i-SMR
SMR configurable from one to eight 170-MWe modules. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- Integral pressurized water reactor. How it works, with a 3D view.
- Projects
- No live project recorded here; 1 deferred (Daegu i-SMR proposal at the Gunwi industrial complex). Development status as stated in the catalog dated 14 Feb 2025: Standard Design in progress.
- Evidence
- 2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Integral pressurized water reactor (iPWR)
- Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- i-SMR Development Agency, KHNP and KAERI
- Fuel form
- UO2 pellet / 17 X 17 square
- Development status (as stated)
- Standard Design in progress
- Reactor vessel
- 30.4 m tall, 5.5 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 43.Dimensions refer to the reactor-vessel row. A separate containment vessel is described without dimensions. This is not the June 2025 29.7 / 5.5 point.SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m talli-SMR *
30.4 m tall, 5.5 m across - Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Daegu i-SMR proposal at the Gunwi industrial complex — Deferred · South Korea
Agreements naming this design (1)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- JAEC and KHNP memorandum for a feasibility study of an i-SMR in Jordan — Feasibility or siting study · Status not established · announced 5 Dec 2023
Concerns Jordan
Design sources
(2)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 150 - Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The i-SMR section of the 2024 IAEA SMR catalog (third edition, June 2025) names i-SMRDA, KHNP and KAERI of the Republic of Korea as developers of the i-SMR, an integral PWR with light water coolant and moderator, boron-free operation and fully passive safety. Each module produces 520 MW thermal, tabulated as 520 / 170 MW(t)/MW(e), and the plant is a four-module design for electricity, industrial heat, desalination and hydrogen; gross versus net is not stated. As dated by that edition, standard design is in progress (2024-2025, with pre-licensing preparation) and licensing is planned for 2026-2028; this is a design-stage status. The NEA dashboard says KHNP is collaborating with local governments including Daegu and Gyeongju on deployment, which is the only opened connection to the linked Daegu proposal; no source names the Gunwi industrial complex. The stored vendor, iPWR family, light-water coolant, UO2 17x17 fuel and 'Standard Design in progress' status stay; the stored thermal spectrum is not stated in the text read, and the stored summary's 'one to eight 170-MWe modules' does not match the catalog's four-module design and rests on a dashboard figure this review does not reuse. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
NSSC's standard design approval decision on the i-SMR, or a KHNP/Daegu siting agreement for Gunwi. Next scheduled check: 19 Jan 2027.
- Module rating. The catalog gives each i-SMR module 520 MWt and tabulates 520 / 170 MW(t)/MW(e); gross versus net is unspecified, and the four-module plant total is not a module rating. The figure is not stored on this identity profile, which by standing rule carries no module rating. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
The i-SMR standard design approval application stating the per-module electrical output and basis. Next scheduled check: 19 Jan 2027.