduled check: 19 Jan 2027.
- Design identified: Not disclosed in the reviewed evidence. The plan names multipurpose modular reactors, not a selected model or vendor. Last checked 19 Oct 2026. Ningdu county plan naming multipurpose modular units
What would change this
A later Ningdu government or project-company document identifying the technology, site, responsible companies and permission or disposition after the county planning research. Next scheduled check: 19 Jan 2027.
- Developer or proposer: Not disclosed in the reviewed evidence. The county plan entry does not name a project developer or operator. Last checked 19 Oct 2026. Ningdu county plan naming multipurpose modular units
What would change this
A later Ningdu government or project-company document identifying the technology, site, responsible companies and permission or disposition after the county planning research. Next scheduled check: 19 Jan 2027.
- Site location recorded as disclosed: Not disclosed in the reviewed evidence. The plan names Ningdu county but does not disclose the plant boundary or plot. Last checked 19 Oct 2026. Ningdu county plan naming multipurpose modular units
What would change this
A later Ningdu government or project-company document identifying the technology, site, responsible companies and permission or disposition after the county planning research. Next scheduled check: 19 Jan 2027.
- Permissions and public process. Ningdu county's 14th Five-Year Plan outline, dated April 2021, says the county will plan and study a small-reactor nuclear power project and lists a project of six multipurpose modular reactors totalling 600,000 kW among key energy projects. A county plan entry is not a permission; no developer, state approval, siting opinion or environmental filing is named in it. Last checked 23 Oct 2026. Ningdu county plan naming multipurpose modular units
What would change this
A developer announcement, provincial preliminary-work approval or NNSA/MEE filing for a Ningdu small reactor. Next scheduled check: 23 Oct 2027.
- Site dependencies (land, grid, water). The April 2021 Ningdu county plan lists the six-unit modular reactor project only at county level as something to plan and study. It names no site within the county, land arrangement, grid connection or water supply. Last checked 23 Oct 2026. Ningdu county plan naming multipurpose modular units
What would change this
A siting study or announcement naming the Ningdu reactor site. Next scheduled check: 23 Oct 2027.
Not yet reviewed against sources: Spent fuel, waste and closure; Next decision and prerequisites. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 1 source with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(1)
- Ningdu county plan naming multipurpose modular units (government, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Ningdu multipurpose modular proposal (14th Five-Year plan) — https://smrmap.com/projects/ningdu-modular-plan/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Ningdu multipurpose modular proposal (14th Five-Year plan)”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/ningdu-modular-plan/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.