HTGR-POLA
HTGR design intended to scale to cogeneration units. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- Announced: HTGR-POLA research reactor (NCBJ). Development status as stated in the catalog dated 14 Feb 2025: Basic design.
- Evidence
- 3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- National Centre for Nuclear Research
- Development status (as stated)
- Basic design
- Reactor vessel
- 16 m tall, 4.08 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 205.belt line is not stated this is not the June 2025 16.2 / 4.08 belt-line pointSMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallHTGR-POLA *
16 m tall, 4.08 m across - Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- HTGR-POLA research reactor (NCBJ) — Announced · Poland
Design sources
(3)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 188 - IAEA ARIS design record: HTGR-POLA (IAEA/NEA, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. NCBJ's section of the 2024 IAEA SMR catalog (third edition, June 2025) names Poland's National Centre for Nuclear Research (NCBJ) as developer of HTGR-POLA, a 30 MW thermal research and demonstration high-temperature gas-cooled reactor updated from Japan's HTTR, with prismatic TRISO fuel blocks, graphite moderator and helium coolant. Its purpose is to build competence and demonstrate HTGR technology for industrial steam, with cogeneration modes of up to 11.5 MWe electricity, 25 t/h superheated steam or 16.5 MWt communal heat. As dated by that edition, basic design and selected PSAR chapters were completed in 2024, the next step is finalising the PSAR with site investigations for a licensing application, and licensing and detailed design are planned for 2025-2028 with construction in 2029-2032. The catalog describes the reactor itself as NCBJ's research HTGR but names no site, which is consistent with the linked NCBJ research-reactor proposal without locating it. The stored NCBJ vendor, helium coolant and 'Basic Design' status stay; the stored family HTGR matches the catalog, which calls the design an HTGR, and the stored thermal spectrum is not stated in the text read. The rating stays off this identity profile. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
NCBJ's licensing application or a PAA (Polish regulator) decision on the HTGR-POLA site or construction, or a newer catalog edition. Next scheduled check: 19 Jan 2027.
- Module rating. The catalog gives HTGR-POLA 30 MWt, with electricity production of up to 11.5 MWe as one of three cogeneration modes; gross versus net is unspecified. The figure is not stored on this identity profile, which by standing rule carries no module rating. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
An NCBJ PSAR or license application stating the rated thermal and electrical output. Next scheduled check: 19 Jan 2027.