CGN Ocean Energy
CGN subsidiary named in the November 2025 siting-stage environmental assessment as owner and operator of the Huakun One floating reactor platform demonstration at the Taipingling site. NNSA's site-selection opinion of 2 November 2026 names it as the project's operating organization.
- Evidence
- 3 sources; first primary source: MEE: siting-stage environmental impact report (November 2025), Huakun One science and technology demonstration project. Record reviewed 6 Oct 2026.
Key facts · Designs · Tracked projects · Ownership · Milestones · Sources · Its projects in the table · Who is involved
Key facts
- Organization type
- Operator
- Category
- operator
- Country
- China
- Listing status
- State-controlled (not independently listed) · source MEE: siting-stage environmental impact report (November 2025), Huakun One science and technology demonstration project · listing checked 6 Nov 2026
- Ownership / control
- State-controlled
Its Nov 2025 siting-stage EIA says the Huakun One project is developed under CGN Group's controlling stake, with CGN Ocean Energy as the investment entity. CGN Group is shown as a state-owned legal person holding 58.89% of CGN Power (2024 annual report summary). - Record reviewed
- 6 Oct 2026 (record review date, not proof of current activity)
All fields
(3 without a known value)
- Aliases
- None recorded in this release
- Exchange / ticker
- None recorded in this release
- Website
- None recorded in this release
Linked designs
- No designs tracked here.
Tracked deployment projects
1 linked project record: 1 siting, counting every project that names this organization in any recorded role (vendor, operator or participant). These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- Huakun One floating reactor platform demonstration at the Taipingling site — Siting · China
Recorded role: operator or host · record checked 6 Oct 2026 · timeline · 1 recorded project action · sources
Ownership & relationships
- China General Nuclear Power Group (中国广核集团有限公司): Subsidiary of · as of 6 Nov 2026. Recorded in the 2026-11-06 listing check.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Not yet established about this organization
- None noted for this organization; linked projects may still have open evidence.
Sources
(3)
- MEE: siting-stage environmental impact report (November 2025), Huakun One science and technology demonstration project (government, accessed 6 Oct 2026)
- NNSA: site-selection review opinion No. 2620 for the Huakun One science and technology demonstration project (2 November 2026) (regulator, dated 2 Nov 2026, accessed 4 Nov 2026)
- 中国广核电力股份有限公司 2024 年年度报告摘要 (company, published 27 Mar 2025, accessed 6 Nov 2026)
Cite or share this page
SMRMap. “CGN Ocean Energy”. Record reviewed 6 Oct 2026. https://smrmap.com/companies/cgn-ocean-energy/ (accessed [date]).
“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.
Record details
- Confidence (as stored in the record)
- medium
Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.