HAPPY200
HAPPY200 is a heat-only pool-loop reactor concept recorded under State Power Investment Corporation; the developer's section of the 2026 IAEA-hosted catalog lists its reactor type as PWR, while its text says it has features of a swimming pool reactor and a PWR to some extent. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- Announced: HAPPY200 nuclear heating project at Baishan, Jilin. Development status as stated in the catalog dated 14 Feb 2025: Detailed design.
- Evidence
- 4 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
The IAEA's 2026 catalog section, supplied by its contributor, lists HAPPY200 as PWR, while its text calls it a pool-loop combined type with features of a swimming pool reactor and a PWR to some extent and its table gives thermal power only, so it is a heat-only design at low pressure. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- State Power Investment Corporation
- Fuel form
- UO2 / Square 17x17
- Development status (as stated)
- Detailed design
- Reactor vessel
- 6 m tall, 2.25 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 37.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallHAPPY200
6 m tall, 2.25 m across - Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- HAPPY200 nuclear heating project at Baishan, Jilin — Announced · China
Design sources
(4)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 220 - IAEA ARIS design record: HAPPY200 (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) (IAEA/NEA, published Sep 2026, accessed 2 Nov 2026)
Evidence and open questions
(3 notes)
- Evidence review. SPIC's section of the 2024 IAEA SMR catalog (third edition, June 2025) names State Power Investment Corporation, Ltd. (SPIC) as developer of HAPPY200, a 200 MW(t) pool-loop combined light-water heating reactor with features of a swimming-pool reactor and a PWR. It is designed as a heat source for district heating in northern Chinese cities, does not generate electricity (200 / 0, thermal power only), and uses UO2 17x17 fuel. The status is internally inconsistent in that edition: the table lists 'Detailed Design', the text says conceptual design is complete and preliminary design underway, the first project has completed site selection and feasibility review, and the 2024 milestone reads 'Project suspended for the time being'. No opened source names Baishan, Jilin, so the linked Baishan project is not connected by these sources. The stored vendor and light-water coolant stay, and the family is PWR on the 2026 catalog table, attached for the reactor type only; the stored thermal spectrum is not stated in the catalog text read, and the stored 'Detailed Design' status follows the table while the text and milestones point to an earlier, suspended stage. The rating stays off this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
An SPIC announcement resuming the HAPPY200 demonstration project or an NNSA site-safety or EIA filing for it, or a newer catalog edition. Next scheduled check: 19 Jan 2027.
- Module rating. The catalog gives HAPPY200 200 MW(t) with no electrical output (thermal power only), a per-reactor heat rating. The figure is not stored on this identity profile, which by standing rule carries no module rating. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
An SPIC design document or regulator filing changing the HAPPY200 heat rating. Next scheduled check: 19 Jan 2027.
- Technology family. The IAEA's 2026 catalog section, supplied by its contributor, lists HAPPY200 as PWR, while its text calls it a pool-loop combined type with features of a swimming pool reactor and a PWR to some extent and its table gives thermal power only, so it is a heat-only design at low pressure. Printed page 37. Last checked 3 Nov 2026. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026)
What would change this
An SPIC or IAEA document that changes the HAPPY200 reactor type or layout. Next scheduled check: 3 Feb 2027.