Projects / Russia · Siting

Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka

Rosatom plans a Shelf-M unit (10 MW electric, 35 MW thermal) as the Chukotka small nuclear plant at the Sovinoe gold deposit in Iultinsky district.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . None of the 3 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • No operator is recorded.
  • No map pin is shown for this record.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Description

The plant would supply the Elkon mining and metallurgical company that is to develop the deposit. In July 2026 Rosatom's director general said the construction schedule is prepared, engineering surveys of the site have begun, fuel endurance tests are complete and the investment justification is nearing completion. Rosatom's newspaper expects physical start-up and commercial operation in 2030, while a 30 July 2026 regional report gives construction in 2027 and commercial operation in 2032. No siting or construction license is reported.

Key facts

Design
SHELF-M (SMR)
Technology
Integral pressurized water reactor (iPWR) · light water
Operator(s)
Not recorded
Vendor for linked design
NIKIET
Location
Sovinoe gold deposit · Russia · precision: site area (named plant, laboratory, base, port, campus or parcel)
The sources name this place but publish no coordinate for it, so no pin is shown.
Coordinates
Named site, no map pin
Electrical capacity
10 MWe (gross/net unspecified) · scope: plant
Thermal capacity
35 MWth (nameplate; basis unspecified)
Modules planned
1
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
6 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka is recorded at Sovinoe gold deposit, Chukotka, Russia. Operator: No operator is recorded. Recorded vendor: NIKIET. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); named site, no map pin.

Recorded electrical output is 10 MWe (gross/net unspecified), scope plant. Modules planned: 1. Recorded thermal output is 35 MWth (nameplate; basis unspecified).

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
  • Vendor for the linked designNIKIET
Customer or offtaker

Source-backed project statement Rosatom's corporate newspaper on 5 July 2026 and Atomnaya Energiya 2.0 on 30 July 2026 say the Shelf-M reactor is intended for the Chukotka small nuclear plant that will supply energy to the Elkon mining and metallurgical company (Эльконский ГМК), which is to develop the Sovinoe deposit. This names an intended energy recipient. Neither source describes a signed power or heat supply contract. Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit; Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026)

Fuel
  • Fuel form stated for SHELF-M (catalog profile as of 1 Jul 2025)Cermet (UO2 + metallic silumin)
No project-specific fuel supply arrangement is recorded as a structured fact.

The 5 July 2026 Rosatom newspaper article says the Shelf-M fuel will be uranium dioxide in a silumin matrix similar to icebreaker fuel and that fuel endurance tests are complete. Testing and a design fuel form are not a supply commitment, and neither that article nor the 30 July 2026 report names a fuel manufacturer, quantity or delivery for the Sovinoe plant. Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026)

Programs and agreements naming the project
Not found in the sources we checked (3): Contractor; Funding and government decisions; Comparable schedule revision
Contractor

Rosatom's director general said in July 2026 that the construction schedule for the Chukotka small plant is prepared and engineering surveys of the site have begun. Neither the 5 July 2026 Rosatom newspaper article nor the 30 July 2026 Atomnaya Energiya 2.0 report names the organization doing the surveys, the general designer or a construction contractor. Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026); Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit

Funding and government decisions

The 5 July 2026 Rosatom newspaper article says the investment justification for the plant is nearing completion and gives no amount. Atomnaya Energiya 2.0's 30 July 2026 report says Rosatom's mining division has invested more than 1 billion rubles in the gold-mining cluster around Sovinoe, which is not money for the nuclear plant. Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit; Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026)

Comparable schedule revision

Rosatom's corporate newspaper on 5 July 2026 says physical start-up and commercial operation of the Shelf-M plant are expected in 2030, while Atomnaya Energiya 2.0 on 30 July 2026, citing a regional news agency, says construction is planned for 2027 and commercial operation for 2032. Neither source says the earlier date was moved, so these are conflicting targets, not a reported revision. Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026); Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit

Not recorded in SMRMap's reviewed evidence (2): Operator or intended licensed owner; Site host or owner
Operator or intended licensed owner
Site host or owner

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes, 1 not yet reviewed)
  • Evidence review. Atomnaya energiya 2.0 (30 July 2026, citing IA Chukotka) reports that Rosatom completed the economic justification for the first land-based small nuclear plant with a Shelf-M reactor, that engineering surveys have begun on the future construction site, and that the 370-tonne monoblock will operate for 60 years at the Sovinoe deposit (gloss of the Russian). It says the Chukotka small nuclear plant is to supply the Elkon mining and metallurgical company (Эльконский ГМК), which is to develop the Sovinoe deposit, quotes Rosatom's director general that the Shelf-M will deliver 10 MW electric and 35 MW thermal, and gives construction in 2027 and commercial operation in 2032. Rosatom's newspaper Strana Rosatom (5 July 2026) carries the same quotation (construction schedule prepared, site surveys begun, fuel endurance tests completed, investment justification nearing completion) but expects physical start-up and commercial operation in 2030. A 2023 item places the Sovinoe gold deposit in Iultinsky district, Chukotka, among five prospective Shelf sites. No license application or Rostekhnadzor siting license is reported; completion of the investment justification and a siting license are the next documentary decisions. The stored 10 MWe, 35 MWth, one unit, Shelf-M design and siting stage stay; the July 2026 article resolves the stored Elkon-versus-Sovinoe discrepancy, while the operation year conflicts (2030 versus 2032). No opened source names Rosatom, or anyone else, as the intended operator. Last checked 19 Oct 2026. Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit; Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026); Atomnaya energiya 2.0: Sovinoe deposit in Iultinsky district
    What would change this

    Rostekhnadzor's siting license for the Chukotka small nuclear plant at Sovinoe, or Rosatom's approved investment justification stating the schedule and operating organization. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed. The July 2026 article says the Shelf-M monoblock will operate for 60 years at the Sovinoe deposit, and the 2023 item places the Sovinoe gold deposit in Iultinsky district, Chukotka. No coordinates or parcel are published, so the deposit is recorded as a named site without a map pin. Last checked 19 Oct 2026. Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit; Atomnaya energiya 2.0: Sovinoe deposit in Iultinsky district
    What would change this

    A Rostekhnadzor siting license or project documentation giving the plant location within the Sovinoe deposit. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. The next step Rosatom names is completing the investment justification for the Chukotka plant, which its director general said in July 2026 was nearly finished. Schedules differ: Rosatom's newspaper expects physical start-up and commercial operation in 2030, while the 30 July 2026 trade report gives construction in 2027 and commercial operation in 2032. All are targets; no construction decision or license is reported. Last checked 23 Oct 2026. Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026); Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit
    What would change this

    A Rosatom investment decision or construction start at Sovinoe, or a Rostekhnadzor license. Next scheduled check: 23 Apr 2027.

  • Permissions and public process: Not disclosed in the reviewed evidence. Rosatom's director general said in July 2026, as reported by Rosatom's newspaper, that the construction schedule for the Chukotka Shelf-M plant was prepared, site engineering surveys had begun, fuel endurance tests were complete and the investment justification was nearly finished. Neither that report nor the 30 July 2026 trade report names a Rostekhnadzor siting or construction license, an environmental review or any public hearing for the Sovinoe site. Last checked 23 Oct 2026. Strana Rosatom: Rosatom completes the investment justification for the Chukotka small plant (5 July 2026)
    What would change this

    A Rostekhnadzor siting license for the Chukotka small nuclear plant or a notice of public hearings on its environmental assessment. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). A 30 July 2026 trade report says engineering surveys had begun at the future construction site and that the 370-tonne Shelf-M unit will operate for 60 years at the Sovinoe deposit, supplying the Elkon mining company that is to develop it. Surveys are a study step; these sources give no exact plot, land allocation, grid line or cooling arrangement. Last checked 23 Oct 2026. Atomnaya energiya 2.0: Shelf-M at the Sovinoe deposit
    What would change this

    Publication of the completed site surveys, a land allocation or a siting license for the Sovinoe plant. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 3 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.3 of 3 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(3)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka — https://smrmap.com/projects/chukotka-sovinoe-shelf-m/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka”. Record reviewed 6 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/chukotka-sovinoe-shelf-m/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.