Projects

222 source-linked projects and proposals in 30 countries, including announced, suspended and canceled records. The table and the map show the same matching projects.

Browse by country · Browse by stage · What the reactor types mean

Showing 222 of 222 projects

151 on the map at 118 locations · 71 without a map pin: 43 name a site or town, not pinned; 28 name no site · 16 canceled or suspended

Project and categoryCountryStageDesignCapacityRecorded organizationsLocationRecord reviewed
Akademik Lomonosov floating NPPSMRRussiaOperatingKLT-40S70 MWe (gross) · plant · 300 MWth (nameplate; basis unspecified)Pevek floating NPP berthChukotka · site-area point (approximate)18 Oct 2026Latest source 19 Aug 2026Latest event 22 May 2020
HTR-10 high-temperature gas-cooled test reactor, Tsinghua INETSMRChinaOperatingHTR-102 MWe (gross/net unspecified) · plant · 10 MWth (nameplate; basis unspecified)INET, Tsinghua University (Changping)Beijing · site-area point (approximate)18 Oct 2026Latest source, document dated 7 Apr 2024Latest event Oct 2004
HTR-PM Shidaowan demonstrationSMRChinaOperatingHTR-PM210 MWe (gross) · plant · 500 MWth (nameplate; basis unspecified)Shidaowan / Shidao BayShandong · site-area point (approximate)19 Oct 2026Latest source, document dated 20 Aug 2021Latest event 6 Dec 2023
HTTR test reactor with planned hydrogen coupling, OaraiSMRJapanOperatingHTTR30 MWth (thermal only; nameplate; basis unspecified)JAEA Oarai Nuclear Engineering InstituteIbaraki · site-area point (approximate)18 Oct 2026Latest source 27 Mar 2025Latest event 26 Sep 2025
TMSR-LF1 thorium molten-salt experimental reactor, WuweiSMRChinaOperatingTMSR-LF1 experimental molten-salt reactor2 MWth (thermal only; nameplate; basis unspecified)Hongshagang industrial cluster, Minqin countyGansu · site-area point (approximate)18 Oct 2026Latest source 13 Jan 2026Latest event 1 Nov 2025
Valar Atomics Ward 250MicroreactorUnited StatesOperatingWard 250MWe not recorded · module · 250 kWth (nameplate; basis unspecified)Utah San Rafael Energy LabUtah · site-area point (approximate)18 Oct 2026Latest source 19 Jun 2026Latest event 2 Jul 2026
Aalo-X at Idaho National LaboratoryMicroreactorUnited StatesCommissioningAalo-X10 watts thermal (thermal only; zero-power limit)Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate)18 Oct 2026Latest source 30 Jul 2026Latest event 4 Jul 2026
Antares Mark-0 at Idaho National LaboratoryMicroreactorUnited StatesCommissioningAntares Mark-0100 watts thermal (thermal only; zero-power limit)Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate)18 Oct 2026Latest source 23 Oct 2026Latest event 4 Jun 2026
Deployable Energy Unity at Idaho National LaboratoryMicroreactorUnited StatesCommissioningUnity0 MWth (thermal only; zero-power limit)Idaho National Laboratory, Materials and Fuels Complex (reactor pilot demonstrations)Idaho · site-area point (approximate)18 Oct 2026Latest source 1 Jul 2026Latest event 30 Jun 2026
Linglong One (ACP100) ChangjiangSMRChinaCommissioningACP100 (Linglong One)125 MWe (gross) · module · 385 MWth (nameplate; basis unspecified)Changjiang Nuclear Power Plant siteHainan · site-area point (approximate)18 Oct 2026Latest source 1 Oct 2026Latest event 1 Oct 2026
Radiant Kaleidos demonstration at INL DOMEMicroreactorUnited StatesCommissioningKaleidosMWe not recorded · module · 3.5 MWth (nameplate; basis unspecified)DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate)18 Oct 2026Latest source 29 Oct 2026Latest event 29 Oct 2026
Baim / Cape Nagloynyn floating PEB-106 (RITM-200S)SMRRussiaConstructionRITM-200S—Cape Nagloynyn (Baim / PEB-106 floating mooring)Chukotka · site-area point (approximate)18 Oct 2026Latest source 13 Aug 2026Latest event 24 Sep 2026
BREST-OD-300 SeverskSMRRussiaConstructionBREST-OD-300300 MWe (gross) · module · 700 MWth (nameplate; basis unspecified)Seversk BREST-OD-300 siteTomsk Oblast · site-area point (approximate)18 Oct 2026Latest source 19 Jun 2026Latest event 7 Oct 2026
Darlington BWRX-300 Unit 1SMRCanadaConstructionBWRX-300300 MWe (net) · module · 870 MWth (nameplate; basis unspecified)Darlington New Nuclear Project siteOntario · site-area point (approximate)18 Oct 2026Latest source 11 Nov 2026Latest event 10 Nov 2026
Kairos Hermes 1SMRUnited StatesConstructionHermes / KP-FHR35 MWth (thermal only; nameplate; basis unspecified)Kairos Hermes site (East Tennessee Technology Park / Oak Ridge area)Tennessee · site-area point (approximate)18 Oct 2026Latest source 15 Sep 2026Latest event 1 May 2025
Kairos Hermes 2SMRUnited StatesConstructionHermes / KP-FHR—Kairos Hermes site (East Tennessee Technology Park / Oak Ridge area)Tennessee · site-area point (approximate)18 Oct 2026Latest source, document dated 1 Oct 2026Latest event 17 Apr 2026
Last Energy PWR-5 pilot at Texas A&M-RELLISMicroreactorUnited StatesConstructionLast Energy PWR-55 MWe (gross/net unspecified) · moduleTexas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)18 Oct 2026Latest source 16 Dec 2025Latest event 7 Oct 2026
MARVEL microreactor test bed at INL's TREAT facilityMicroreactorUnited StatesConstructionMARVEL10 kWe (gross/net unspecified) · plant · 85 kWth (nameplate; basis unspecified)TREAT facility, Idaho National LaboratoryIdaho · site-area point (approximate)18 Oct 2026Latest source 6 Oct 2026Latest event 6 Oct 2026
Natrium Kemmerer Unit 1SMRUnited StatesConstructionNatrium345 MWe (gross/net unspecified) · module · 840 MWth (nameplate; basis unspecified)Kemmerer Natrium siteWyoming · town-level point (approximate)18 Oct 2026Latest source 23 Sep 2026Latest event Sep 2026
Natura MSR-1 demonstration at Abilene Christian UniversitySMRUnited StatesConstructionNatura MSR-1thermal onlyScience and Engineering Research Center, Abilene Christian UniversityTexas · site-area point (approximate)18 Oct 2026Latest source 22 Sep 2026Latest event 18 Sep 2026
Oklo Aurora-INLMicroreactorUnited StatesConstructionAurora—Idaho National Laboratory — Aurora site south of the Materials and Fuels ComplexIdaho · site-area point (approximate)18 Oct 2026Latest source, document dated 6 Nov 2026Latest event 20 Jul 2026
Project Pele (INL microreactor demonstration)MicroreactorUnited StatesConstructionProject Pele microreactor (BWXT HTGR)1.5 MWe (gross/net unspecified) · moduleINL CITRC Project Pele areaIdaho · town-level point (approximate)18 Oct 2026Latest source 7 Dec 2022Latest event Sep 2026
RITM-200N JizzakhSMRUzbekistanConstructionRITM-200N55 MWe (gross/net unspecified) · moduleJizzakh RITM-200N siteJizzakh Region · site-area point (approximate)18 Oct 2026Latest source 5 Jun 2026Latest event 4 Jun 2026
Xuwei nuclear heating and power plant Unit 3 (HTGR)SMRChinaConstructionDesign profile not linked660 MWe (gross/net unspecified) · plantJiangsu Xuwei nuclear heating and power plantJiangsu · site-area point (approximate)18 Oct 2026Latest source 10 Nov 2026Latest event 6 Nov 2026
Blue Energy BWRX-300 at Port of VictoriaSMRUnited StatesLicensingBWRX-3001500 MWe (gross/net unspecified) · plantPort of VictoriaTexas · named site, no map pin18 Oct 2026Latest source 8 Oct 2026Latest event 16 Sep 2026
Blykalla SEALER Norrsundet / Gävle proposalSMRSwedenLicensingSEALER330 MWe (gross/net unspecified) · plantNorrsundet, Gävletown-level point (approximate)18 Oct 2026Latest source 15 Oct 2026Latest event 9 Oct 2026
Blykalla SEALER Untra / Tierp proposalSMRSwedenLicensingSEALER440 MWe (gross/net unspecified) · plantUntra, Tierp municipalityUppsala County · town-level point (approximate)18 Oct 2026Latest source 31 Aug 2026Latest event 31 Aug 2026
Daqing NHR-200 nuclear heating plant (1990s)SMRFrom an earlier planChinaLicensingDesign profile not linked200 MWth (thermal only; nameplate; basis unspecified)Daqing nuclear heating plant siteHeilongjiang · town named, no map pin18 Oct 2026Latest source: none datedLatest event 1993
Dual Fluid critical demonstration experiment in RwandaSMRRwandaLicensingDF-CDE critical demonstration experiment—Nyamata nuclear research campus (planned)Eastern Province · town named, no map pin18 Oct 2026Latest source, document dated May 2026Latest event Feb 2025
Duke Belews Creek technology-neutral SMR proposalSMRUnited StatesLicensingDesign profile not linked—Site near Belews Creek Steam Station, Stokes CountyNorth Carolina · site-area point (approximate)18 Oct 2026Latest source, document dated 1 Oct 2026Latest event 1 Oct 2026
Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades)SMRUnited StatesLicensingHoltec SMR-300680 MWe (gross/net unspecified) · plantHoltec states the two Pioneer units are designed to provide 680 MWe together, and the NRC's January 2026 release describes each SMR-300 unit as approximately 340 MWe.Palisades Nuclear Plant areaMichigan · site-area point (approximate)18 Oct 2026Latest source 10 Nov 2026Latest event 30 Sep 2026
Jimmy Cristanol Bazancourt heat microreactor proposalMicroreactorFranceLicensingJimmy Fermi heat microreactor20 MWth (thermal only; nameplate; basis unspecified)Cristanol industrial site, Bazancourtsite-area point (approximate)18 Oct 2026Latest source 11 Oct 2024Latest event 23 Jul 2026
Kärnfull Next SMR park at Målma, ValdemarsvikSMRSwedenLicensingBWRX-300—Målma, ValdemarsvikÖstergötland · town named, no map pin18 Oct 2026Latest source 3 Jun 2026Latest event 3 Sep 2026
Last Energy first commercial PWR-20 site, Caldwell CountyMicroreactorUnited StatesLicensingPWR-2020 MWe (net) · module · 80 MWth (nameplate; basis unspecified)Maxwell, Caldwell CountyTexas · region only, no map pin28 Oct 2026Latest source 5 Nov 2026Latest event Jul 2026
Long Mott Generating Station (Xe-100 at Dow Seadrift)SMRUnited StatesLicensingXe-100320 MWe (net) · plant · 800 MWth (nameplate; basis unspecified)The NRC's Long Mott page (updated 12 November 2026) lists a four-module plant at 800 MWth/320 MWe, intended to supply electricity and steam to the adjacent Seadrift Operations facility (a Dow site), and says each module could produce 80 MWe of electricity or about 200 MWth of steam.Dow UCC Seadrift / Long MottTexas · site-area point (approximate)18 Oct 2026Latest source 12 Nov 2026Latest event 9 Nov 2026
NB Power ARC-100 at Point LepreauSMRCanadaLicensingARC-100100 MWe (gross/net unspecified) · modulePoint Lepreau Nuclear Generating Station siteNew Brunswick · site-area point (approximate)18 Oct 2026Latest source 7 May 2024Latest event 22 Dec 2022
NuScale VOYGR Doicești (Romania)SMRRomaniaLicensingNuScale VOYGR (US460 / NPM)462 MWe (gross) · plantDoicești NuScale siteDâmbovița · site-area point (approximate)18 Oct 2026Latest source, document dated 29 Oct 2026Latest event 29 Oct 2026
Stellaria Alvin experimental reactor (INB Alpha) at CadaracheSMRFranceLicensingAlvin experimental molten-salt reactorMWe not recorded · plant · 200 kWth (nameplate; basis unspecified)CEA CadaracheProvence-Alpes-Côte d'Azur · site-area point (approximate)18 Oct 2026Latest source 23 Apr 2026Latest event 16 Jun 2026
Studsvik new nuclear at the Nyköping home siteSMRSwedenLicensingBWRX-300—Studsvik site, NyköpingSödermanland · town-level point (approximate)18 Oct 2026Latest source 14 Oct 2026Latest event 3 Sep 2026
TVA Clinch River BWRX-300SMRUnited StatesLicensingBWRX-300300 MWe (net) · moduleThe IAEA's 2026 reactor tables, which report Member State data to 31 December 2025, list Clinch River SMR-1 at 300 MW gross and 300 MW net with no thermal figure.Clinch River Nuclear SiteTennessee · site-area point (approximate)18 Oct 2026Latest source, document dated 28 Sep 2026Latest event 29 Sep 2026
UCRI critical unit for the Brazilian microreactor program at IENMicroreactorBrazilLicensingDesign profile not linked—IEN Argonauta building, UFRJ campus, Rio de JaneiroRio de Janeiro · site-area point (approximate)18 Oct 2026Latest source 21 Jan 2026Latest event 21 Jan 2026
University of Illinois KRONOS MMRMicroreactorUnited StatesLicensingKRONOS MMRMWe not recorded · module · 45 MWth (nameplate; basis unspecified)University of Illinois Urbana-Champaign campusIllinois · exact point18 Oct 2026Latest source 27 Oct 2026Latest event 27 Oct 2026
Yakutia land-based RITM-200N (Ust-Kuyga)SMRRussiaLicensingRITM-200N55 MWe (gross/net unspecified) · moduleUst-Kuyga (Yakutia land-based RITM-200N)Sakha (Yakutia) · site-area point (approximate)18 Oct 2026Latest source 3 Mar 2026Latest event 27 Feb 2026
Aalo commercial proposal at Texas A&M-RELLISSMRUnited StatesSitingAalo pod (commercial proposal)—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event 4 Feb 2025
AEP Joshua Falls SMR proposalSMRUnited StatesSitingDesign profile not linked—Joshua Falls, Campbell CountyVirginia · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event 17 Jan 2025
Antares microreactor at Joint Base San Antonio (ANPI)MicroreactorUnited StatesSitingR1—Joint Base San AntonioTexas · named site, no map pin10 Oct 2026Latest source 23 Apr 2026Latest event: none dated
Antares R1 microreactor siting at INL's Central Facilities AreaMicroreactorUnited StatesSitingR1—INL Central Facilities Area (candidate locations for an Antares R1 microreactor)Idaho · site-area point (approximate)3 Oct 2026Latest source, document dated 21 Aug 2025Latest event: none dated
BARC Visakhapatnam HTGCR hydrogen demonstration proposalSMRIndiaSitingBARC high-temperature gas-cooled hydrogen reactor5 MWth (thermal only; nameplate; basis unspecified)BARC Vizag campusAndhra Pradesh · site-area point (approximate)6 Oct 2026Latest source, document dated 5 Aug 2026Latest event Mar 2026
BlueCore BC-15 floating plant proposal at the Port of Long BeachSMRUnited StatesSitingBlueCore BC-1515 MWe (gross) · module · 45 MWth (nameplate; basis unspecified)Port of Long BeachCalifornia · named site, no map pin9 Oct 2026Latest source 13 Oct 2026Latest event: none dated
Calogena nuclear heating plant at CEA CadaracheMicroreactorFranceSitingDesign profile not linkedthermal onlyCEA CadaracheProvence-Alpes-Côte d'Azur · site-area point (approximate)5 Oct 2026Latest source: none datedLatest event: none dated
Cascade Advanced Energy FacilitySMRUnited StatesSitingXe-100320 MWe (net) · plantHanford Reservation Cascade / Columbia GS areaWashington · site-area point (approximate)18 Oct 2026Latest source 5 Nov 2026Latest event 5 Nov 2026
CNEC / Zheneng Sanmen HTGR power stationSMRChinaSitingHTR-PM600—Sanmen HTGR siteZhejiang · town named, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Copenhagen Atomics critical experiment at the Paul Scherrer InstituteSMRSwitzerlandSitingBALDER experimental configuration—Paul Scherrer Institute, VilligenAargau · site-area point (approximate)13 Oct 2026Latest source: none datedLatest event: none dated
Dalane / Lund SMR proposalSMRNorwaySitingDesign profile not linked—DalaneRogaland · region only, no map pin1 Oct 2026Latest source: none datedLatest event: none dated
Darlington BWRX-300 Units 2-4SMRCanadaSitingBWRX-300—Darlington New Nuclear Project siteOntario · site-area point (approximate)2 Oct 2026Latest source, document dated 12 Mar 2026Latest event: none dated
Deep Fission Gravity pilot, ParsonsSMRUnited StatesSitingGravity—Great Plains Industrial Park, ParsonsKansas · site-area point (approximate)13 Oct 2026Latest source, document dated 17 Jul 2026Latest event 6 Aug 2026
Deployable Energy Unity full-power test in INL's DOME (2027)MicroreactorUnited StatesSitingUnity1 MWe (gross/net unspecified) · moduleDOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate)13 Oct 2026Latest source 30 Sep 2026Latest event 30 Sep 2026
Elementl Letart Township BWRX-300 proposalSMRUnited StatesSitingBWRX-300—Letart Township, Meigs CountyOhio · town-level point (approximate)11 Oct 2026Latest source 26 Oct 2026Latest event 26 Oct 2026
Fensfjorden Kjernekraft SMR proposal near Mongstad (Austrheim and Alver)SMRNorwaySitingDesign profile not linked—Proposed Fensfjorden site, AustrheimVestland · site-area point (approximate)3 Oct 2026Latest source 10 Apr 2026Latest event: none dated
Fermi Energia Estonian BWRX-300 plantSMREstoniaSitingBWRX-300600 MWe (net) · plantUndisclosed6 Oct 2026Latest source 6 Nov 2026Latest event: none dated
Formosa commercial CAREM proposal (2010 agreement)SMRFrom an earlier planArgentinaSitingDesign profile not linked—Formosaregion only, no map pin13 Oct 2026Latest source: none datedLatest event: none dated
Grenland Kjernekraft SMR proposal at Herre, BambleSMRNorwaySitingDesign profile not linked—Herre, Bamble (Grenland)Telemark · site-area point (approximate)3 Oct 2026Latest source: none datedLatest event: none dated
Halden Kjernekraft SMR proposal at FemsjøenSMRNorwaySitingDesign profile not linked—Femsjøen area, HaldenØstfold · site-area point (approximate)2 Oct 2026Latest source 15 Aug 2024Latest event: none dated
Helen nuclear energy program plant in HelsinkiSMRFinlandSitingDesign profile not linked—Helsinki (Vuosaari, Salmisaari or Norrberget)Uusimaa · town named, no map pin2 Oct 2026Latest source 5 Nov 2026Latest event: none dated
Huakun One floating reactor platform demonstration at the Taipingling siteSMRChinaSitingHuakun One floating reactor platform50 MWe (gross/net unspecified) · plant · 200 MWth (nameplate; basis unspecified)Taipingling site operations base (harbour basin), HuidongGuangdong · site-area point (approximate)6 Oct 2026Latest source, document dated 2 Nov 2026Latest event 2 Nov 2026
Huizhou HuaPeng-1 heating demonstration proposalSMRChinaSitingHuaPeng-1thermal onlyHuizhou HuaPeng-1 demonstration location (undisclosed)Guangdong · town named, no map pin13 Oct 2026Latest source 8 Jan 2026Latest event: none dated
Idaho State University / NuCube Advanced Research and Test ReactorMicroreactorUnited StatesSitingDesign profile not linkedthermal onlyISU Business and Research Park, PocatelloIdaho · town-level point (approximate)13 Oct 2026Latest source 16 Sep 2026Latest event 16 Sep 2026
Kairos commercial proposal at Texas A&M-RELLISSMRUnited StatesSitingKP-FHR commercial plant—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event: none dated
KHNP SMR at the Gijang-gun candidate site (11th Basic Plan)SMRSouth KoreaSitingDesign profile not linked—Gijang-gun SMR candidate siteBusan · town named, no map pin6 Oct 2026Latest source: none datedLatest event: none dated
Kuopion Energia small nuclear district-heating plantSMRFinlandSitingDesign profile not linkedthermal onlyKuopio (Hepomäki or Sorsasalo)North Savo · town named, no map pin2 Oct 2026Latest source, document dated 11 Jun 2026Latest event: none dated
Last Energy Haskell County PWR-20 campusMicroreactorUnited StatesSitingPWR-2020 MWe (gross) · moduleHaskell CountyTexas · region only, no map pin9 Oct 2026Latest source Jul 2026Latest event 28 Feb 2025
Last Energy Llynfi PWR-20 proposalMicroreactorUnited KingdomSitingPWR-2020 MWe (gross/net unspecified) · moduleFormer Llynfi Power Station site, South WalesWales · site-area point (approximate)18 Oct 2026Latest source 17 Feb 2025Latest event 17 Feb 2025
Lister Kjernekraft SMR proposal (Lyngdal and Farsund)SMRNorwaySitingDesign profile not linked—Lister region (Lyngdal and Farsund)Agder · region only, no map pin2 Oct 2026Latest source 17 Dec 2025Latest event: none dated
Narvik Kjernekraft SMR plant proposal at Fornes, BallangenSMRNorwaySitingDesign profile not linked—Fornes, Ballangen (Narvik)Nordland · site-area point (approximate)2 Oct 2026Latest source 25 Aug 2025Latest event: none dated
Natura MSR-100 proposal at Texas A&M-RELLISSMRUnited StatesSitingNatura MSR-100—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event: none dated
newcleo / JAVYS LFR-AS-200 study at Bohunice V1SMRSlovakiaSitingLFR-AS-200—Bohunice V1 siteTrnava · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
newcleo LFR-AS-30 at Beaumont-en-Véron / Savigny-en-VéronSMRFranceSitingLFR-AS-3030 MWe (gross/net unspecified) · plantBeaumont-en-Véron / Savigny-en-VéronIndre-et-Loire · town named, no map pin6 Oct 2026Latest source: none datedLatest event 30 Sep 2026
Norsk Kjernekraft SMR proposal in VardøSMRNorwaySitingDesign profile not linked—Svartnes, VardøFinnmark · town-level point (approximate)2 Oct 2026Latest source, document dated 11 Dec 2024Latest event 22 Nov 2024
Oklo Aurora at Eielson AFB (DAF microreactor pilot)MicroreactorUnited StatesSitingAurora—Eielson Air Force BaseAlaska · site-area point (approximate)7 Oct 2026Latest source: none datedLatest event: none dated
Oklo Aurora campus, Pike County, OhioMicroreactorUnited StatesSitingAurora—Pike County / former Portsmouth site (Oklo)Ohio · site-area point (approximate)10 Oct 2026Latest source 12 Nov 2026Latest event 1 Feb 2024
OSGE Dąbrowa Górnicza BWRX-300 proposalSMRPolandSitingBWRX-300—Dąbrowa Górniczatown-level point (approximate)1 Oct 2026Latest source 5 Nov 2025Latest event 7 Dec 2023
OSGE Kraków / Nowa Huta BWRX-300 proposalSMRPolandSitingBWRX-300—Nowa Huta, Krakówtown-level point (approximate)1 Oct 2026Latest source 5 Nov 2025Latest event 7 Dec 2023
OSGE Ostrołęka BWRX-300 proposalSMRPolandSitingBWRX-300—Ostrołękatown-level point (approximate)2 Oct 2026Latest source 5 Nov 2025Latest event 7 Dec 2023
OSGE Stalowa Wola BWRX-300SMRPolandSitingBWRX-300300 MWe (net) · moduleStalowa Wola SMR areaSubcarpathian · town-level point (approximate)2 Oct 2026Latest source 5 Nov 2025Latest event: none dated
OSGE Stawy Monowskie BWRX-300SMRPolandSitingBWRX-300300 MWe (net) · moduleStawy Monowskie near Oswiecim SMR areaLesser Poland · town-level point (approximate)1 Oct 2026Latest source 22 Oct 2026Latest event: none dated
OSGE Wloclawek BWRX-300SMRPolandSitingBWRX-300300 MWe (net) · moduleWloclawek BWRX-300 project areaKuyavian-Pomeranian · town-level point (approximate)2 Oct 2026Latest source 22 Oct 2026Latest event: none dated
Øygarden / Alver SMR proposalSMRNorwaySitingDesign profile not linked—Øygarden and Alvertown named, no map pin1 Oct 2026Latest source 8 Aug 2024Latest event: none dated
Radiant Kaleidos Buckley Space Force Base proposalMicroreactorUnited StatesSitingKaleidos—Buckley Space Force Base, AuroraColorado · site-area point (approximate)10 Oct 2026Latest source 23 Jul 2026Latest event 23 Jul 2026
Rolls-Royce SMR Dětmarovice candidate locationSMRCzechiaSitingRolls-Royce SMR—Dětmarovice candidate locationsite-area point (approximate)28 Oct 2026Latest source 27 Feb 2023Latest event 21 Jul 2026
Rolls-Royce SMR Tušimice candidate locationSMRCzechiaSitingRolls-Royce SMR—Tušimice candidate locationsite-area point (approximate)28 Oct 2026Latest source 22 Dec 2025Latest event 21 Jul 2026
Rolls-Royce SMR WylfaSMRUnited KingdomSitingRolls-Royce SMR1410 MWe (net) · plantWylfa Newydd siteWales · site-area point (approximate)6 Oct 2026Latest source 24 Sep 2026Latest event 13 Apr 2026
SaskPower Rafferty SMR (Estevan area)SMRCanadaSitingBWRX-300600 MWe (net) · plantRafferty site near EstevanSaskatchewan · town-level point (approximate)1 Oct 2026Latest source: none datedLatest event: none dated
SEALER power plant proposal in Longyearbyen, SvalbardSMRNorwaySitingSEALER—LongyearbyenSvalbard · town named, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Shandong Haiyang integrated small reactor demonstration project (heat only)SMRChinaSitingDesign profile not linked200 MWth (thermal only; nameplate; basis unspecified)Haiyang nuclear power plant, south-west cornerShandong · site-area point (approximate)6 Oct 2026Latest source: none datedLatest event 10 Sep 2024
Shelf-M small nuclear plant at the Sovinoe deposit, ChukotkaSMRRussiaSitingSHELF-M10 MWe (gross/net unspecified) · plant · 35 MWth (nameplate; basis unspecified)Sovinoe gold depositChukotka · named site, no map pin6 Oct 2026Latest source: none datedLatest event: none dated
SINAP small modular thorium molten-salt research reactor (10 MWe), MinqinSMRChinaSitingSINAP small modular thorium molten-salt research reactor (10 MWe)10 MWe (gross/net unspecified) · plant · 30 MWth (nameplate; basis unspecified)SINAP Wuwei campus, Hongshagang zone, Minqin countyGansu · site-area point (approximate)6 Oct 2026Latest source 12 Mar 2026Latest event Jan 2026
SPIC Jiamusi nuclear heating demonstration (Hongxing site)SMRChinaSitingDesign profile not linked200 MWth (thermal only; nameplate; basis unspecified)Hongxing site, Simajia town, Huachuan county (Jiamusi)Heilongjiang · site-area point (approximate)3 Oct 2026Latest source 9 Dec 2019Latest event: none dated
Taftøy Aure / Heim SMR proposalSMRNorwaySitingDesign profile not linked—Taftøy Næringspark, Aure and Heimnamed site, no map pin2 Oct 2026Latest source 10 Apr 2026Latest event 11 Feb 2026
Tarapur BSMR-200 lead proposalSMRIndiaSitingBharat Small Modular Reactor (BSMR-200)220 MWe (gross/net unspecified) · moduleTarapurMaharashtra · site-area point (approximate)6 Oct 2026Latest source, document dated 5 Aug 2026Latest event Aug 2026
Tarapur SMR-55 lead proposalSMRIndiaSitingBARC SMR-5555 MWe (gross/net unspecified) · moduleTarapurMaharashtra · site-area point (approximate)6 Oct 2026Latest source 16 Oct 2026Latest event 4 Feb 2026
Temelin Rolls-Royce SMRSMRCzechiaSitingRolls-Royce SMR470 MWe (net) · moduleTemelin SMR early-works areaSouth Bohemian Region · site-area point (approximate)2 Oct 2026Latest source 9 Oct 2026Latest event Oct 2026
Terra Innovatum SOLO first deployment at Rock City Admiral Parkway, ValmeyerMicroreactorUnited StatesSitingSOLO—Rock City Admiral Parkway, ValmeyerIllinois · named site, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Terrestrial Energy IMSR at Texas A&M-RELLISSMRUnited StatesSitingIMSR (Integral Molten Salt Reactor)—Texas A&M-RELLIS Energy Proving GroundTexas · site-area point (approximate)9 Oct 2026Latest source: none datedLatest event 18 Jun 2026
Thorcon 500, Kelasa IslandSMRIndonesiaSitingThorcon 500 (TMSR500)500 MWe (gross/net unspecified) · plantKelasa Island (Pulau Gelasa)Bangka Belitung Islands · site-area point (approximate)6 Oct 2026Latest source: none datedLatest event 30 Jul 2025
U-Battery first-of-a-kind siting bid at Chalk River (2019-2023)MicroreactorCanadaSitingU-Battery—Chalk River Laboratories campus (U-Battery siting bid)Ontario · site-area point (approximate)3 Oct 2026Latest source: none datedLatest event: none dated
Valar Carbon County nuclear campus proposal (Project Beehive)SMRUnited StatesSitingDesign profile not linked—Valar Carbon County campus siteUtah · named site, no map pin13 Oct 2026Latest source, document dated 17 Sep 2026Latest event: none dated
Videberg Kraft Rolls-Royce SMR plant on the Värö peninsula (Ringhals)SMRSwedenSitingRolls-Royce SMR1410 MWe (gross/net unspecified) · plantVärö peninsula next to RinghalsHalland · site-area point (approximate)10 Oct 2026Latest source: none datedLatest event 25 Jun 2026
Westinghouse eVinci at Malmstrom Air Force Base (ANPI)MicroreactorUnited StatesSitingeVinci—Malmstrom Air Force BaseMontana · site-area point (approximate)10 Oct 2026Latest source 23 Apr 2026Latest event: none dated
Aalo fleet proposal at Idaho Falls Power's Energy Research ParkMicroreactorUnited StatesAnnouncedAalo-1—Idaho Falls Power Energy Research ParkIdaho · town-level point (approximate)9 Oct 2026Latest source 15 Sep 2026Latest event: none dated
Aalo Project Ascension power-reactor proposal at INLSMRUnited StatesAnnouncedDesign profile not linked10 MWe (gross/net unspecified) · moduleProject Ascension proposed area on the Aalo-X campus at INLIdaho · site-area point (approximate)15 Oct 2026Latest source 30 Jul 2026Latest event 4 Jul 2026
ACR-300 SMR proposal at Atucha (Meitner Energy)SMRArgentinaAnnouncedACR-300300 MWe (gross/net unspecified) · plantAtucha nuclear power plant sitesite-area point (approximate)6 Oct 2026Latest source: none datedLatest event 23 Sep 2026
AEP Rockport BWRX-300 proposalSMRUnited StatesAnnouncedBWRX-300—Rockport Plant, Spencer County (I&M SMR site)Indiana · site-area point (approximate)10 Oct 2026Latest source 23 Jul 2026Latest event 17 Jan 2025
ALFRED lead-cooled demonstrator at Mioveni (EAGLES-300 program)SMRRomaniaAnnouncedALFRED lead-cooled fast-reactor demonstratorMWe not recorded · plant · 300 MWth (nameplate; basis unspecified)RATEN ICN Mioveni nuclear platformArgeș · town-level point (approximate)13 Oct 2026Latest source 20 Aug 2021Latest event: none dated
Amazon, AEP and X-energy Xe-100 plant at the former Breed station (Indiana)SMRUnited StatesAnnouncedXe-100960 MWe (gross/net unspecified) · plantFormer Breed Generating Station site, Sullivan CountyIndiana · named site, no map pin30 Oct 2026Latest source 19 Oct 2026Latest event: none dated
Ameren / Westinghouse SMR proposal at Callaway (2012)SMRUnited StatesAnnouncedDesign profile not linked—Callaway site (Ameren Missouri)Missouri · site-area point (approximate)2 Oct 2026Latest source 21 Feb 2014Latest event: none dated
Ameresco–Terrestrial Energy IMSR at Aberdeen Proving GroundSMRUnited StatesAnnouncedIMSR (Integral Molten Salt Reactor)—Aberdeen Proving Ground (Phase 2 site)Maryland · site-area point (approximate)18 Oct 2026Latest source 9 Oct 2026Latest event 21 Sep 2026
Antares Mark-1 electricity-producing microreactor at INLMicroreactorUnited StatesAnnouncedDesign profile not linked—MFC-793 test facility, INL Materials and Fuels ComplexIdaho · site-area point (approximate)24 Oct 2026Latest source 27 Oct 2026Latest event 23 Oct 2026
Antares R1 microreactors at Fort Bragg (Army Janus)MicroreactorUnited StatesAnnouncedR1—Fort BraggNorth Carolina · site-area point (approximate)10 Oct 2026Latest source: none datedLatest event: none dated
ARC-100 first-of-a-kind deployment framework at Idaho National LaboratorySMRUnited StatesAnnouncedARC-100100 MWe (gross/net unspecified) · moduleIdaho National Laboratory (ARC-100 first-of-a-kind; location within INL not stated)Idaho · town-level point (approximate)3 Oct 2026Latest source 29 Oct 2026Latest event 29 Oct 2026
ARC-100 proposal at the Port of Belledune Green Energy HubSMRCanadaAnnouncedARC-100—Port of Belledune Green Energy HubNew Brunswick · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
BaRupOn's anticipated KRONOS MMR deployment at its Liberty, Texas campus (feasibility stage)MicroreactorUnited StatesAnnouncedKRONOS MMR—BaRupOn LAMP hub, LibertyTexas · town-level point (approximate)3 Oct 2026Latest source: none datedLatest event: none dated
Beck Creek Energy SMR proposal (Amherst County)SMRUnited StatesAnnouncedDesign profile not linked—Beck Creek Energy site, eastern Amherst CountyVirginia · named site, no map pin30 Oct 2026Latest source 8 Oct 2026Latest event: none dated
Belledune Prodigy transportable nuclear proposalMicroreactorCanadaAnnouncedBWXT BANR—BelleduneNew Brunswick · town named, no map pin13 Oct 2026Latest source 5 Oct 2026Latest event 5 Oct 2026
BWXT BANR at Fort Campbell (Army Janus)MicroreactorUnited StatesAnnouncedBWXT BANR20 MWe (gross/net unspecified) · plantFort CampbellKentucky · site-area point (approximate)10 Oct 2026Latest source: none datedLatest event: none dated
Calogena NetZeroHeat CAL30 heat reactor for PierrelatteMicroreactorFranceAnnouncedCAL-30thermal onlyPierrelatte (Calogena proposed heat reactor)Auvergne-Rhône-Alpes · town named, no map pin11 Nov 2026Latest source, document dated 2 Nov 2026Latest event: none dated
Cambridge Atomworks ODIN prototype at Berkeley GreenMicroreactorUnited KingdomAnnouncedODIN—Berkeley Green Science and Technology ParkEngland · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Centrica / X-energy Xe-100 plant at HartlepoolSMRUnited KingdomAnnouncedXe-100—Hartlepool site (EDF and Centrica)England · site-area point (approximate)2 Oct 2026Latest source 15 Sep 2026Latest event: none dated
CGN Bohai ACPR50S floating SMR demonstration proposalSMRFrom an earlier planChinaAnnouncedACPR50S—Bohai Searegion only, no map pin2 Oct 2026Latest source 18 Jan 2016Latest event: none dated
CNNC floating SMR demonstration proposal (2016)SMRFrom an earlier planChinaAnnouncedACP100S—Undisclosed14 Oct 2026Latest source 15 Jan 2016Latest event: none dated
Community Nuclear Power North Teesside AP300 proposalSMRUnited KingdomAnnouncedAP300≈ 1,200 MWe (derived)North TeessideEngland · region only, no map pin1 Oct 2026Latest source: none datedLatest event 8 Feb 2024
Deep Atomic MK60 AI data-center campus proposal at INLSMRUnited StatesAnnouncedMK60—Idaho National Laboratory (proposed AI data-center campus)Idaho · town-level point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Deployable Energy–Hornbeck Unity maritime demonstration proposalMicroreactorUnited StatesAnnouncedUnity—Undisclosed13 Oct 2026Latest source 28 Aug 2026Latest event: none dated
Dominion North Anna SMR proposalSMRUnited StatesAnnouncedDesign profile not linked—North Anna Power Station, Louisa CountyVirginia · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Energoatom / Holtec Rivne SMR-160 proposal (MoU-era)SMRFrom an earlier planUkraineAnnouncedHoltec SMR-160—Rivne NPP — historical SMR-160 replacement proposalsite-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Energoatom SMR at the Trypilska thermal plant siteSMRUkraineAnnouncedDesign profile not linked—Trypilska thermal power plantKyiv Oblast · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
First American Nuclear EAGL-1 energy park in Indiana (site not disclosed)SMRUnited StatesAnnouncedEAGL-1—Indianaregion only, no map pin11 Oct 2026Latest source 15 Apr 2026Latest event 4 Nov 2025
First ELENA-AM thermoelectric heating pilot proposalSMRRussiaAnnouncedELENA-AM—Undisclosed13 Oct 2026Latest source Sep 2023Latest event: none dated
Floating nuclear power unit for Gazprom's Kirinskoye fields, SakhalinSMRRussiaAnnouncedRITM-200S116 MWe (gross/net unspecified) · plantKirinskoye and Yuzhno-Kirinskoye gas-condensate fieldsSakhalin Oblast · named site, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
General Atomics GA-TES at Fort Hood (Army Janus)MicroreactorUnited StatesAnnouncedGA-TES5 MWe (gross/net unspecified) · plantFort HoodTexas · site-area point (approximate)10 Oct 2026Latest source 15 Oct 2026Latest event: none dated
GS Energy NuScale SMR proposal at Uljin nuclear hydrogen complexSMRSouth KoreaAnnouncedDesign profile not linked—Not recordedUljin Nuclear Hydrogen National Industrial ComplexNorth Gyeongsang · named site, no map pin8 Oct 2026Latest source 6 May 2023Latest event: none dated
HAPPY200 nuclear heating project at Baishan, JilinSMRChinaAnnouncedHAPPY200thermal onlyBaishan nuclear heating project siteJilin · town named, no map pin2 Oct 2026Latest source 9 Dec 2019Latest event: none dated
Hexana first SMR in the Gard rhodanien areaSMRFranceAnnouncedHEXANA—Gard rhodanienOccitanie · region only, no map pin5 Oct 2026Latest source: none datedLatest event: none dated
Holtec / EDF SMR-300 proposal at CottamSMRUnited KingdomAnnouncedHoltec SMR-300—Former Cottam power stationEngland · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Holtec Green River / Blue Castle, Utah proposalSMRUnited StatesAnnouncedHoltec SMR-300—Green River, Blue Castle projectUtah · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event 28 May 2026
Holtec Oyster Creek SMR proposalSMRUnited StatesAnnouncedHoltec SMR-3001360 MWe (gross/net unspecified) · plantOyster Creek Generating Station site, Lacey TownshipNew Jersey · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event 30 Jul 2026
Holtec SMR-160 proposal at Savannah River Site (2012)SMRFrom an earlier planUnited StatesAnnouncedHoltec SMR-160160 MWe (gross/net unspecified) · moduleSavannah River SiteSouth Carolina · site-area point (approximate)2 Oct 2026Latest source 5 Mar 2012Latest event: none dated
Holtec SMR-300 proposal in Brigham City, UtahSMRUnited StatesAnnouncedHoltec SMR-300—Brigham CityUtah · town named, no map pin2 Oct 2026Latest source, document dated 19 Nov 2025Latest event: none dated
HTGR-POLA research reactor (NCBJ)SMRPolandAnnouncedHTGR-POLAMWe not recorded · plant · 30 MWth (nameplate; basis unspecified)NCBJ Świerk site, OtwockMasovian · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Huaneng Xiapu 600 MW HTGR unit (site plan)SMRChinaAnnouncedDesign profile not linked—Xiapu nuclear site (Changbiao Island)Fujian · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Hyperion / Gen4 Module proposal at Savannah River Site (2012)SMRFrom an earlier planUnited StatesAnnouncedG4M25 MWe (gross/net unspecified) · module · 70 MWth (nameplate; basis unspecified)Savannah River SiteSouth Carolina · site-area point (approximate)2 Oct 2026Latest source 24 Sep 2024Latest event: none dated
Kaliningrad floating small nuclear plants proposalSMRRussiaAnnouncedDesign profile not linked—Kaliningrad Oblastregion only, no map pin13 Oct 2026Latest source 1 Oct 2026Latest event: none dated
Keravan Energia / Steady Energy nuclear district-heating plantSMRFinlandAnnouncedLDR-50thermal onlyKeravaUusimaa · town named, no map pin5 Oct 2026Latest source 26 Jun 2026Latest event: none dated
Last Energy first KSSE plant proposalMicroreactorPolandAnnouncedDesign profile not linked20 MWe (gross/net unspecified) · plantKatowice Special Economic Zone (KSSE)region only, no map pin14 Oct 2026Latest source 23 Mar 2023Latest event: none dated
Last Energy London Gateway PWR-20 proposalMicroreactorUnited KingdomAnnouncedPWR-2020 MWe (gross/net unspecified) · moduleLondon Gateway portsite-area point (approximate)2 Oct 2026Latest source: none datedLatest event 15 Sep 2025
Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan)MicroreactorRomaniaAnnouncedPWR-20—RATEN ICN Mioveni nuclear platformArgeș · town-level point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022)MicroreactorPolandAnnouncedPWR-20200 MWe (gross/net unspecified) · plantLegnica Special Economic ZoneLower Silesia · region only, no map pin2 Oct 2026Latest source 23 Mar 2023Latest event: none dated
LEANDREA lead-cooled demonstrator at SCK CEN Mol (EAGLES-300 program)SMRBelgiumAnnouncedDesign profile not linked—SCK CEN MolAntwerp · site-area point (approximate)2 Oct 2026Latest source 9 Oct 2026Latest event: none dated
Liaoyuan DHR-400 heating demonstration proposalSMRFrom an earlier planChinaAnnouncedYanlong DHR-400thermal onlyLiaoyuan DHR-400 demonstration location (undisclosed)Jilin · town named, no map pin13 Oct 2026Latest source, document dated 4 Sep 2023Latest event: none dated
Maoming Green Energy HTGR proposal (Phase 1 planning)SMRChinaAnnouncedDesign profile not linked—Not recordedMaoming Green Energy / Zero-Carbon Industrial Park (HTGR component)Guangdong · named site, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Meta–TerraPower initial dual-unit Natrium proposalSMRUnited StatesAnnouncedNatrium690 MWe (gross/net unspecified) · plantUndisclosed13 Oct 2026Latest source 9 Jan 2026Latest event: none dated
Microreactor at Naval Weapons Station CraneMicroreactorUnited StatesAnnouncedKaleidos—Naval Weapons Station CraneIndiana · site-area point (approximate)25 Oct 2026Latest source 20 Oct 2026Latest event 20 Oct 2026
Midpoint SMR Project #1 (Sawtooth / SEDC, Jerome County)SMRUnited StatesAnnouncedDesign profile not linked—Midpoint SMR Project #1 (Jerome County BLM)Idaho · site-area point (approximate)2 Oct 2026Latest source 22 Aug 2025Latest event: none dated
Moltex SSR-W at Point LepreauSMRCanadaAnnouncedSSR-W—Point Lepreau Nuclear Generating Station siteNew Brunswick · site-area point (approximate)2 Oct 2026Latest source 18 Nov 2026Latest event: none dated
Myanmar 110 MW SMR project (two RITM-200N; site not named)SMRMyanmarAnnouncedRITM-200N110 MWe (gross/net unspecified) · plantUndisclosed6 Oct 2026Latest source 24 Aug 2026Latest event 24 Aug 2026
NANO Nuclear microreactors for Digihost's North Tonawanda power plant (2024 MOU)MicroreactorUnited StatesAnnouncedDesign profile not linked—Digihost 60 MW power plant, North Tonawanda, New YorkNew York · site-area point (approximate)13 Oct 2026Latest source: none datedLatest event: none dated
Necsa SMR demonstration reactor at PelindabaSMRSouth AfricaAnnouncedDesign profile not linked—Necsa Pelindaba complexNorth West · site-area point (approximate)6 Oct 2026Latest source 31 Mar 2026Latest event: none dated
Nine Mile Point Gen III+ SMR early site permit evaluationSMRUnited StatesAnnouncedDesign profile not linked—Nine Mile Point Clean Energy Center (advanced/SMR ESP evaluation)New York · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Ningdu multipurpose modular proposal (14th Five-Year plan)SMRFrom an earlier planChinaAnnouncedDesign profile not linked600 MWe (gross/net unspecified) · plantNot recordedNingdu multipurpose modular proposal (historical plan)Jiangxi · town named, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Norilsk land small nuclear plant (RITM-400)SMRRussiaAnnouncedRITM-400320 MWe (gross/net unspecified) · plantNorilsk (small nuclear plant location to be selected)Krasnoyarsk Krai · town named, no map pin6 Oct 2026Latest source: none datedLatest event: none dated
Northern Halmahera floating nuclear power units (Rosatom, two FPU-100)SMRIndonesiaAnnouncedDesign profile not linked200 MWe (gross/net unspecified) · plantnorthern Halmahera IslandNorth Maluku · region only, no map pin30 Oct 2026Latest source 20 Oct 2026Latest event: none dated
Nuclea Morpheus test reactor siting at the Utah San Rafael Energy LabMicroreactorUnited StatesAnnouncedMorpheus—Utah San Rafael Energy LabUtah · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed)SMRGhanaAnnouncedNuScale VOYGR (US460 / NPM)924 MWe (gross/net unspecified) · plantUndisclosed5 Oct 2026Latest source: none datedLatest event 27 Mar 2025
NuCube test microreactor at the Utah San Rafael Energy LabMicroreactorUnited StatesAnnouncedNuSun-1—Utah San Rafael Energy LabUtah · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
NuScale plant proposal at Savannah River Site (2012)SMRFrom an earlier planUnited StatesAnnouncedDesign profile not linked45 MWe (gross/net unspecified) · moduleSavannah River SiteSouth Carolina · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Oklo Aurora power for Diamondback Energy near Midland, Texas (2024 LOI)MicroreactorUnited StatesAnnouncedAurora50 MWe (gross/net unspecified) · plantProposed collective electricity supply under a non-binding letter of intent; this figure does not establish a selected plant or module nameplate.Permian Basin operations near MidlandTexas · region only, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
OSGE Warsaw potential BWRX-300 location (2023 list)SMRPolandAnnouncedBWRX-300—Warszawa (OSGE potential location)Masovian · town named, no map pin2 Oct 2026Latest source 11 Feb 2025Latest event: none dated
Otrera precursor (first demonstration) reactor at CEA MarcouleSMRFranceAnnouncedDesign profile not linked—CEA Marcoule centerOccitanie · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Penn State FRONTIER eVinci research proposalMicroreactorUnited StatesAnnouncedeVinci—University Park campus, Penn StatePennsylvania · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
Project TETRA / TETRA-1 pilot at Texas A&M RELLISSMRUnited StatesAnnouncedIMSR (Integral Molten Salt Reactor)—Texas A&M RELLIS campus — TETRA-1 planned sitesite-area point (approximate)2 Oct 2026Latest source 8 Jan 2026Latest event: none dated
Pupuk Kaltim nuclear-powered ammonia study at BontangSMRIndonesiaAnnouncedDesign profile not linked—Pupuk Kaltim, BontangEast Kalimantan · site-area point (approximate)2 Oct 2026Latest source 19 May 2023Latest event: none dated
Purdue / Duke Energy SMR feasibility study for the Purdue campusSMRUnited StatesAnnouncedDesign profile not linked—Purdue University campus, West LafayetteIndiana · site-area point (approximate)2 Oct 2026Latest source 10 May 2023Latest event: none dated
Pylon / LOKI MMR experiment proposal for INL's DOMEMicroreactorUnited StatesAnnouncedLOKI MMR—DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate)2 Oct 2026Latest source 7 Oct 2026Latest event: none dated
Radiant Kaleidos microreactors at Fort Benning (Army Janus)MicroreactorUnited StatesAnnouncedKaleidos3 MWe (gross/net unspecified) · plantFort BenningGeorgia · site-area point (approximate)10 Oct 2026Latest source: none datedLatest event: none dated
Ruijin HTR nuclear power proposal (Jiangxi)SMRChinaAnnouncedDesign profile not linked—Not recordedRuijinJiangxi · town named, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004)SMRRussiaAnnouncedRUTA-7070 MWth (thermal only; nameplate; basis unspecified)Not recordedInstitute of Physics and Power Engineering (IPPE), ObninskKaluga Oblast · site-area point (approximate)3 Oct 2026Latest source: none datedLatest event: none dated
Shearwater NuScale Wylfa feasibility proposal (2021)SMRFrom an earlier planUnited KingdomAnnouncedNuScale VOYGR (US460 / NPM)924 MWe (gross/net unspecified) · plantWylfa Magnox — Shearwater NuScale feasibility proposalWales · site-area point (approximate)2 Oct 2026Latest source 23 Sep 2021Latest event: none dated
Standard Power NuScale SMR facility in Ohio (site not disclosed)SMRUnited StatesAnnouncedDesign profile not linked—Ohioregion only, no map pin5 Oct 2026Latest source: none datedLatest event 6 Oct 2023
Standard Power NuScale SMR facility in Pennsylvania (site not disclosed)SMRUnited StatesAnnouncedDesign profile not linked—Pennsylvaniaregion only, no map pin5 Oct 2026Latest source: none datedLatest event 6 Oct 2023
StarCore demonstration reactor at the Whiteshell Laboratories site, PinawaSMRCanadaAnnouncedDesign profile not linked—Whiteshell Laboratories site, PinawaManitoba · site-area point (approximate)13 Oct 2026Latest source: none datedLatest event: none dated
Stellarium reactors for the Fos-sur-Mer integrated energy hub (2026 MoU)SMRFranceAnnouncedStellarium—Fos-sur-Mer industrial area (integrated energy hub)Provence-Alpes-Côte d'Azur · named site, no map pin3 Oct 2026Latest source: none datedLatest event: none dated
Stratek Global HTMR-100 at Zilkaats EstateSMRSouth AfricaAnnouncedHTMR-10035 MWe (gross/net unspecified) · module · 100 MWth (nameplate; basis unspecified)Zilkaats Estate, De Wildtnamed site, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Surry Green Energy Center SMR campus proposalSMRUnited StatesAnnouncedDesign profile not linked—Not recordedSurry Green Energy Center SMR campus proposalVirginia · site-area point (approximate)2 Oct 2026Latest source 13 Feb 2024Latest event: none dated
Tata / BWXT BANR Green River, Wyoming proposalMicroreactorUnited StatesAnnouncedBWXT BANR—Tata Chemicals Soda Ash Partners site, Green RiverWyoming · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
TEPLATOR heat-only reactor for Slavutych district heatingSMRUkraineAnnouncedTEPLATORthermal onlySlavutych district heatingKyiv Oblast · town named, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Thorizon One first commercial molten-salt reactor in ZeelandSMRNetherlandsAnnouncedThorizon One—BorsseleZeeland · region only, no map pin13 Oct 2026Latest source: none datedLatest event: none dated
Thorizon PIONEER molten-salt demonstrator at NRG PALLAS, PettenSMRNetherlandsAnnouncedThorizon PIONEER nuclear demonstrator—NRG PALLAS site, PettenNoord-Holland · town-level point (approximate)13 Oct 2026Latest source 12 Nov 2026Latest event: none dated
Transformational Challenge Reactor microreactor test proposal at ORNL (2019)MicroreactorUnited StatesAnnouncedDesign profile not linked—Building 7709, Copper Ridge, Oak Ridge National LaboratoryTennessee · site-area point (approximate)3 Oct 2026Latest source Aug 2022Latest event: none dated
USNC MMR Idaho National Laboratory demonstration proposal (2020 ARDP)MicroreactorUnited StatesAnnouncedDesign profile not linked—USNC MMR Idaho National Laboratory demonstration proposal (site agreement undisclosed)Idaho · town-level point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
West Kalimantan Rosatom floating RITM-200M proposal (2025)SMRIndonesiaAnnouncedDesign profile not linked—West Kalimantanregion only, no map pin6 Oct 2026Latest source 19 Oct 2026Latest event: none dated
West Kalimantan Rosatom land-based SMR proposal (2025)SMRIndonesiaAnnouncedDesign profile not linked—West Kalimantanregion only, no map pin6 Oct 2026Latest source 3 Jul 2026Latest event: none dated
Westinghouse eVinci at Fort Drum (Army Janus)MicroreactorUnited StatesAnnouncedeVinci—Fort DrumNew York · site-area point (approximate)10 Oct 2026Latest source 26 Aug 2026Latest event: none dated
Yantai nuclear seawater desalination project (NHR200-I, 2003)SMRFrom an earlier planChinaAnnouncedDesign profile not linkedthermal onlyNot recordedYantai (site not stated)Shandong · town named, no map pin6 Oct 2026Latest source Sep 2005Latest event Mar 2003
ZE PAK–SGE Pątnów BWRX-300 proposalSMRPolandAnnouncedBWRX-300—Pątnów SMR proposal (ZE PAK)site-area point (approximate)2 Oct 2026Latest source 14 Oct 2026Latest event: none dated
ZettaJoule ZJ0 research reactor at Texas A&M (TEES)SMRUnited StatesAnnouncedDesign profile not linked—TEES Nuclear Engineering & Science Center area, College StationTexas · town-level point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
BATAN/BRIN RDE experimental reactor at Serpong (PeLUIt-40 predecessor)SMRIndonesiaSuspendedDesign profile not linkedMWe not recorded · module · 10 MWth (nameplate; basis unspecified)Not recordedRDE site, Puspiptek complex, SerpongBanten · named site, no map pin19 Oct 2026Latest source: none datedLatest event: none dated
CAREM-25SMRArgentinaSuspendedCAREM-2525 MWe (net) · module · 100 MWth (nameplate; basis unspecified)IAEA-RDS-2/46 lists CAREM25 at 100 MWth, 29 MWe gross and 25 MWe net.CAREM site (Lima, Zárate)Buenos Aires · site-area point (approximate)9 Oct 2026Latest source 30 Oct 2023Latest event: none dated
Global First Power Chalk River MMR (paused)MicroreactorCanadaSuspendedGlobal First Power Micro Modular Reactor—Chalk River Laboratories site, Renfrew CountyOntario · site-area point (approximate)19 Oct 2026Latest source 14 Nov 2023Latest event: none dated
Next Generation Nuclear Plant prototype HTGR at INL (2005-2013)SMRFrom an earlier planUnited StatesSuspendedDesign profile not linked—Idaho National Laboratory (NGNP prototype; location within INL not fixed)Idaho · town-level point (approximate)19 Oct 2026Latest source Aug 2008Latest event: none dated
SGP Industria Rolls-Royce SMR plant (2024 decision in principle)SMRPolandSuspendedRolls-Royce SMR—Świętokrzyskieregion only, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
VBER-300 nuclear plant project near Aktau, Mangystau (2006)SMRFrom an earlier planKazakhstanSuspendedVBER-300—Not recordedAktau area, Mangystau regionMangystau · town named, no map pin19 Oct 2026Latest source: none datedLatest event: none dated
Cwmni Egino small modular reactor proposal at TrawsfynyddSMRUnited KingdomDeferredDesign profile not linked—Former Trawsfynydd nuclear power stationWales · site-area point (approximate)9 Oct 2026Latest source Jul 2024Latest event 3 Dec 2025
Daegu i-SMR proposal at the Gunwi industrial complexSMRSouth KoreaDeferredi-SMR680 MWe (gross/net unspecified) · plantWorld Nuclear News states a 680 MWe plant and calls it equivalent to four 170 MW modules.Gunwi advanced industrial complex (Daegu)Daegu · named site, no map pin19 Oct 2026Latest source: none datedLatest event 3 Feb 2026
B&W mPower plan at TVA's Clinch River site (2013-2017)SMRFrom an earlier planUnited StatesCanceledmPower—Clinch River Nuclear SiteTennessee · site-area point (approximate)19 Oct 2026Latest source: none datedLatest event: none dated
Blykalla SEALER study at Hörby (withdrawn)SMRSwedenCanceledSEALER—Stavröd, HörbySkåne · town named, no map pin2 Oct 2026Latest source: none datedLatest event: none dated
Dimitrovgrad SVBR-100 pilot proposal (2013 land lease)SMRFrom an earlier planRussiaCanceledSVBR-100100 MWe (gross/net unspecified) · plantDimitrovgradUlyanovsk · site-area point (approximate)2 Oct 2026Latest source 2024Latest event: none dated
eVinci DOME nuclear test reactorMicroreactorUnited StatesCanceledeVinci—DOME test bed, Idaho National LaboratoryIdaho · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
GE Hitachi PRISM plutonium-reuse proposal at Sellafield (not taken forward)SMRUnited KingdomCanceledPRISM311 MWe (gross/net unspecified) · moduleThe 1 December 2011 article attributes 311 MWe to each of two units.Sellafield (proposed PRISM location)England · site-area point (approximate)2 Oct 2026Latest source: none datedLatest event: none dated
PBMR demonstration power plant at Koeberg (terminated)SMRSouth AfricaCanceledPBMR (Pebble Bed Modular Reactor)—Koeberg nuclear station site (PBMR)Western Cape · site-area point (approximate)19 Oct 2026Latest source: none datedLatest event: none dated
Shenyang 2 x 200 MW nuclear heating project (NHR200-I, 2001)SMRFrom an earlier planChinaCanceledDesign profile not linkedthermal onlyNot recordedShenyang (site not stated)Liaoning · town named, no map pin6 Oct 2026Latest source 2024Latest event Apr 2001
SRC initial eVinci demonstration proposal (canceled)MicroreactorCanadaCanceledeVinci≈ 5 MWe (derived)Saskatchewanregion only, no map pin14 Oct 2026Latest source 15 Apr 2026Latest event: none dated
Toshiba 4S proposal at Galena, Alaska (mid-2000s)SMRUnited StatesCanceled4S10 MWe (gross/net unspecified) · plantGalena, AlaskaAlaska · town named, no map pin2 Oct 2026Latest source 6 May 2026Latest event: none dated
UAMPS Carbon Free Power Project (canceled)SMRFrom an earlier planUnited StatesCanceledNuScale VOYGR (US460 / NPM)462 MWe (gross/net unspecified) · plantThe WNA USA profile lists VOYGR-6 as 462 MWe and calls this project a VOYGR-6 plant.INL / CFPP proposed NuScale siteIdaho · town-level point (approximate)19 Oct 2026Latest source, document dated 8 Nov 2023Latest event 8 Nov 2023

Research coverage for the 222 matching projects: of 1998 answers to nine review questions, 880 have a supported statement, 971 were reviewed with a stated limit and 147 are not reviewed yet. This counts recorded research, not readiness or the likelihood of construction.

Coverage by question

Each project is asked the same nine questions: five commercial questions and four reader questions. Only completed source reviews are counted. A supported statement can describe a conditional plan or preparatory work; read it on the project page. Not disclosed, not applicable, conflicting evidence and source unavailable are reviewed limits. Not reviewed is unfinished research, not a finding that nothing exists. The counts cover every page of matching projects, not only the page shown or the projects chosen for comparison.

QuestionSupported statementNot disclosedNot applicableConflicting evidenceSource unavailableNot reviewedProjects
Customer or offtaker551620005222
Contractor721440015222
Funding821360004222
Project fuel commitment371800005222
Comparable schedule revision161960604222
Permissions and public process180350106222
Site dependencies (land, grid, water)188280105222
Spent fuel, waste and closure7540312101222
Next decision and prerequisites17525100012222
All nine questions88094613931471998

The address bar keeps the filters and the view, so they can be shared. From the table you can download every matching project as a CSV file or choose two to four to compare. Coverage is not a complete worldwide census: see Coverage and gaps.

Company roles are shown as recorded; an operator is not automatically a vendor. “Record reviewed” is the date of the recorded source review, not an announcement date or a guarantee that every field is current. A missing design link does not mean no design exists. A project without a map pin stays in the table; the pin line counts it. A row marked “From an earlier plan” is a proposal kept from an earlier plan, agreement, catalog or country profile; its present status is not established.