GTHTR300
High-temperature gas reactor. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Basic design.
- Evidence
- 3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
The catalog and the NEA profile describe a high-temperature gas-cooled reactor. - Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- Japan Atomic Energy Agency
- Fuel form
- UO2 TRISO ceramic coated particle
- Development status (as stated)
- Basic design
- Reactor vessel
- 23 m tall, 8 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 189.The weight cell's approximation does not qualify these vessel dimensions.SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallGTHTR300 *
23 m tall, 8 m across - Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(3)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 152 - IAEA ARIS design record: GTHTR300 (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(3 notes)
- Evidence review. The IAEA catalog presents JAEA's GTHTR300 as a prismatic high-temperature gas-cooled reactor with helium in a direct cycle, for electricity, hydrogen, desalination and steelmaking, and describes its basic design as complete. The NEA third edition independently describes a high-temperature gas-cooled reactor with a helium gas turbine. These explicit classification statements support HTGR; stored helium coolant and thermal spectrum remain. No numerical module rating is assigned on this identity profile, and no deployment site is established by the reviewed entries. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
A JAEA update that selects a single thermal rating rather than an upper value, or names a deployment site. Next scheduled check: 19 Jan 2027.
- Module rating. The catalog calls this a 300 MW(e) reactor and says thermal power may be rated up to 600 MW(t). Those figures are not stored on this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A later developer or regulator specification that states this design's module output with an explicit basis. The figure would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.
- Technology family. The catalog and the NEA profile describe a high-temperature gas-cooled reactor. The stored family HTGR matches that explicit class. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
No further document is needed for the family label. A JAEA notice that the concept is no longer an HTGR would reopen it. Next scheduled check: 19 Jan 2027.