Projects / prj-cnnc-floating-demo-2016

CNNC floating SMR demonstration proposal (2016)

A 15 January 2016 CAEA-hosted account credited to Xinhua and CNNC reports CNNC's Nuclear Power Institute's plan to start building a floating demonstration reactor at the end of 2016 and operate it in 2019. The same account records ACP100S's inclusion in China's energy innovation plan and describes the ACP10S, ACP25S and ACP100S floating family. The specific demonstration configuration remains unassigned here; this described plant proposal is distinct from national plan inclusion and the land-based Linglong One project. The 2016 and 2019 dates are historical targets, not evidence of construction or operation. Host location, module count, plant output, operator, project permissions and subsequent status are not established by the reviewed account.

What this record says

Last verified 2026-10-14. This is a record review date, not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Site and deployment

CNNC floating SMR demonstration proposal (2016) is recorded at CNNC floating demonstration location (undisclosed), state or province not recorded, China. Operator: No operator is recorded. Recorded vendor: China National Nuclear Corporation. Stage: Announced. Location precision: undisclosed.

Capacity

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Permission recorded

Latest supported development

No actual dated development is recorded.

Next documented milestone

No next milestone date is recorded.

Material unknowns

Stage
Announced
Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
China National Nuclear Corporation
Location
CNNC floating demonstration location (undisclosed) · China · precision: undisclosed
The 2016 account describes a demonstration for China's waters without identifying a port, host or coordinates.
Coordinates
undisclosed / not plotted
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
—
Inclusion basis
historical_smr_program
Confidence
medium
Last verified
2026-10-14 (publication/verification date)

Milestones & dated events

Regulatory actions

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Sources