Designs / dsn-alvin

Alvin experimental molten-salt reactor

ASNR describes Alvin as a 200 kWth experimental molten-salt reactor, separately included in the NEA design inventory. It is the first planned configuration of INB Alpha at Cadarache, distinct from commercial Stellarium and the later proposed MegAlvin configuration. The company’s 2030 criticality date is a target. No electrical rating or operating authorization is inferred.

Class
SMR
Technology
Molten salt reactor (MSR)
Coolant
molten salt
Spectrum
unknown
Developer / vendor(s)
Stellaria
Module electrical
—
Module thermal
0.2 MWth (nameplate; basis unspecified)
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-13

Tracked deployment projects

Design sources