UNITHERM

UNITHERM is identified as a microreactor design in the ARIS status report dated 2024-10-16, attributed to NIKIET. This dated design identity does not establish current availability, a deployment site, output, or regulatory permission. The IAEA's 2026 catalog section, supplied by its contributor, calls it an integral type reactor and lists the type as PWR. Other technical values remain unknown here pending an independent scope and basis check.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 16 Oct 2024: Conceptual design.
Evidence
3 sources; first primary source: ARIS original status report — UNITHERM (2024-10-16). Record reviewed 2 Oct 2026.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Catalog identity snapshot: 16 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
Microreactor
Technology
Integral pressurized water reactor (iPWR)
The IAEA's 2026 catalog section, supplied by its contributor, calls UNITHERM an integral type reactor with its nuclear steam supply system equipment inside the reactor pressure vessel, and lists the type as PWR.
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 16 Oct 2024
NIKIET
Fuel form
UO2 particles in a metallic silumin or zirconium matrix, metal-ceramic
Development status (as stated)
Conceptual design
Reactor vessel
9.8 m tall, 2.9 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 487.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
UNITHERM
9.8 m tall, 2.9 m across
All vessels to scale
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(3)

Evidence and open questions

(3 notes)