ABV-6E
ABV-6E is JSC Afrikantov OKBM's floating integral pressurized water reactor with natural coolant circulation. The company's section of the 2026 catalog, which is contributor material, lists it at detailed design.
- Reactor type
- Integral pressurized water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated in the catalog dated 17 Oct 2024: Detailed design.
- Evidence
- 3 sources; first primary source: ARIS original status report — ABV-6E (2024-10-17). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Compare with other designs
Catalog identity snapshot: 17 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Integral pressurized water reactor (iPWR)
The IAEA's 2026 catalog section, supplied by its contributor, calls ABV-6E an integral PWR with its steam generators inside the reactor pressure vessel. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 17 Oct 2024
- Afrikantov OKBM
- Fuel form
- UO2
- Development status (as stated)
- Detailed design
- Reactor vessel
- 6 m tall, 2.4 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 129.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallABV-6E
6 m tall, 2.4 m across - Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(3)
- ARIS original status report — ABV-6E (2024-10-17) (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) (IAEA/NEA, published Sep 2026, accessed 2 Nov 2026)
Evidence and open questions
(3 notes)
- Evidence review. ABV-6E is identified by the ARIS status report for the Russian Federation and by the catalog summary as a floating PWR from JSC Afrikantov OKBM at detailed design. This identity profile does not store a module rating. The 2026 catalog section is attached for the reactor type only. The ARIS report is used only for the title and the design-status classification. A numeral in the catalog summary has no unit in the fragment that is quoted, and it is not treated as a megawatt rating. Stored status text says Final design, which the status line does not say. Last checked 19 Oct 2026. ARIS original status report — ABV-6E (2024-10-17); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A non-ARIS developer or regulator specification that states a reusable module output with its basis. ARIS parameters would still not be copied. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. No reusable source states a module rating with a unit. The ARIS report is limited to identity and design-status classification, so its parameters are not reused. The catalog summary line names a floating PWR and detailed design. An unlabeled numeral in that same summary is not adopted and is not quoted here. Last checked 19 Oct 2026. ARIS original status report — ABV-6E (2024-10-17); Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A citable developer, regulator or catalog line that states the module output with a unit, for the coordinator to record outside this identity profile. Next scheduled check: 19 Jan 2027.
- Technology family. The IAEA's 2026 catalog section, supplied by its contributor, calls ABV-6E an integral PWR with its steam generators inside the reactor pressure vessel. Printed pages 129 and 130. Last checked 3 Nov 2026. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026)
What would change this
An OKBM or IAEA document that changes the ABV-6E reactor type or layout. Next scheduled check: 3 Feb 2027.