HEXANA
HEXANA is a conceptual advanced modular reactor from the French company Hexana, based on sodium-cooled fast reactor technology and incorporating a high-temperature heat storage device.
- Reactor type
- Sodium-cooled fast reactor. How it works, with a 3D view.
- Projects
- Announced: Hexana first SMR in the Gard rhodanien area. Development status as stated in the catalog dated 14 Feb 2025: Conceptual design.
- Evidence
- 3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Sodium-cooled fast reactor (SFR)
- Coolant
- Sodium
- Spectrum
- Fast
- Developer / vendor(s) as of 14 Feb 2025
- HEXANA
- Fuel form
- MOX
- Development status (as stated)
- Conceptual design
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Hexana first SMR in the Gard rhodanien area — Announced · France
Agreements naming this design (2)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- Hexana and Atoomcoöperatie memorandum on Hexana SMR deployment in the Netherlands (2025) — Cooperation agreement or MOU · Active · announced Nov 2025
Concerns Netherlands - Norsk Kjernekraft and Hexana memorandum on advanced reactor deployment in Norway (2025) — Cooperation agreement or MOU · Active · announced Jun 2025
Concerns Norway
Design sources
(3)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 142 - IAEA ARIS design record: HEXANA (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. Hexana's section of the 2024 IAEA SMR catalog (third edition, June 2025) describes HEXANA, a French start-up launched in 2023 with CEA support, developing an advanced modular reactor based on sodium-cooled fast reactor technology with an integrated high-temperature heat storage device. The plant pairs two pool-type sodium reactor units of 400 MWth each with molten-salt thermal storage, tabulated as 2 x 400 MWth and 2 x 150 MWe, supplying flexible electricity and about 500°C process heat to energy-intensive industry. The fuel is MOX pellets using depleted or natural uranium and plutonium from PWR spent fuel. The edition lists the design status as conceptual design, with milestones targeting basic design in 2026-2028 and first concrete for the first plant in 2030; these are developer targets. No opened source names the Gard rhodanien area, so the linked Gard rhodanien project is not connected by these sources. The stored vendor, SFR family, sodium coolant, fast spectrum, MOX fuel and 'Conceptual Design' status stay; the rating stays off this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A Hexana safety options file to ASNR or a site announcement for the first plant, or a newer catalog edition. Next scheduled check: 19 Jan 2027.
- Module rating. The catalog gives each of the two reactor units 400 MWth, tabulated as 2 x 400 MWth and 2 x 150 MWe for the twin-unit plant; gross versus net is unspecified and the plant total is not a module rating. The figure is not stored on this identity profile, which by standing rule carries no module rating. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A Hexana design document fixing the per-unit electrical output and its basis. Next scheduled check: 19 Jan 2027.
Regulatory actions
Compare reviews and approvals across designs
Design assessment
- HEXANA first safety-options request — applies to the design, not to a site
Design assessment sought · Application received · ASNR · submitted 30 Sep 2026
ASNR reports that Hexana requested an opinion on a first safety option for its small modular reactor on 30 September 2026. The page places this in pre-instruction safety-options exchanges. This is a design assessment request, not a Gard Rhodanien site application, construction permission or issued opinion.
Sources: ASNR, PRM projects and technical exchanges (14 October 2026 update)