Designs

SMART

KAERI's original integral pressurized-water SMART design is described in its July 2012 release as 330 MWth and 100 MWe in the electricity-only configuration; gross versus net is not stated. The same release describes a cogeneration option with 90 MWe and desalination, rather than an additional reactor design. KAERI reports Korean standard design approval on 4 July 2012. SMART100 is a later upgraded version with different output and safety systems; SMART-C is a further compact variant. These historical descriptions do not establish a built plant or current commercial availability.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 2 Jun 2024: Original SMART: standard design approval reported issued 4 July 2012 (KAERI).
Evidence
4 sources; first primary source: ARIS original status report — SMART (2024-06-02). Record reviewed 2 Oct 2026.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Catalog identity snapshot: 2 Jun 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Integral pressurized water reactor (iPWR)
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 2 Jun 2024
Korea Atomic Energy Research Institute
Module electrical
100 MWe (gross/net unspecified)
Module thermal
330 MWth (nameplate; basis unspecified)
Fuel form
UO2
Development status (as stated)
Original SMART: standard design approval reported issued 4 July 2012 (KAERI)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

  • No projects tracked here.

Agreements naming this design (3)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(4)

Evidence and open questions

(2 notes)
  • Evidence review. KAERI says a standard design approval for SMART, a 100 MWe (330 MWth) integral reactor developed in Korea, was issued on 4 July 2012. That matches the stored 100 MWe, 330 MWth and the stored approval date. A 2024 KAERI page says SMART100, described as a fully passive SMR, received a standard design approval on 26 September 2024. SMART100 is a later model and is not written over this SMART record. The ARIS report classifies design status as detailed design. Its electrical and thermal figures are not quoted or used. No deployment is linked. No module change is proposed because the stored ratings already match KAERI and this profile is identity-only. Last checked 19 Oct 2026. KAERI: standard design approval issued for SMART (9 July 2012); KAERI: SMART100 standard design approval and SMART upgrade (27 September 2024); ARIS original status report — SMART (2024-06-02)
    What would change this

    A KAERI or Korean regulatory document that states whether this record should remain the 2012 SMART design when SMART100 is the approved successor. Next scheduled check: 19 Jan 2027.

  • Module rating. Original SMART electricity-only configuration: 330 MWth and 100 MWe; gross/net is unstated. The 90 MWe cogeneration case is separate. Last checked 15 Oct 2026. KAERI: standard design approval issued for SMART (9 July 2012)
    What would change this

    A later KAERI or regulator specification changes this version or explicitly states the electrical-output basis. Next scheduled check: 13 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Design assessment

  • Korean standard design approval for SMART — applies to the design, not to a site
    Design assessment · Issued / approved · NSSC (Republic of Korea) · decided 4 Jul 2012 · submitted 30 Dec 2010
    KAERI's release says the Nuclear Safety and Security Commission issued a standard design approval for the original SMART (100 MWe, 330 MWth) on 4 July 2012 under Article 12 of the Nuclear Safety Act, after KAERI and KEPCO applied on 30 December 2010. The approval document itself was not opened. SMART100 holds a separate 2024 approval. A standard design approval is not a construction or operating permission.
    Sources: KAERI: standard design approval issued for SMART (9 July 2012)