HTTR
JAEA's HTTR at Oarai is a helium-cooled high-temperature gas research and test reactor rated at 30 MW thermal. JAEA records its operating history and thermal-use research; this profile is not a commercial power-plant design or a claim of electricity generation. The dated NEA catalog identity is linked to the operating HTTR project.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- Operating: HTTR test reactor with planned hydrogen coupling, Oarai. Development status as stated in the catalog dated 14 Feb 2025: In operation.
- Evidence
- 3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 8 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- Japan Atomic Energy Agency
- Module thermal
- 30 MWth (nameplate; basis unspecified)
- Fuel form
- UO2 TRISO ceramic coated particle
- Development status (as stated)
- In operation
- Reactor vessel
- 13.2 m tall, 5.5 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 235.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallHTTR
13.2 m tall, 5.5 m across - Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 8 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Module electrical
- Not recorded
Tracked deployment projects
- HTTR test reactor with planned hydrogen coupling, Oarai — Operating · Japan
Design sources
(3)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 154 - JAEA: HTTR test-reactor technical specifications (government, accessed 8 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. JAEA's section of the 2024 IAEA SMR catalog (third edition, June 2025) describes the High Temperature Engineering Test Reactor (HTTR) as Japan's first HTGR, at JAEA's Oarai institute, a prismatic test reactor with TRISO coated-particle UO2 fuel, graphite moderator and helium coolant, developed by JAEA in cooperation with MHI, Toshiba, IHI, Hitachi, Fuji Electric, NFI and Toyo Tanso. Its purpose is research: establishing the technical basis for advanced HTGRs, high-temperature engineering research and demonstrating nuclear heat applications, not commercial electricity. JAEA's technical page gives 30 MW thermal power, helium coolant, first criticality on 10 November 1998 and 950°C outlet temperature at full power in 2004. The catalog says HTTR was shut from March 2011 and restarted in July 2021 after NRA permission, lists it as in operation, and says a project to demonstrate hydrogen production with HTTR heat by 2030 has been launched, which matches the linked Oarai HTTR hydrogen-coupling project. The stored JAEA vendor, HTGR family, helium coolant, TRISO UO2 fuel and 'In operation' status stay; the stored thermal spectrum is not stated in these texts, and the stored 30 MWth rating sits on an identity-only profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); JAEA: HTTR test-reactor technical specifications
What would change this
JAEA or NRA documents on the HTTR hydrogen-production (HTTR-H2) coupling license change or start of hydrogen tests. Next scheduled check: 19 Jan 2027.
Regulatory actions
Compare reviews and approvals across designs
Other applications and decisions
- NRA decision to grant the HTTR installation-change permit — HTTR test reactor with planned hydrogen coupling, Oarai
Other regulatory action · Issued / approved · NRA · decided 3 Jun 2020 · submitted 26 Nov 2014
On 3 June 2020 the Nuclear Regulation Authority decided that the application to change the HTTR installation at Oarai meets the permit criteria and that the installation-change permit shall be granted under article 26(1) of the Reactor Regulation Act. The application was received on 26 November 2014. The draft letter has a blank number and a blank date, so no permit number is stored. This decision is not an operating license and is distinct from the July 2021 restart.
Sources: NRA commission paper deciding the HTTR installation-change permit (3 June 2020)