Companies / org-holtec-smr-llc
SMR, LLC (Holtec)
Holtec subsidiary responsible for Pioneer development during design, licensing and construction. It submitted the construction-permit application on behalf of Palisades SMR, LLC. A filing is not a granted permit.
- Roles
- Project proposer
- Organization type
- other
- Country
- United States
- Aliases
- —
- Listing status
- Unknown
- Exchange / ticker
- —
- Ownership / control
- unknown
- Website
- —
- Confidence
- medium
- Last verified
- 2026-10-09
Linked designs
- No designs tracked here.
Tracked deployment projects
1 linked project records: 1 licensing. These include proposals and historical cancelled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- Holtec Pioneer Units 1 and 2 (SMR-300 at Palisades) — Licensing · United States
Recorded link: application filing entity · project record checked 2026-10-09 · 3 recorded project actions · sources
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- None recorded in this release.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
- Pioneer Units 1 and 2 application, General and Financial Information (ML25365A986) (regulator_primary, accessed 2026-10-09)