Projects / Finland · Announced

Keravan Energia / Steady Energy nuclear district-heating plant

The Keravan Energia / Steady Energy plant in Kerava, Finland, is an announced heat-only district-heating project based on the LDR-50 design.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . 1 of 4 listed sources has a publication or document date recorded here: 26 Jun 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

Keravan Energia and Steady Energy signed an agreement aimed at building an LDR-50 heating plant, with construction targeted for 2029 and heat production for 2032. Steady Energy lists Kerava among its projects under way (May 2026). Site not disclosed. STUK's SMR page, fetched 5 October 2026, says its June 2025 preliminary assessment and the 26 June 2026 joint early-review closure report are not a licensing decision and are not permission for this plant.

Key facts

Design
LDR-50 (SMR)
Technology
Pressurized water reactor (PWR) · light water. The NEA third edition calls the LDR-50 a simplified light water PWR for low temperature heat, and its developer says it has no turbines or generators.
Operator(s)
Not recorded
Vendor for linked design
Steady Energy
Location
Kerava · Finland · precision: town or locality only
The sources name this place but publish no coordinate for it, so no pin is shown.
Coordinates
Town named, no map pin
Electrical capacity
thermal only (no MWe) · scope: plant
Thermal capacity
Not recorded
Modules planned
1
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
5 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Keravan Energia / Steady Energy nuclear district-heating plant is recorded at Kerava, Uusimaa, Finland. Operator: No operator is recorded. Recorded vendor: Steady Energy. Stage: Announced. Location precision: town or locality only; town named, no map pin.

This project is recorded as thermal only (no MWe). Modules planned: 1. Thermal output is not recorded on this project. The linked design record states up to 50 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Reactor supplier
Customer or offtaker

Source-backed project statement Keravan Energia's article on its agreement with Steady Energy says Keravan Energia is planning small nuclear power for district-heat production and has an extensive district-heating network. The stated recipient of the heat is Keravan Energia's own Kerava district-heating system. No separate heat buyer or heat contract is named. Keravan Energia and Steady Energy agreement

Not found in the sources we checked (4): Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Contractor

Keravan Energia's article says it and Steady Energy signed an agreement aimed at building a nuclear heating plant and will next study a site, licensing, zoning and technical and economic suitability. Steady Energy is the reactor vendor, so this is a vendor agreement, not a contractor appointment. Neither the article nor Steady Energy's 19 May 2026 page names an engineering, study or construction contractor for Kerava. Keravan Energia and Steady Energy agreement; Steady Energy: fourth Finnish city to explore nuclear district heating

Funding and government decisions

Keravan Energia's article says construction could start around 2029 if an investment is decided, and quotes Steady Energy's chief executive giving a reactor price of about 100 million euros to investors. That is a vendor price, not a Kerava financing decision. Neither the article nor Steady Energy's 19 May 2026 page names a funder or amount for the Kerava plant. Keravan Energia and Steady Energy agreement

Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

Steady Energy's 19 May 2026 page says the LDR-50 uses light-water technology and is refuelled every two to three years. That is a design description. Neither it nor Keravan Energia's article names a fuel supplier, quantity or delivery for the Kerava plant. Steady Energy: fourth Finnish city to explore nuclear district heating; Keravan Energia and Steady Energy agreement

Comparable schedule revision

Comparable schedule revision not established. Keravan Energia's article says that, if an investment is decided, construction could begin around 2029 and district-heat production in 2032. Each target is stated once, and Steady Energy's 19 May 2026 page lists Kerava as under way without a new date. The STUK pages on the project record could not be re-read here. Keravan Energia and Steady Energy agreement; Steady Energy: fourth Finnish city to explore nuclear district heating

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes, 1 not yet reviewed)
  • Evidence review. Keravan Energia and Steady Energy signed an agreement aimed at a Kerava district-heating plant. If an investment is decided, the source targets construction around 2029 and heat production in 2032. The parties will next study a suitable site, licensing, zoning and technical/economic suitability. Steady Energy's 19 May 2026 account lists Kerava among LDR-50 heating projects underway. Keravan Energia is a project proposer; none of the cited project sources identifies a reactor operator. STUK's 26 June 2026 early concept review is not a licensing procedure or a binding permission for this plant. No Kerava parcel, fuel supplier or project price is stated. The project remains announced and heat-only, with output unknown. Last checked 19 Oct 2026. Keravan Energia and Steady Energy agreement; Steady Energy: fourth Finnish city to explore nuclear district heating; STUK: international assessment of the Finnish LDR-50 plant concept completed
    What would change this

    A Keravan Energia investment decision, or a named site application to STUK for this plant, would change this record. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. The companies say they will next look for a suitable place. No parcel in Kerava is named. The electrically heated pilot discussed for other cities is not this plant. Last checked 19 Oct 2026. Keravan Energia and Steady Energy agreement
    What would change this

    A Keravan Energia or municipal notice that names the plant parcel would settle the site. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. Keravan Energia says the next steps are studies of a site, licensing and zoning and the plant's technical and economic suitability, and that if an investment decision is made, construction could begin around 2029 with heat production in 2032. The investment decision is the consequential step; those years are targets, not achieved milestones. Last checked 23 Oct 2026. Keravan Energia and Steady Energy agreement
    What would change this

    A Keravan Energia investment decision, site choice or start of an environmental assessment. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. Keravan Energia's article on its agreement with Steady Energy says the two companies will next study a suitable site and how licensing and zoning would proceed, together with the plant's technical and economic fit. No environmental assessment, zoning decision or license application for a Kerava plant is shown in the sources reviewed, and Steady Energy's later news item lists Kerava only as a project under way. Last checked 23 Oct 2026. Keravan Energia and Steady Energy agreement; Steady Energy: fourth Finnish city to explore nuclear district heating
    What would change this

    An EIA program for a Kerava nuclear heating plant, a zoning decision, or a license application. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Keravan Energia's agreement article says a suitable site has still to be studied, and notes the company already runs an extensive district-heating network in its area. No site, land arrangement or heat-network connection point for the plant is identified in the sources reviewed. Last checked 23 Oct 2026. Keravan Energia and Steady Energy agreement
    What would change this

    A Keravan Energia site announcement or EIA program naming the plant location. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(1 of 4 sources with a publication or document date)
Latest dated listed source publication: STUK: international assessment of the Finnish LDR-50 plant concept completed: 26 Jun 2026.Latest dated recorded event: no date recorded.3 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Keravan Energia / Steady Energy nuclear district-heating plant — https://smrmap.com/projects/kerava-ldr50/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Keravan Energia / Steady Energy nuclear district-heating plant”. Record reviewed 5 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/kerava-ldr50/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.