BlueCore Energy
Developer of the BC-15 barge-mounted light-water reactor, in NRC pre-application.
- Projects
- Siting: BlueCore BC-15 floating plant proposal at the Port of Long Beach. 1 design.
- Evidence
- One source (regulator): NRC: BlueCore Energy (pre-application). Record reviewed 2 Oct 2026.
Key facts · Designs · Tracked projects · Ownership · Milestones · Sources · Its projects in the table · Who is involved
Key facts
- Organization type
- Reactor developer, Vendor
- Category
- vendor
- Country
- United States
- Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current activity)
All fields
(5 without a known value)
- Aliases
- None recorded in this release
- Listing status
- Unknown (no listing is recorded here; this does not mean the organization is private)
- Exchange / ticker
- None recorded in this release
- Ownership / control
- Unknown (no owner or controller is recorded here)
- Website
- None recorded in this release
Linked designs
- BlueCore BC-15 — Pressurized water reactor (PWR) · SMR
Tracked deployment projects
1 linked project record: 1 siting, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- BlueCore BC-15 floating plant proposal at the Port of Long Beach — Siting · United States
Recorded link: vendor/developer field · project record checked 9 Oct 2026 · timeline · permission status · sources
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
(1)
- NRC: BlueCore Energy (pre-application) (regulator, accessed 2 Oct 2026)