SHELF-M
SHELF-M is NIKIET's integral pressurized water reactor, a modernized small modular reactor for land-based plants supplying electricity to remote areas, at detailed design in the 2024 catalog.
- Reactor type
- Integral pressurized water reactor. How it works, with a 3D view.
- Projects
- Siting: Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka. Development status as stated in the catalog dated 1 Jul 2025: Detailed design.
- Evidence
- 2 sources; first primary source: ARIS original status report — SHELF-M (2025-07-01). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 1 Jul 2025 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Integral pressurized water reactor (iPWR)
- Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 1 Jul 2025
- NIKIET
- Fuel form
- Cermet (UO2 + metallic silumin)
- Development status (as stated)
- Detailed design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka — Siting · Russia
Agreements naming this design (1)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- Rosatom list of prospective Arctic sites for SHELF-M microreactor plants (Yakutia, Krasnoyarsk, Chukotka) — Feasibility or siting study · Status not established · announced Aug 2023
Concerns Russia
Design sources
(2)
- ARIS original status report — SHELF-M (2025-07-01) (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The IAEA Small Modular Reactor Technology Catalogue, 2024 edition (third edition printed June 2025, material supplied by NIKIET), names NIKIET as technology developer of SHELF-M and describes it as an integral PWR with light-water coolant and moderator. It calls SHELF-M a modernized SMR for small land-based nuclear plants supplying electricity to remote areas with decentralized supply, based on the SHELF reactor unit and NIKIET's marine reactor experience, with 35 MW(t) thermal capacity and a rated output of up to 10 MW(e) per reactor unit; 'up to 10' is an upper bound with no gross or net basis. The catalog gives detailed design as the design status and says the licensing process is to be started in 2027, so no license or permission exists in that edition. The ARIS report (published 1 July 2025) classifies its spectrum as thermal. Neither source names the linked Sovinoe deposit plant in Chukotka or any other site. Stored vendor, light-water coolant, thermal spectrum and cermet fuel stay supported; the stored family iPWR follows the catalog's 'Integral PWR', and the catalog's rating is not stored on this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); ARIS original status report — SHELF-M (2025-07-01)
What would change this
A Rostekhnadzor siting or construction license for a SHELF-M plant (the catalog expects licensing from 2027), or a Rosatom/NIKIET project document for the Chukotka plant confirming the per-unit rating. Next scheduled check: 19 Jan 2027.
- Module rating. The 2024 IAEA SMR Technology Catalogue (third edition, June 2025) gives SHELF-M 35 MW(t) and up to 10 MW(e), the electrical figure being an upper bound. This record is one of the dated catalog identity profiles that, by the project's standing rule and its regression test, carry no rating until a current technical primary for the same version is reviewed; the figure is therefore not stored. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A NIKIET or Rosatom project document for the first SHELF-M plant stating its net or gross electrical output, which would replace the catalog's 'up to 10 MW(e)' upper bound with a qualified rating. Next scheduled check: 19 Jan 2027.