Projects / China · Announced

HAPPY200 nuclear heating project at Baishan, Jilin

The Baishan nuclear heating project in Jilin, China, is an announced heat-only district-heating project that NEA's 2026 dashboard links to SPIC's HAPPY200 design.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . 2 of 3 listed sources have a publication or document date recorded here; the newest is 9 Dec 2019. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No map pin is shown for this record.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

NEA's 2026 dashboard reports that in 2018 the Baishan municipal government in Jilin selected the site for a nuclear heating project using SPIC's HAPPY200 design. No construction approval or later status has been found; output is not stored.

Key facts

Design
HAPPY200 (SMR)
Technology
Pressurized water reactor (PWR) · light water. The IAEA's 2026 catalog section, supplied by its contributor, lists HAPPY200 as PWR, while its text calls it a pool-loop combined type with features of a swimming pool reactor and a PWR to some extent and its table gives thermal power only, so it is a heat-only design at low pressure.
Reactor vessel of this design
6 m tall, 2.25 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 37.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
SPIC
Vendor for linked design
State Power Investment Corporation
Location
Baishan nuclear heating project site · China · precision: town or locality only
The sources name this place but publish no coordinate for it, so no pin is shown.
Coordinates
Town named, no map pin
Electrical capacity
thermal only (no MWe) · scope: plant
Thermal capacity
Not recorded
Modules planned
2
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
low
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

HAPPY200 nuclear heating project at Baishan, Jilin is recorded at Baishan nuclear heating project site, Jilin, China. Operator: SPIC. Recorded vendor: State Power Investment Corporation. Stage: Announced. Location precision: town or locality only; town named, no map pin.

This project is recorded as thermal only (no MWe). Modules planned: 2. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Operator or intended licensed owner
Reactor supplier
Contractor

Source-backed project statement China Energy News reported on 9 December 2019 that State Nuclear Power Technology (国家核电) and the Shanghai Nuclear Engineering Research and Design Institute had signed, with SPIC's Jilin nuclear company and its Heilongjiang branch, a general-contracting framework agreement for the Jilin Baishan nuclear heating project and a separate one for Jiamusi. A framework agreement is preparatory. It is not an engineering, procurement and construction contract or a construction approval, and the article does not isolate which contractor signed the Baishan agreement. 中国能源报: 东北两核能供热项目加快推进

Fuel
  • Fuel form stated for HAPPY200 (catalog profile as of 14 Feb 2025)UO2 / Square 17x17
No project-specific fuel supply arrangement is recorded as a structured fact.

China Energy News' 9 December 2019 article says the Baishan project will use SPIC's HAPPY200 heating reactor in a two-reactor layout and describes its low-pressure passive design. That is a design description. The article and Nuclear Engineering International's 14 March 2019 report name no fuel fabricator, quantity or delivery for Baishan. 中国能源报: 东北两核能供热项目加快推进

Not found in the sources we checked (3): Customer or offtaker; Funding and government decisions; Comparable schedule revision
Customer or offtaker

Nuclear Engineering International's 14 March 2019 report says SPIC signed a cooperation agreement with the Baishan municipal government for the heating demonstration, and China Energy News on 9 December 2019 says the project could meet Baishan city's winter heating demand. The city is the host and cooperation partner, and neither article names a heat utility, network operator or other buyer for the heat. Nuclear Engineering International: China signs agreement for the Baishan nuclear heating demonstration; 中国能源报: 东北两核能供热项目加快推进

Funding and government decisions

China Energy News' 9 December 2019 article on the Baishan general-contracting framework and Nuclear Engineering International's 14 March 2019 report on the SPIC-Baishan cooperation agreement state no investment amount, funder or financing instrument for the Baishan heating project. 中国能源报: 东北两核能供热项目加快推进

Comparable schedule revision

Comparable schedule revision not established. China Energy News on 9 December 2019 says the Baishan site-survey report passed review in September 2018 and the preliminary feasibility study passed review in April 2019. Nuclear Engineering International's 14 March 2019 report gives a 2022 first-commissioning estimate in a paragraph about the HAPPY200 design generally, without naming Baishan. These are different milestones and scopes, not two dates for the same Baishan milestone. 中国能源报: 东北两核能供热项目加快推进; Nuclear Engineering International: China signs agreement for the Baishan nuclear heating demonstration

Not recorded in SMRMap's reviewed evidence (2): Site host or owner; Programs and agreements naming the project
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 notes, 2 not yet reviewed)
  • Evidence review. The attached NEA dashboard page returned an access refusal (HTTP 403) on 19 October 2026 and was not read; its values are not reused. Nuclear Engineering International, in an article that prints 14 March 2019, says SPIC signed a cooperation agreement on 27 February with the Baishan municipal government for a nuclear heating demonstration, and that a January meeting compared an integrated multi-functional heating reactor and Happy200 and had not chosen a final plan. China Energy News of 9 December 2019 says the Baishan project will use SPIC's HAPPY200, arranged as two units, that a site-selection survey report passed review in September 2018, and that a general-contracting framework was signed for the project. The city is Baishan in Jilin. No plot inside the city is named, so the location stays undisclosed. The stored HAPPY200 design stays because the December article names it. No construction approval, fuel contract, offtaker or licensed operator is in these articles. Heating-area figures differ between the two articles and are not stored. Last checked 19 Oct 2026. NEA SMR Digital Dashboard edition 4.0 (per-design siting entries); Nuclear Engineering International: China signs agreement for the Baishan nuclear heating demonstration; 中国能源报: 东北两核能供热项目加快推进
    What would change this

    A Chinese site-safety or environmental submission that names the Baishan plot, or a later SPIC notice that the project stopped, would change this record. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. The December 2019 article says the Baishan site-selection survey report passed review in September 2018 and that the project would serve Baishan city. It does not name a town, village or plot. The NEA page that might have carried a siting entry was unreadable. Last checked 19 Oct 2026. 中国能源报: 东北两核能供热项目加快推进; NEA SMR Digital Dashboard edition 4.0 (per-design siting entries)
    What would change this

    The site-selection report, or a later siting application, would name the plot if it has been chosen. Next scheduled check: 19 Jan 2027.

  • Permissions and public process. China Energy News reported in December 2019 that the Baishan nuclear heating project's general site-selection report passed review in September 2018 and its pre-feasibility study passed expert review in April 2019, and that an engineering, procurement and construction framework agreement had been signed. These are company study reviews and a framework contract, not regulatory permissions, and the report shows no siting, environmental or construction approval. Last checked 23 Oct 2026. 中国能源报: 东北两核能供热项目加快推进
    What would change this

    An NNSA siting opinion, an MEE environmental report notice or a state approval for the Baishan heating reactors. Next scheduled check: 23 Oct 2027.

  • Site dependencies (land, grid, water). The December 2019 China Energy News report says the Baishan project would meet about 8 million square metres of winter heating demand in Baishan city through an independent heating system, and that its general site-selection report passed review in 2018. The specific site, land arrangement and heat-network connection are not identified in the report. Last checked 23 Oct 2026. 中国能源报: 东北两核能供热项目加快推进
    What would change this

    A siting-stage environmental report or company announcement naming the Baishan site and heat-network arrangement. Next scheduled check: 23 Oct 2027.

Not yet reviewed against sources: Spent fuel, waste and closure; Next decision and prerequisites. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(2 of 3 sources with a publication or document date)
Latest dated listed source publication: 中国能源报: 东北两核能供热项目加快推进: 9 Dec 2019.Latest dated recorded event: no date recorded.1 of 3 listed sources has no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(3)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: HAPPY200 nuclear heating project at Baishan, Jilin — https://smrmap.com/projects/baishan-happy200/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “HAPPY200 nuclear heating project at Baishan, Jilin”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/baishan-happy200/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.