Projects / China · Announced

Ruijin HTR nuclear power proposal (Jiangxi)

CNEC and Ruijin proposed two 600 MWe high-temperature reactors built from HTR-PM-type modules; the pre-feasibility study passed review in April 2015 with a 2017 construction target that was not met.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Developer or proposer. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

No later primary evidence was found; global trackers mark it canceled, but this record does not infer cancellation. Distinct from the Ningdu proposal.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
No selected-design vendor recorded
Location
Ruijin · China · precision: town or locality only
The sources name this place but publish no coordinate for it, so no pin is shown.
Coordinates
Town named, no map pin
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
SMR by design class
Confidence
low
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

Ruijin HTR nuclear power proposal (Jiangxi) is recorded at Ruijin, Jiangxi, China. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: town or locality only; town named, no map pin.

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

World Nuclear News of 27 April 2015 and the China Atomic Energy Authority item of 21 April 2015 describe CNEC's October 2013 framework agreement with the Ruijin city government and the November 2014 project company, but name no buyer of the plant's power or heat. The city is the agreement counterparty, not a stated offtaker. WNN: Ruijin HTR plant proposal progresses

Contractor

World Nuclear News of 27 April 2015 says CNEC, the proposer, signed a framework agreement with the Ruijin city government in 2013 and set up the project company Ruijin Nuclear Engineering HTR NPP Company in November 2014, and that the pre-feasibility study passed review in April 2015. The two pages name no separate engineering or construction contractor, and NDRC and National Nuclear Safety Administration approvals were still required. WNN: Ruijin HTR plant proposal progresses

Funding and government decisions

World Nuclear News of 27 April 2015 and the China Atomic Energy Authority item of 21 April 2015 describe the proposal, project company and approval steps but state no investment, budget or financing for the Ruijin units. WNN: Ruijin HTR plant proposal progresses

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

The China Atomic Energy Authority item of 21 April 2015 credits the reactor's safety partly to high-temperature-resistant fuel elements and says CNEC offers fuel supply among export services, but names no fuel manufacturer, quantity or delivery for the Ruijin units. CAEA: Jiangxi Ruijin HTR project

Comparable schedule revision

Comparable schedule revision not established. World Nuclear News of 27 April 2015 expects construction to start in 2017 with grid connection in 2021, and the China Atomic Energy Authority item of 21 April 2015 gives the same 2017 start for phase one after national approval and a construction license. The two sources state the same target, and no later source read revises it. WNN: Ruijin HTR plant proposal progresses; CAEA: Jiangxi Ruijin HTR project

Not recorded in SMRMap's reviewed evidence (5): Project proposer or applicant; Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
Operator or intended licensed owner
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes, 1 not yet reviewed)
  • Evidence review. The 27 April 2015 World Nuclear News report says a proposal for two 600 MWe high-temperature gas-cooled reactors at Ruijin city in Jiangxi passed a preliminary feasibility review. It says the design is based on the HTR-PM demonstration and that a displayed model of a 600 MWe plant has three 200 MWe modules. That model is not stored as this project's module count, and two times 600 is not stored as a plant total. The China Atomic Energy Authority capture says the 600 MW Ruijin pre-feasibility study passed expert review and that phase one of two units was planned to start in 2017 after national approval and a construction license. Those dates are targets. No later cancellation is in these two pages, so the stage stays announced. Last checked 20 Oct 2026. WNN: Ruijin HTR plant proposal progresses; CAEA: Jiangxi Ruijin HTR project
    What would change this

    An NDRC listing, an NNSA construction-license decision, or a later primary notice that this Ruijin proposal stopped. Next scheduled check: 20 Jan 2027.

  • Design identified: Not disclosed in the reviewed evidence. World Nuclear News says the Ruijin reactors are based on the HTR-PM demonstration. A separate sentence describes a displayed model of a 600 MWe plant with three 200 MWe modules. The model is not stated as Ruijin's committed layout, so no design record and no module count are stored. Last checked 20 Oct 2026. WNN: Ruijin HTR plant proposal progresses
    What would change this

    A design document that names the Ruijin configuration and its module count. Next scheduled check: 20 Jan 2027.

  • Developer or proposer. The report names China Nuclear Engineering Corporation, the Ruijin city government, and Ruijin Nuclear Engineering HTR NPP Company Limited. These source-named participants do not yet have linked organization profiles. The Huaneng sentence on the same page is about the Shidaowan demonstration, not this project. Last checked 20 Oct 2026. WNN: Ruijin HTR plant proposal progresses
    What would change this

    An organization record for CNEC or the Ruijin project company, tied to a passage that names this plant. Next scheduled check: 20 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. Both pages place the proposal at Ruijin in Jiangxi. They do not give a plot or coordinates. The stored location names only the city, and no pin is added. Last checked 20 Oct 2026. WNN: Ruijin HTR plant proposal progresses; CAEA: Jiangxi Ruijin HTR project
    What would change this

    A siting notice with a Ruijin plot rather than the city name alone. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites. The April 2015 CNEC briefing set the next step as CNEC and Jiangxi submitting a project proposal to the NDRC for inclusion in the national nuclear plan, then a feasibility study, state approval and an NNSA construction license, with construction of two units planned for 2017. The 2017 target passed without evidence of construction, and whether the NDRC proposal was made or decided is not shown in the sources reviewed. Last checked 23 Oct 2026. CAEA: Jiangxi Ruijin HTR project
    What would change this

    An NDRC decision on Ruijin, or a CNEC/Chinergy statement on the project after 2015. Next scheduled check: 23 Oct 2027.

  • Permissions and public process. An April 2015 CNEC briefing republished by the China Atomic Energy Authority says the Ruijin HTR project's pre-feasibility study passed expert review, and World Nuclear News reported that Jiangxi's development and reform commission had approved starting preliminary work. These are study and provincial preparatory steps; state approval and an NNSA construction license were still required, and neither is shown in the sources reviewed. Last checked 23 Oct 2026. CAEA: Jiangxi Ruijin HTR project; WNN: Ruijin HTR plant proposal progresses
    What would change this

    NDRC inclusion of Ruijin in the national nuclear plan, a state approval or an NNSA license. Next scheduled check: 23 Oct 2027.

  • Site dependencies (land, grid, water). World Nuclear News reported in 2015 that CNEC signed a framework agreement with the Ruijin city government in 2013 to build an HTR plant there, and the 2015 CNEC briefing says land acquisition and site preparation would only proceed after NDRC consent. No land acquisition, grid connection or water arrangement is shown as completed in the sources reviewed. Last checked 23 Oct 2026. WNN: Ruijin HTR plant proposal progresses; CAEA: Jiangxi Ruijin HTR project
    What would change this

    NDRC consent followed by land acquisition or a site preparation announcement at Ruijin. Next scheduled check: 23 Oct 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 2 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.2 of 2 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Ruijin HTR nuclear power proposal (Jiangxi) — https://smrmap.com/projects/ruijin-htr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Ruijin HTR nuclear power proposal (Jiangxi)”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/ruijin-htr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.