Projects / Japan · Operating

HTTR test reactor with planned hydrogen coupling, Oarai

JAEA's HTTR at the Oarai Nuclear Engineering Institute in Japan is an operating test reactor (30 MWt) that generates no electricity, with hydrogen coupling planned.

Current status

Stage
Operating
How current
General record check . Bounded evidence review . 5 of 8 listed sources have a publication or document date recorded here; the newest is 27 Mar 2025. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
Recorded: NRA decision to grant the HTTR installation-change permit (3 Jun 2020). All permissions and applications
Latest development
26 Sep 2025 · Recorded development: JAEA files an amendment to the HTTR hydrogen-coupling application. Source: JAEA: amendment to HTTR licence application for hydrogen plant connection. Updates entry
Next dated milestone
Planned step: 2030 (target). HTTR hydrogen production (JAEA target). This is not an achieved milestone. Source: JAEA: amendment to HTTR licence application for hydrogen plant connection.
Selected limitations
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Permission evidence appropriate to stage. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Description

JAEA's HTTR first reached criticality in 1998; in 2025 JAEA applied to the regulator to connect a hydrogen production plant, targeting hydrogen by 2030. JAEA's August 2026 slides record six regulator review meetings on the hydrogen-coupling license change between May 2025 and April 2026 with no permit yet, and place the hydrogen production test around fiscal 2029 to 2030. On 3 June 2020 the Nuclear Regulation Authority decided to grant an installation-change permit for HTTR under article 26(1) of the Reactor Regulation Act, on an application received 26 November 2014. The draft permit letter has a blank number and a blank date, so no permit number is stored. This is not an operating license. JAEA dates the restart to 30 July 2021 and records 100% reactor power at 850 °C on 19 September 2021. Its August 2026 symposium slides document a further full-power thermal safety demonstration in March 2024. These are thermal test milestones, not electricity generation or commercial service. The hydrogen-coupling permit remains unissued. No electricity-generation output is assigned to this thermal test reactor. JAEA's history says the installation-permit application was made in February 1989, the permit was obtained in November 1990 and construction began in 1991.

Key facts

Design
HTTR (SMR)
Technology
High-temperature gas-cooled reactor (HTGR) · helium
Reactor vessel of this design
13.2 m tall, 5.5 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 235.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
Japan Atomic Energy Agency
Vendor for linked design
Japan Atomic Energy Agency
Location
JAEA Oarai Nuclear Engineering Institute · Japan · precision: site area (named plant, laboratory, base, port, campus or parcel)
Approximate institute-area point from OpenStreetMap for the facility named by the regulator or operator; not the reactor building.
Coordinates
36.2655, 140.5502 · site-area point (approximate)
Electrical capacity
thermal only (no MWe) · scope: plant
Thermal capacity
30 MWth (nameplate; basis unspecified)
Modules planned
1
Purpose
Research or test reactor
Construction start
1991HTTR construction begins
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
18 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

HTTR test reactor with planned hydrogen coupling, Oarai is recorded at JAEA Oarai Nuclear Engineering Institute, Ibaraki, Japan. Operator: Japan Atomic Energy Agency. Recorded vendor: Japan Atomic Energy Agency. Stage: Operating. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: institute-area point for the JAEA Oarai Nuclear Engineering Institute (query not recorded)

This project is recorded as thermal only (no MWe). Modules planned: 1. Recorded thermal output is 30 MWth (nameplate; basis unspecified).

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Operator or intended licensed owner
Reactor supplier
Funding and government decisions
Source-backed project statement

JAEA's 27 March 2025 notice says the work to install and connect a hydrogen facility to HTTR is in a project commissioned by the Agency for Natural Resources and Energy. No amount is stated, and the notice does not say construction costs have been paid. JAEA: HTTR hydrogen production facility (press release)

Fuel
  • Fuel form stated for HTTR (catalog profile as of 14 Feb 2025)UO2 TRISO ceramic coated particle
Project fuel information is described in the source-backed statement below.
Source-backed project statement

The 7 August 2026 slides say the second HTTR fuel charge, delivered in March 2005, was the last fuel manufactured for HTTR, and that transfer of domestic fuel-manufacturing technology to JAEA has been agreed. No current fabrication contract or new delivery is stated. JAEA: HTTR hydrogen-coupling status and schedule (symposium slides, 7 August 2026)

Programs and agreements naming the project
Not found in the sources we checked (3): Customer or offtaker; Contractor; Comparable schedule revision
Customer or offtaker

JAEA says it aims to produce hydrogen with HTTR heat by 2030 and to show that a high-temperature reactor can supply hydrogen for hard-to-abate industry. The August 2026 slides say the agency, JAEA and Mitsubishi Heavy Industries are exchanging views with steel, chemical and wholesale companies about future needs. No company is named as a buyer of HTTR hydrogen. JAEA: HTTR hydrogen production facility (press release); JAEA: HTTR hydrogen-coupling status and schedule (symposium slides, 7 August 2026)

Contractor

The notices say JAEA applied to connect a hydrogen facility to HTTR. They do not name a construction contractor. A statement that Mitsubishi Heavy Industries is carrying out basic design appears under the separate demonstration-reactor section of the August 2026 slides, not as an HTTR construction award. JAEA: HTTR hydrogen production facility (press release); JAEA: HTTR hydrogen-coupling status and schedule (symposium slides, 7 August 2026)

Comparable schedule revision

Comparable schedule revision not established. The September 2025 notice aims to make hydrogen with HTTR heat by 2030. The August 2026 slides say the HTTR hydrogen demonstration is planned for 2028 or later. Those statements describe the hydrogen test, not two forecasts of the reactor's operating date. A demonstration reactor aimed at the 2030s is a different plant. JAEA: amendment to HTTR licence application for hydrogen plant connection; JAEA: HTTR hydrogen-coupling status and schedule (symposium slides, 7 August 2026)

Not recorded in SMRMap's reviewed evidence (2): Project proposer or applicant; Site host or owner
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Site host or owner

Timeline

Recorded developments

Earlier developments (8)

Targets

Planned, target and estimated dates are not achievements or commitments.

Permissions and applications

Other applications and decisions

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes)

Evidence dates

(5 of 8 sources with a publication or document date)
Latest dated listed source publication: JAEA: HTTR hydrogen production facility (press release): 27 Mar 2025.Latest dated listed source document: JAEA Oarai: completion of HTTR periodic licensee inspection after restart (22 September 2021): 22 Sep 2021.Latest dated listed source revision: JAEA ATOMICA 03-03-06-01: Development of HTGR technology in Japan and international cooperation (updated August 2016): Aug 2016.Latest dated recorded event: JAEA files an amendment to the HTTR hydrogen-coupling application: 26 Sep 2025.3 of 8 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(8)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: HTTR test reactor with planned hydrogen coupling, Oarai — https://smrmap.com/projects/httr-oarai/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “HTTR test reactor with planned hydrogen coupling, Oarai”. Record reviewed 18 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/httr-oarai/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.