SVBR-100
Lead-bismuth cooled SVBR-100 small modular reactor identity used for the Dimitrovgrad pilot proposal record. Aligned with the dated ARIS SVBR-100 design profile without importing unverified module output figures.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- No live project recorded here; 1 canceled (Dimitrovgrad SVBR-100 pilot proposal). Development status as stated in the catalog dated 15 Oct 2024: Detailed design.
- Evidence
- 2 sources; first primary source: ARIS original status report — SVBR-100 (2024-10-15). Record reviewed 14 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 15 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead bismuth
- Spectrum
- Fast
- Developer / vendor(s) as of 15 Oct 2024
- AKME-engineering JSC
- Fuel form
- UO2 - FOAK; UO2 / (U-Pu)O2 / (U Pu)N / (U-Pu)C - NOAK
- Development status (as stated)
- Detailed design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 14 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Dimitrovgrad SVBR-100 pilot proposal (2013 land lease) — Canceled · Russia
Design sources
(2)
- ARIS original status report — SVBR-100 (2024-10-15) (IAEA/NEA, accessed 2 Oct 2026)
- WNN: Land secured for SVBR-100 pilot at Dimitrovgrad (news report, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The ARIS status report identifies SVBR-100 as a lead-bismuth cooled fast reactor and classifies the design status as detailed design. Those are identity and classification facts. The report also contains a capacity figure, which is not reused. World Nuclear News on 18 June 2013 says AKME-Engineering, a company set up by Rosatom in 2009 to develop and commercialise the SVBR-100, agreed to lease land for a pilot plant in Dimitrovgrad. That article does not state a module megawatt rating. This record is an identity profile, so no module rating would be stored even from a citable number. Stored lead-bismuth coolant, fast spectrum and detailed-design status match the ARIS classification. Last checked 19 Oct 2026. ARIS original status report — SVBR-100 (2024-10-15); WNN: Land secured for SVBR-100 pilot at Dimitrovgrad
What would change this
A non-ARIS AKME or regulator design document that states a reusable module output with basis. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. No reusable published source states a module rating. The ARIS report contains a capacity figure that is not reused under the ARIS rule, and the World Nuclear News land-lease article states no megawatt output. This identity profile would not store a module rating in any case. Last checked 19 Oct 2026. ARIS original status report — SVBR-100 (2024-10-15); WNN: Land secured for SVBR-100 pilot at Dimitrovgrad
What would change this
A citable AKME or regulator specification with SVBR-100 module MWe or MWth. ARIS parameters would still not be copied. Next scheduled check: 19 Jan 2027.