BlueCore BC-15
Floating, barge-mounted pressurized water reactor: 45 MWt, about 15 MWe gross and 10 MWe net, renamed from BC-12 in September 2026. In NRC pre-application.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- Siting: BlueCore BC-15 floating plant proposal at the Port of Long Beach.
- Evidence
- One source (regulator): NRC: BlueCore Energy (pre-application). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
The NRC's pre-application page says BlueCore is developing a 45 MWt pressurized water reactor, at pre-application stage. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s)
- BlueCore Energy
- Module electrical
- 15 MWe (gross)
- Module thermal
- 45 MWth (nameplate; basis unspecified)
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- BlueCore BC-15 floating plant proposal at the Port of Long Beach — Siting · United States
Design sources
(1)
- NRC: BlueCore Energy (pre-application) (regulator, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The NRC pre-application page (last updated 2 October 2026) says BlueCore Energy, Inc. is developing its Nautilus Floating Nuclear Power Plant, a 45 MWt pressurized water reactor for deployment on a non-self-propelled barge, using the BlueCore-15 (BC-15) reactor. The BC-15 uses standard 17x17 OFA fuel with LEU UO2 at 4.95% enrichment and light water as coolant and moderator. NRC has been in pre-application engagement since July 2026 towards a future 10 CFR Part 50 application; this is a pre-application stage, not a design approval or permit. The page gives the Port of Long Beach, California as the reference operating location, which matches the linked Long Beach proposal. The stored vendor, light-water coolant, thermal spectrum (light-water moderated) and 45 MWt stay; the stored 15 MWe gross and 10 MWe net figures and the September 2026 renaming from BC-12 are not stated on the opened page, which gives no electrical output. Last checked 19 Oct 2026. NRC: BlueCore Energy (pre-application)
What would change this
BlueCore's NRC regulatory engagement plan (ML26261A477) or letter of intent (ML26223A527), which would confirm or correct the electrical rating and naming history, or the Part 50 application itself. Next scheduled check: 19 Jan 2027.
- Technology family. The NRC's pre-application page says BlueCore is developing a 45 MWt pressurized water reactor, at pre-application stage. Last checked 3 Nov 2026. NRC: BlueCore Energy (pre-application)
What would change this
BlueCore or NRC material that changes the BC-15 reactor type or layout. Next scheduled check: 3 Feb 2027.