Aalo-X

DOE test reactor, distinct from the commercial Aalo pod proposal. CX-271002 limits the INL critical assembly to 10 watts thermal, with no electricity, a dry core, and graphite moderation. That limit is the assembly's zero-power bound, not a rating for a later power reactor.

Reactor type
No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
Projects
Commissioning: Aalo-X at Idaho National Laboratory.
Evidence
4 sources; first primary source: DOE: fourth criticality, Aalo-X. Record reviewed 4 Oct 2026.

Key facts

Class
Microreactor
Technology
Other (see description)
Coolant
Other (see description)
Spectrum
Thermal
Developer / vendor(s)
Aalo Atomics
Module electrical
thermal only (no MWe)
Module thermal
10 watts thermal (zero-power limit)
Fuel form
Sponsor-owned low-enriched uranium dioxide (UO2) fuel pins
Enrichment
4.95% enriched UO2
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
4 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(4)

Evidence and open questions

(2 notes)
  • Evidence review. DOE's categorical exclusion CX-271002 (approved 14 April 2026) covers the Aalo-X Critical Assembly at Idaho National Laboratory: a graphite-moderated, dry, zero-power critical assembly limited to 10 watts thermal, with no sodium or other liquid coolant and no electricity, using sponsor-owned low-enriched UO2 fuel pins that may later be reused in 'the future Aalo-X reactor'. DOE's 6 July 2026 article says Aalo Atomics' test reactor Aalo-X completed a zero-power fueled criticality demonstration at INL under the DOE Reactor Pilot Program, and the DOE EM article of 14 July 2026 lists Aalo-X among the microreactor designs in the readiness reviews. The DOE Reactor Pilot Program slides (file created 17 July 2026) describe Aalo's pilot reactor as a liquid-metal-cooled thermal fission microreactor with 4.95% enriched UO2 fuel, list PDSA approval on 3 March 2026, DSA approval on 30 April 2026 and criticality on 4 July 2026 for a critical assembly test below 10 watts, and list Aalo X at INL as a 10 MWe sodium thermal reactor with a full-power test planned in 2027. These DOE authorizations are pilot-program safety-basis approvals for the critical assembly, not NRC permission for a power reactor. The sources link the design to the INL deployment. Stored vendor, the 10 W zero-power bound and the UO2 fuel stay supported; the stored 'unknown' spectrum can become thermal from the DOE slides, and the stored coolant 'other' fits only the dry critical assembly, not the sodium-cooled Aalo-X reactor the slides describe. Last checked 19 Oct 2026. DOE Idaho categorical exclusion CX-271002 PDF: Aalo-X critical assembly; DOE: fourth criticality, Aalo-X; DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212)
    What would change this

    A DOE authorization (PDSA/DSA) for the powered Aalo-X reactor at INL, expected before its planned 2027 full-power test, which would fix the reactor's coolant, spectrum and thermal and electrical ratings separately from the critical assembly. Next scheduled check: 19 Jan 2027.

  • Neutron spectrum. DOE's Reactor Pilot Program slides (July 2026) describe Aalo's pilot reactor as a liquid-metal-cooled thermal fission microreactor and list Aalo X at INL as a 10 MWe sodium thermal reactor; CX-271002 adds that the critical assembly is graphite-moderated. Thermal spectrum is stated by DOE for this design. Last checked 19 Oct 2026. DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212)
    What would change this

    DOE's safety-basis approval for the powered Aalo-X reactor, which would confirm the spectrum of the power configuration rather than the zero-power assembly. Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Environmental decision

  • DOE Idaho categorical exclusion CX-271002 for the Aalo-X critical assembly — Aalo-X at Idaho National Laboratory
    Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 14 Apr 2026
    Approved 14 April 2026 under posting DOE-ID-INL-26-013. Covers installation and zero-power operation of the critical assembly at no more than 10 watts thermal. It is an environmental categorical exclusion, not a construction permit or operating license, and it does not authorize a later power reactor.
    Sources: DOE Idaho categorical exclusion CX-271002 PDF: Aalo-X critical assembly