Designs

LDR-50

Steady Energy describes maximum heating power of 50 MW per LDR-50 reactor module and no electricity turbine or generator. The NEA calls it a simplified light water PWR, a pressurized water design for low temperature heat. This is a claimed per-module heat rating, not electrical output, a named deployment or regulatory permission. The NEA catalog identity has a February 2025 assessment cutoff.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Projects
Announced: Keravan Energia / Steady Energy nuclear district-heating plant.
Evidence
2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 8 Oct 2026.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Pressurized water reactor (PWR)
The NEA third edition calls the LDR-50 a simplified light water PWR for low temperature heat, and its developer says it has no turbines or generators.
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
Steady Energy
Module electrical
thermal only (no MWe)
Module thermal
up to 50 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
8 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Agreements naming this design (2)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(2)

Evidence and open questions

(2 notes)
  • Evidence review. Steady Energy's undated LDR-50 page describes the Finnish-designed LDR-50 as a small modular district-heating reactor, with each unit generating 50 MW of thermal power and a maximum heating power of 50 MW per reactor module. The page says it has no turbines or generators, operates at much lower temperatures and pressures than power plants, and can be configured by installing modules in parallel in an underground reactor hall; it also promotes desalination and industrial process heat. The NEA dashboard lists Steady Energy's LDR-50 as a simplified light water PWR designed to produce low-temperature heat. Neither opened source gives a dated design, licensing or availability status, and neither names Kerava or Keravan Energia, so the linked Kerava project is not connected by these sources. The stored vendor, light-water coolant and thermal-only 'up to' 50 MWth per module stay as Steady's own claim, and the family is PWR on the NEA description; the stored thermal spectrum is not stated, and the stored rating sits on an identity-only profile. Last checked 19 Oct 2026. Steady Energy: LDR-50 district-heating module; NEA Small Modular Reactor Dashboard — Third Edition (2025)
    What would change this

    A STUK decision or license application for an LDR-50 plant, or a dated Steady Energy technical document. Next scheduled check: 19 Jan 2027.

  • Technology family. The NEA third edition calls the LDR-50 a simplified light water PWR for low temperature heat, and its developer says it has no turbines or generators. Last checked 3 Nov 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); Steady Energy: LDR-50 district-heating module
    What would change this

    A Steady Energy or NEA document that changes the LDR-50 reactor type or layout. Next scheduled check: 3 Feb 2027.