Projects / Canada · Announced
StarCore demonstration reactor at the Whiteshell Laboratories site, Pinawa
StarCore and the Local Government District of Pinawa describe a demonstration at the former Whiteshell Laboratories site.
Current status
- How current
- General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- Commercial operation: 2030 (target). StarCore targets first commercial power. This is not an achieved milestone. Source: StarCore: investor and technology description; StarCore: Pinawa demonstration reactor.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- The mapped point is not an exact surveyed coordinate.
- Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
The current investor page, read 13 October 2026, identifies Whiteshell as its first facility, describes an intended own-and-operate model and targets first commercial power in 2030. That is a company target, not a license, construction start or operating milestone. The undated project page still targets fall 2026 groundbreaking and operations by end 2028, while the undated investor page targets first commercial power 2030. These company schedules are not reconciled. Pinawa’s module count and plant output are not established; the current 10 MWe platform is not silently equated to the historical 14 MWe design.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- StarCore Nuclear
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Whiteshell Laboratories site, Pinawa · Canada · precision: site area (named plant, laboratory, base, port, campus or parcel)
Site point from the Wikipedia article for Whiteshell Laboratories, the former laboratory site near Pinawa that the company names; no reactor position is published. - Coordinates
- 50.17842, -96.06075 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 13 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
StarCore demonstration reactor at the Whiteshell Laboratories site, Pinawa is recorded at Whiteshell Laboratories site, Pinawa, Manitoba, Canada. Operator: StarCore Nuclear. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: Wikipedia: Whiteshell Laboratories (article coordinates), Article coordinate 50.17842, -96.06075 on 'Whiteshell Laboratories', read 30 October 2026
Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Project proposerStarCore Nuclear · source
- Operator or intended licensed owner
- OperatorStarCore Nuclear
- Customer or offtaker
Source-backed project statement StarCore's undated Pinawa project page, read 13 October 2026, says that for demonstration purposes Pinawa is willing to become an off-grid community powered by the StarCore SMR, while noting residents will not directly benefit because they already have hydro power. This is a stated willingness, not a supply agreement, and StarCore's investor page describes future power purchase agreements only as its general model. StarCore: Pinawa demonstration reactor
Not found in the sources we checked (4): Contractor; Funding and government decisions; Fuel; Comparable schedule revision
- Contractor
StarCore's Pinawa project page names the Local Government District of Pinawa as demonstration partner and the University of Manitoba as a research partner, and its investor page describes an own-and-operate model. Neither page names an engineering or construction contractor for the Whiteshell demonstration. StarCore: Pinawa demonstration reactor
- Funding and government decisions
StarCore's investor page describes raising company capital through Simple Agreements for Future Equity and cites Canada's national 5 billion dollar SMR framework, and its Pinawa page estimates 600 million dollars of economic activity in eastern Manitoba. These are company financing, a national figure and an economic estimate. Neither page states a funder or amount for the Pinawa demonstration. StarCore: Pinawa demonstration reactor; StarCore: investor and technology description
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
StarCore's investor page says its reactor uses TRISO fuel and lists a signed fuel supply agreement among company milestones, without naming the supplier or saying the agreement covers the Pinawa demonstration. No quantity or delivery for Pinawa is stated. StarCore: investor and technology description
- Comparable schedule revision
StarCore's Pinawa demonstration page says it plans to break ground in fall 2026 and begin operations by the end of 2028, while its investor page, read in October 2026, says it is moving toward first commercial power in 2030. Neither page is dated, so the difference cannot be placed as a dated revision, but the two pages give different years for the start of operation. StarCore: Pinawa demonstration reactor; StarCore: investor and technology description
Not recorded in SMRMap's reviewed evidence (3): Reactor supplier; Site host or owner; Programs and agreements naming the project
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
Targets
Planned, target and estimated dates are not achievements or commitments.
- Target · Commercial operation
StarCore targets first commercial power
This project’s dated entries are in Updates, filtered to this project. New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(6 notes, 1 not yet reviewed)
- Evidence review. The StarCore project page says the company is partnering with the Local Government District of Pinawa to demonstrate its first SMR at the Whiteshell Laboratories site, and that the plan is groundbreaking in fall 2026 and operations by the end of 2028. The investor page says the first facility will be built near Pinawa at Whiteshell and that the company is moving toward first commercial power in 2030. Those target years are not reconciled. The 10 MWe wording is the company platform, and additional cores are described as optional, so neither is stored as this project's rating or count. The listed license to construct is a planned phase, not a granted license. Last checked 20 Oct 2026. StarCore: Pinawa demonstration reactor; StarCore: investor and technology description
What would change this
A StarCore or Pinawa notice that reconciles the 2028 and 2030 targets, or a filed license application for Whiteshell. Next scheduled check: 20 Jan 2027.
- Design identified: Not disclosed in the reviewed evidence. The pages say a StarCore SMR and describe a 10 MWe platform with optional additional cores. They do not state that the Pinawa demonstration is a committed 10 MWe plant or name a separate design record to store. Last checked 20 Oct 2026. StarCore: investor and technology description; StarCore: Pinawa demonstration reactor
What would change this
A project sheet that states the Pinawa unit's output and core count. Next scheduled check: 20 Jan 2027.
- Site location recorded as disclosed. Both pages name the Whiteshell Laboratories site near Pinawa, Manitoba. They give no coordinates; the map shows a site point for the former laboratory. Last checked 20 Oct 2026. StarCore: Pinawa demonstration reactor; StarCore: investor and technology description
What would change this
A site plan that places the reactor inside the Whiteshell property. Next scheduled check: 20 Jan 2027.
- Next decision and prerequisites: Not disclosed in the reviewed evidence. StarCore's investor page targets first commercial power in 2030 but names no next licensing filing, investment decision or responsible party for it. The project page describes the planned demonstration without dates. Last checked 23 Oct 2026. StarCore: investor and technology description
What would change this
A StarCore license application, financing close or CNSC notice. Next scheduled check: 21 Jan 2027.
- Permissions and public process. StarCore's investor page, read in October 2026, reports long-running CNSC engagement, five memorandums of understanding with First Nations and 27 local letters of support. These are company statements; the pages name no filed license application, environmental assessment or regulator decision for the Whiteshell demonstration. Last checked 23 Oct 2026. StarCore: investor and technology description
What would change this
A CNSC license application or environmental-assessment record for a StarCore reactor at Whiteshell. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water). StarCore says its first plant would be built at the Whiteshell Laboratories nuclear research site near Pinawa, Manitoba, which it describes as having an existing grid connection and over 1,000 acres, and that its helium-cooled design needs no nearby water body. These are company descriptions; no land agreement or connection terms are published. Last checked 23 Oct 2026. StarCore: investor and technology description
What would change this
A site lease, license application or CNSC record describing land and grid arrangements at Whiteshell. Next scheduled check: 21 Jan 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 2 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(2)
- StarCore: Pinawa demonstration reactor (company, accessed 13 Oct 2026)
- StarCore: investor and technology description (company, accessed 13 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: StarCore demonstration reactor at the Whiteshell Laboratories site, Pinawa — https://smrmap.com/projects/starcore-pinawa/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “StarCore demonstration reactor at the Whiteshell Laboratories site, Pinawa”. Record reviewed 13 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/starcore-pinawa/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.