Designs

ACP100S

ACP100S is a floating integral pressurized water reactor from CNNC, developed from its land-based ACP100, at basic design in CNNC's section of the 2026 catalog, which is contributor material.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Projects
No live project recorded here; 1 earlier-plan record (CNNC floating SMR demonstration proposal). Development status as stated in the catalog dated 17 Oct 2024: Basic design.
Evidence
3 sources; first primary source: ARIS original status report — ACP100S (2024-10-17). Record reviewed 2 Oct 2026.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Catalog identity snapshot: 17 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Integral pressurized water reactor (iPWR)
The IAEA's 2026 catalog section, supplied by its contributor, lists ACP100S as an integral PWR with its steam generators inside the reactor pressure vessel.
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 17 Oct 2024
CNNC / NPIC
Fuel form
UO2
Development status (as stated)
Basic design
Reactor vessel
10 m tall, 3.35 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 135.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
ACP100S
10 m tall, 3.35 m across
All vessels to scale
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(3)

Evidence and open questions

(3 notes)