Companies

Japan Atomic Energy Agency

NEA’s 2025 catalog identifies Japan Atomic Energy Agency as a reactor design developer. Country denotes the catalog headquarters location; current ownership and commercial availability have not been established.

Projects
Operating: HTTR test reactor with planned hydrogen coupling, Oarai. 3 designs.
Evidence
One source (IAEA/NEA): NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.

Key facts

Organization type
Research, Reactor developer
Category
research institution
Country
Japan
Confidence
medium
Record reviewed
2 Oct 2026 (record review date, not proof of current activity)

All fields

(5 without a known value)
Aliases
None recorded in this release
Listing status
Unknown (no listing is recorded here; this does not mean the organization is private)
Exchange / ticker
None recorded in this release
Ownership / control
Unknown (no owner or controller is recorded here)
Website
None recorded in this release

Linked designs

  • GTHTR300 — High-temperature gas-cooled reactor (HTGR) · SMR
  • HTTR — High-temperature gas-cooled reactor (HTGR) · SMR
  • HTR50S — High-temperature gas-cooled reactor (HTGR) · SMR

Tracked deployment projects

1 linked project record: 1 operating, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.

Agreements (2)

Agreements, plans, studies and government programs that name this organization as a participant. They are not deployment projects and are not counted above.

Ownership & relationships

Milestones

Organization-level unresolved information

Sources

(1)