Projects / China · Announced
Yantai nuclear seawater desalination project (NHR200-I, 2003)
The Yantai nuclear seawater desalination project, a historical heat-only proposal in China, is listed by INET as established in 2003 on the NHR200-I line.
Current status
- How current
- Record checked · Evidence reviewed · Next recheck due
Development and review dates
Newest recorded development . 2 of 5 listed sources have a publication or document date recorded here; the newest is Sep 2005. Status not rechecked since the record check; this project is not covered by the nightly status check. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- Mar 2003 · Recorded development: Yantai nuclear seawater desalination project: state approval of the project proposal. INET's NHR200 page states that the Shandong nuclear seawater desalination project received state approval of its project proposal in March 2003. Source: INET, Tsinghua University: NHR200 low-temperature heating reactor page; INET presentation to IAEA INPRO: NHR200-I project list (2019). Updates entry
More on this development
The 2019 INPRO slides name that project at Yantai.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Thermal output is not recorded on this project.
- No operator is recorded.
- No map pin is shown for this record.
- Not yet recorded for this stage: Design identified (not stated in the sources read); Developer or proposer. Not recorded does not mean zero or that none exists; the description and sources may say more.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
View on the map · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
The listing comes from INET's 2019 presentation to an IAEA INPRO meeting, by the director of the NHR project division, which places the project with the Daqing construction permit (1996) and the Shenyang heating project (2001), and before NHR200-II general design in 2006. INET's NHR200 page states that the Shandong nuclear seawater desalination project received state approval of its project proposal in March 2003. Unit count, thermal output and the site within Yantai are not stated, and no later construction or cancellation record was opened. The NHR-200 heating reactor is documented in IAEA-TECDOC-965 among small reactor designs, which is the historical basis for inclusion. No design profile is linked. A September 2005 IAEA newsletter contribution by a Tsinghua University author names Hao-Xin Investment Co. as the planned plant's owner and INET as its engineering contractor; neither is recorded as an operator. The record is separate from the Shenyang project, the Daqing project, the Haiyang integrated small reactor and the 2018 CNNC Yantai proposals.
Key facts
- Design
- Design profile not linked (SMR)
- Technology
- Not recorded on a linked design profile — see the description
- Operator(s)
- Not recorded
- Vendor for linked design
- No selected-design vendor recorded
- Location
- Yantai (site not stated) · China · precision: town or locality only
INET's 2019 INPRO slides name Yantai. No parcel is published and no pin is shown. - Coordinates
- Town named, no map pin
- Electrical capacity
- thermal only (no MWe) · scope: plant
- Thermal capacity
- Not recorded
- Modules planned
- Not recorded
- Record reviewed
- 6 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes
Yantai nuclear seawater desalination project (NHR200-I, 2003) is recorded at Yantai (site not stated), Shandong, China. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: town or locality only; town named, no map pin.
This project is recorded as thermal only (no MWe). Module count is not recorded. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Contractor
Source-backed project statement A September 2005 IAEA desalination newsletter article by a Tsinghua University author names Tsinghua University's Institute of Nuclear and New Energy Technology (INET) as engineering contractor for the planned Shandong nuclear desalination demonstration plant, whose feasibility study began in March 2003. That is an engineering role during study, not a construction contract, and no construction contractor is named. IAEA INDAG Newsletter No. 5 (September 2005)
Not found in the sources we checked (4): Customer or offtaker; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
Tsinghua University INET's NHR200 page says the Shandong nuclear seawater desalination project received state approval of its proposal in March 2003, and INET's 2019 INPRO slides list a Yantai nuclear desalination project established in 2003. Neither names a recipient of the project's water or heat. INET, Tsinghua University: NHR200 low-temperature heating reactor page; INET presentation to IAEA INPRO: NHR200-I project list (2019)
- Funding and government decisions
Tsinghua University INET's NHR200 page records state approval of the Shandong desalination project's proposal in March 2003 but states no funder, investment or financing. INET, Tsinghua University: NHR200 low-temperature heating reactor page
- Fuel
- No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.
Tsinghua University INET's NHR200 page and 2019 INPRO slides describe the NHR200 reactor line and list the Yantai project but name no fuel supplier or delivery for it. INET presentation to IAEA INPRO: NHR200-I project list (2019)
- Comparable schedule revision
Comparable schedule revision not established. Tsinghua University INET's NHR200 page dates only the March 2003 state approval of the Shandong desalination project's proposal, and the 2019 INPRO slides only its 2003 establishment. No construction or operation target is given, so there is nothing to revise. INET, Tsinghua University: NHR200 low-temperature heating reactor page
Not recorded in SMRMap's reviewed evidence (5): Project proposer or applicant; Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- Operator or intended licensed owner
- Reactor supplier
- Site host or owner
- Programs and agreements naming the project
Timeline
Recorded developments
- · Recorded development
Yantai nuclear seawater desalination project: state approval of the project proposal
This project’s dated entries are in Updates, filtered to this project. New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(7 notes, 1 not yet reviewed)
- Evidence review. INET's NHR200 page says the Shandong nuclear seawater desalination project received state approval of its project proposal in March 2003, in the same sentence as the separate Shenyang heating project. The 2019 INPRO slides list a Yantai nuclear seawater desalination project as established in 2003 on the NHR200-I line, after the Daqing construction permit of 1996 and the Shenyang project of 2001, and before NHR200-II general design in 2006. Project-proposal approval is not a construction permit. No output is stated for the Yantai project. The heating-reactor catalog does not name Yantai. Last checked 20 Oct 2026. INET, Tsinghua University: NHR200 low-temperature heating reactor page; INET presentation to IAEA INPRO: NHR200-I project list (2019)
What would change this
A document that names a Yantai parcel and a construction permit for this desalination project. Next recheck due .
- Design identified: Not disclosed in the reviewed evidence. The slides place the 2003 Yantai project on the NHR200-I line. NHR200-II general design is dated 2006. No output is given for Yantai, and the empty design field stays empty. Last checked 20 Oct 2026. INET presentation to IAEA INPRO: NHR200-I project list (2019)
What would change this
A project document that selects NHR200-I or another model for Yantai. Next recheck due .
- Developer or proposer. A September 2005 IAEA desalination newsletter article by a Tsinghua University author names Hao-Xin Investment Co. as the owner of the planned Shandong nuclear desalination demonstration plant, the project INET dates to a March 2003 state approval. That is a 2005 statement of the planned plant's owner, not an operator or license holder, and the company's full legal identity is not established. Last checked 23 Oct 2026. IAEA INDAG Newsletter No. 5 (September 2005); INET, Tsinghua University: NHR200 low-temperature heating reactor page
What would change this
A company registration or later project document confirming the Yantai plant's owner and whether the project continued. Next recheck due .
- Site location recorded as disclosed: Not disclosed in the reviewed evidence. The slides name Yantai, and the INET page says Shandong. Neither gives a parcel or coordinates. The stored location names only the city, and no pin is added. Last checked 20 Oct 2026. INET presentation to IAEA INPRO: NHR200-I project list (2019); INET, Tsinghua University: NHR200 low-temperature heating reactor page
What would change this
A siting note that names a parcel in Yantai. Next recheck due .
- Permissions and public process. Tsinghua INET's NHR200 page says the Shandong nuclear seawater desalination project received state approval of its project proposal in March 2003. That is an early planning approval, not a nuclear license; the page records no siting, construction or operating license, and the site within Yantai is not stated. Last checked 23 Oct 2026. INET, Tsinghua University: NHR200 low-temperature heating reactor page
What would change this
An NNSA license record or contemporaneous document on the Yantai desalination project after 2003. Next recheck due .
- Next decision and prerequisites. A September 2005 IAEA desalination newsletter article by a Tsinghua University author says the plant's pre-feasibility study was approved by the central government in 2002 and 2003, its feasibility study began in March 2003 and was expected to be completed in 2005, and that after assessment of that study it would be decided whether to build the plant. That build decision is the stated next step and its 2005 target has passed; whether it was taken, and the project's later disposition, are not recorded in the sources reviewed. Last checked 23 Oct 2026. IAEA INDAG Newsletter No. 5 (September 2005)
What would change this
A government decision or owner/INET statement on building, deferring or abandoning the Shandong desalination plant after its feasibility study. Next recheck due .
- Site dependencies (land, grid, water). An August 2001 IAEA Board and General Conference report says China had begun a pre-feasibility study of a nuclear seawater desalination plant in the Yantai area, coupling an NHR-200 heating reactor to a vertical-tube multi-effect distillation process for 160,000 cubic metres a day. A September 2005 IAEA desalination newsletter article by a Tsinghua University author places the plant on the Shandong Peninsula. Neither names a parcel, seawater intake, grid connection or water buyer; these are study-stage descriptions, not secured site arrangements. Last checked 23 Oct 2026. Plan for producing potable water economically using small and medium sized nuclear reactors (GOV/2001/32-GC(45)/15); IAEA INDAG Newsletter No. 5 (September 2005)
What would change this
A feasibility report, site approval or environmental document naming the plant's site, intake and water offtake arrangements. Next recheck due .
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(2 of 5 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(5)
- INET, Tsinghua University: NHR200 low-temperature heating reactor page (company, accessed 6 Oct 2026)
- INET presentation to IAEA INPRO: NHR200-I project list (2019) (IAEA/NEA, accessed 6 Oct 2026)
- IAEA-TECDOC-965: Design approaches for heating reactors (IAEA/NEA, accessed 2 Oct 2026)
- IAEA INDAG Newsletter No. 5 (September 2005) (IAEA/NEA, published Sep 2005, accessed 23 Oct 2026)
- Plan for producing potable water economically using small and medium sized nuclear reactors (GOV/2001/32-GC(45)/15) (IAEA/NEA, published 9 Aug 2001, accessed 23 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Yantai nuclear seawater desalination project (NHR200-I, 2003) — https://smrmap.com/projects/yantai-nhr200-desalination-2003/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Yantai nuclear seawater desalination project (NHR200-I, 2003)”. Record reviewed 6 Oct 2026. https://smrmap.com/projects/yantai-nhr200-desalination-2003/ (accessed [date]).
“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.
Record details
- Inclusion basis
- Proposal from an earlier SMR program
- Confidence (as stored in the record)
- medium
Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.