Designs

ELENA

ELENA is identified as a microreactor design in the ARIS status report dated 2024-10-17, attributed to NRC “Kurchatov Institute”. This dated design identity does not establish current availability, a deployment site, output, or regulatory permission. The IAEA's 2026 catalog section, supplied by its contributor, describes an integral reactor of PWR type with thermoelectric conversion. Other technical values remain unknown here pending an independent scope and basis check.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 17 Oct 2024: Conceptual design.
Evidence
3 sources; first primary source: ARIS original status report — ELENA (2024-10-17). Record reviewed 2 Oct 2026.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Catalog identity snapshot: 17 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
Microreactor
Technology
Integral pressurized water reactor (iPWR)
The IAEA's 2026 catalog section, supplied by its contributor, says the design is based on an integral reactor with its primary circuit enclosed in one vessel and lists the type as PWR, though it makes electricity with thermoelectric modules rather than a turbine.
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 17 Oct 2024
NRC “Kurchatov Institute”
Fuel form
UO2 or MOX
Development status (as stated)
Conceptual design
Reactor vessel
3.7 m tall, 1.25 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 401.diameter is internal prose states internal diameter 1250 mm and height 3700 mm wall thickness 132 mm is not the diameter the prose does not swap the cell: height remains 3.7 m and diameter remains 1.25 m The stated diameter is internal; it is not an outside width.SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
ELENA *
3.7 m tall, 1.25 m across
All vessels to scale
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(3)

Evidence and open questions

(3 notes)
  • Evidence review. The ARIS status report identifies ELENA for the Russian Federation and classifies design status as conceptual design. The catalog summary states ELENA, 68 kW(e), PWR, National Research Centre Kurchatov Institute, Russian Federation, conceptual design. That electrical figure is citable and is not stored, because this is an identity profile. It is not converted to megawatts. Stored conceptual-design status matches. The family is iPWR because the 2026 catalog section, attached for the reactor type only, says the design is based on an integral reactor. ARIS parameter tables are not copied. Last checked 19 Oct 2026. ARIS original status report — ELENA (2024-10-17); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
    What would change this

    A non-identity record if the 68 kW(e) catalog figure should be stored, or a Kurchatov note that states gross versus net. Next scheduled check: 19 Jan 2027.

  • Module rating. The catalog states 68 kW(e). The figure is not stored on this identity profile, and it is not converted to MWe. No module electrical field is proposed. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
    What would change this

    A decision to store 68 kW(e) only on a record that is allowed to carry a module rating. Next scheduled check: 19 Jan 2027.

  • Technology family. The IAEA's 2026 catalog section, supplied by its contributor, says the design is based on an integral reactor with its primary circuit enclosed in one vessel and lists the type as PWR, though it makes electricity with thermoelectric modules rather than a turbine. Printed pages 401 and 402. Last checked 3 Nov 2026. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026)
    What would change this

    A Kurchatov Institute or IAEA document that changes the ELENA reactor type or layout. Next scheduled check: 3 Feb 2027.