Projects / China · Announced

CGN Bohai ACPR50S floating SMR demonstration proposal

CGN ACPR50S offshore floating small PWR experimental/demonstration platform: 2016 energy-science plan inclusion and later pressure-vessel procurement for the experimental platform.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . 1 of 4 listed sources has a publication or document date recorded here: 18 Jan 2016. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No map pin is shown for this record.
  • State or province is not recorded.
  • Expected for this stage but not recorded as a structured fact: Site location recorded as disclosed (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

Bohai is retained as the catalog association, not a verified operating berth or deployment siting. Named berth and present disposition are not established; catalog cancellation is not imported. No pin.

Key facts

Design
ACPR50S (SMR)
Technology
Pressurized water reactor (PWR) · light water. The IAEA's 2020 SMR booklet calls the ACPR50S a loop-type PWR, so it is not recorded as integral.
Operator(s)
China General Nuclear Power Group
Vendor for linked design
—
Location
CGN Bohai ACPR50S floating SMR demonstration (host undisclosed) · China · precision: region only
Bohai regional floating demonstration identity from CGN materials; exact berth/host not verified. GEM approximate Bohai point not used as pin without project-named host relationship.
Coordinates
Region only, no map pin
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Earlier-plan record (historical SMR program)
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

CGN Bohai ACPR50S floating SMR demonstration proposal is recorded at CGN Bohai ACPR50S floating SMR demonstration (host undisclosed), state or province not recorded, China. Operator: China General Nuclear Power Group. Recorded vendor: No vendor is recorded. Stage: Announced. Location precision: region only; region only, no map pin.

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Operator or intended licensed owner
Customer or offtaker

Source-backed project statement The China Atomic Energy Authority's 18 January 2016 news item, attributed to CGN, says CGN and China National Offshore Oil Corporation signed a strategic cooperation framework on 14 January 2016 that would help promote use of the ACPR50S in offshore oil and gas fields, for power, heat and desalination. That makes CNOOC a prospective user at framework level only. No field, berth, quantity or purchase contract is named. CAEA domestic news: CGN and CNOOC offshore small-reactor demonstration, 18 January 2016

Contractor

Source-backed project statement A report by The Paper, carried by Huanqiu and dated only 4 November with no year printed, says CGN Research Institute signed a pressure-vessel procurement agreement with Dongfang Electric for the ACPR50S experimental-reactor platform after a tender. That is a component supply contract, not an engineering, procurement and construction award, and the berth for the platform is not named. CGN ACPR50S experimental platform pressure-vessel procurement (Huanqiu/Pengpai)

Fuel
  • Fuel form stated for ACPR50S (catalog profile as of 14 Feb 2025)UO2 pellet / 17x17 square
No project-specific fuel supply arrangement is recorded as a structured fact.

The Paper's report on the ACPR50S pressure-vessel agreement gives a 30-month refuelling cycle and says the design relies on a mature nuclear-grade supply chain, which are design statements. Neither it nor the 2016 China Atomic Energy Authority and China Energy News items names a fuel supplier, fabrication or delivery for the platform. CGN ACPR50S experimental platform pressure-vessel procurement (Huanqiu/Pengpai)

Not found in the sources we checked (2): Funding and government decisions; Comparable schedule revision
Funding and government decisions

The 2016 China Atomic Energy Authority item, the 20 January 2016 China Energy News report and The Paper's report on the pressure-vessel agreement state no amount, appropriation or financing for the ACPR50S platform. NDRC inclusion in the energy innovation plan is plan approval, not stated money, and the cost-reduction percentage and the roughly 3 billion yuan figure concern series building and a different platform. CGN ACPR50S experimental platform pressure-vessel procurement (Huanqiu/Pengpai); ACPR50S marine nuclear platform included in 13th FYP energy science plan

Comparable schedule revision

Comparable schedule revision not established. The 20 January 2016 China Energy News report says CGN expected to start demonstration-project construction in 2017 and generate power in 2020. The Paper's later report calls the pressure-vessel agreement the formal start of ACPR50S construction but prints no year. No source read gives a second dated target for the same construction or power milestone, so no revision is shown. ACPR50S marine nuclear platform included in 13th FYP energy science plan; CGN ACPR50S experimental platform pressure-vessel procurement (Huanqiu/Pengpai)

Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Reactor supplier; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes, 2 not yet reviewed)

Not yet reviewed against sources: Spent fuel, waste and closure; Next decision and prerequisites. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(1 of 4 sources with a publication or document date)
Latest dated listed source publication: CAEA domestic news: CGN and CNOOC offshore small-reactor demonstration, 18 January 2016: 18 Jan 2016.Latest dated recorded event: no date recorded.3 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: CGN Bohai ACPR50S floating SMR demonstration proposal — https://smrmap.com/projects/cgn-bohai-acpr50s/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “CGN Bohai ACPR50S floating SMR demonstration proposal”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/cgn-bohai-acpr50s/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.