Designs

ACPR50S

Floating-power-plant loop-type pressurized water reactor design with a manufactured reactor module. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Projects
No live project recorded here; 1 earlier-plan record (CGN Bohai ACPR50S floating SMR demonstration proposal). Development status as stated in the catalog dated 14 Feb 2025: Completion of conceptual/program design, preparation of project design.
Evidence
2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Pressurized water reactor (PWR)
The IAEA's 2020 SMR booklet calls the ACPR50S a loop-type PWR, so it is not recorded as integral.
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
China General Nuclear Power Group
Fuel form
UO2 pellet / 17x17 square
Development status (as stated)
Completion of conceptual/program design, preparation of project design
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

Design sources

(2)

Evidence and open questions

(3 notes)
  • Evidence review. The 2020 IAEA booklet describes the ACPR50S as CGN's offshore floating loop-type pressurized-water reactor for combined heat, electricity and fresh water in marine and coastal use. The NEA third edition calls it a floating pressurised light water reactor, which supports the stored light-water coolant and thermal spectrum. The booklet says preliminary design was complete and detailed design was being prepared, and that an industrial demonstration plant was planned in China. The extracted parameter block does not pair a power figure with the capacity row in a readable sentence, so no output is stored. Stored vendor CGN stays. The family is PWR rather than integral PWR, because the booklet says loop-type. Linked deployments are empty. Last checked 19 Oct 2026. IAEA 2020 SMR book: HTR-10 technical table; NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    A CGN or NNSA instrument naming a demonstration site and stating the module output in prose. Next scheduled check: 19 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. No reusable sentence states the module output. The 2020 table extract places other labels between the capacity heading and a bare number pair, so that pair is not used. NEA figures are not reused. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    No reusable published source states a module output. A developer or regulator specification that does so would still not be stored while the identity-only rule stands. Next scheduled check: 19 Jan 2027.

  • Technology family. The IAEA's 2020 SMR booklet calls the ACPR50S a loop-type PWR, so it is not recorded as integral. Last checked 3 Nov 2026. IAEA 2020 SMR book: HTR-10 technical table
    What would change this

    A CGN or IAEA document that changes the ACPR50S reactor type or layout. Next scheduled check: 3 Feb 2027.