HTMR-100

HTMR-100 is a pebble-bed high-temperature gas-cooled reactor, moderated by graphite and cooled by forced helium flow. The published 2024 catalog (June 2025 third edition) describes 35 MWe per module, with gross versus net unspecified; no plant total is inferred. IAEA ARIS and NEA's 2026 dashboard name STL Nuclear as designer of the same HTMR-100; Stratek markets the same design. No succession between the two companies is asserted.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
Announced: Stratek Global HTMR-100 at Zilkaats Estate. Development status as stated in the catalog dated 14 Feb 2025: Basic design.
Evidence
4 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
Stratek Global, STL Nuclear (Pty) Ltd
Module electrical
35 MWe (gross/net unspecified)
Fuel form
TRISO particles in pebbles; LEU/Th
Development status (as stated)
Basic design
Reactor vessel
15.7 m tall, 5.6 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 211.flange outer diameter not an unqualified diameter the parenthesis wraps onto the next printed line Diameter is measured at the outer flange.SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
HTMR-100 *
15.7 m tall, 5.6 m across
All vessels to scale
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(1 without a known value)
Module thermal
Not recorded

Tracked deployment projects

Design sources

(4)

Evidence and open questions

(2 notes)
  • Evidence review. The HTMR100 section of the 2024 IAEA SMR catalog (third edition, June 2025), supplied by STL Nuclear (Pty) Ltd of South Africa, describes the HTMR100 as a pebble-bed high-temperature gas-cooled reactor, graphite-moderated and cooled by forced helium flow, using TRISO particles in pebbles with LEU or thorium fuel. The module produces steam for a 35 MW(e) turbine-generator and is tabulated at 100 / 35 for a single-module plant, for grid or isolated electricity, cogeneration and process heat; gross versus net is not stated. The catalog lists the design status as basic design, with basic design started in 2022 after a 2021 conceptual design, which is a design-stage status only. STL Nuclear's own page describes a basic design of the HTMR100 (100 MW thermal, 35 MW electrical), while the NEA dashboard lists the design under Stratek Global. No opened source names the Zilkaats Estate, so the linked Zilkaats proposal is not connected by these sources. The stored HTGR family, helium coolant, TRISO/LEU-Th fuel and basic-design status stay; the stored Stratek vendor matches only the NEA identity listing, while STL Nuclear is the developer named in the catalog and on STL's page. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition / June 2025 third edition: HTMR100; STL Nuclear: about; NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    A Stratek Global or STL Nuclear filing with South Africa's National Nuclear Regulator, or a document fixing the relationship between Stratek and STL Nuclear. Next scheduled check: 19 Jan 2027.

  • Module rating. The published HTMR100 section in the 2024 catalog (June 2025 third edition) states 35 MWe from one module steam-turbine/generator system. Gross versus net is unspecified. No thermal rating, plant total or current availability is inferred. Last checked 17 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition / June 2025 third edition: HTMR100
    What would change this

    A newer version-specific developer or regulator specification changes or qualifies the module rating. Next scheduled check: 17 Oct 2027.