LOKI MMR
LOKI MMR is NANO Nuclear Energy's portable microreactor concept for remote terrestrial, marine and space uses. The company says the US regulator's familiarity with TRISO fuel and helium-cooled reactors should ease its licensing.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- Announced: Pylon / LOKI MMR experiment proposal for INL's DOME.
- Evidence
- 2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- Microreactor
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- NANO Nuclear Energy
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Pylon / LOKI MMR experiment proposal for INL's DOME — Announced · United States
Agreements naming this design (1)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- NANO Nuclear Energy and Ameresco memorandum on deploying NANO microreactors at US federal and commercial sites (2026) — Cooperation agreement or MOU · Active · announced Jan 2026
Concerns United States
Design sources
(2)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 180 - nanonuclearenergy.com: LOKI MMR (company, accessed 14 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. NANO Nuclear Energy's undated LOKI MMR page describes the LOKI MMR as a portable microreactor for remote terrestrial, marine and space uses, designed to provide between 1.5 MWth and 5 MWth, with a space power system scalable from 10 kWe to 3 MWe. It shares a technology base with NANO's KRONOS MMR and relies on TRISO fuel and helium cooling, which NANO says should ease NRC licensing. NANO says initial testing was originally expected in 2026 under NRIC's front-end engineering program and that, after its recent acquisition of the technology, it aims to demonstrate LOKI MMR at INL's DOME facility by 2027; this is a developer target, not an authorization. That DOME plan matches the linked Pylon / LOKI MMR DOME experiment proposal. The NEA dashboard lists the LOKI MMR under NANO Nuclear Energy as a transportable high-temperature gas-cooled reactor. The stored NANO vendor, HTGR family and helium coolant stay; the stored thermal spectrum is not stated, and the power range stays off this identity profile. Last checked 19 Oct 2026. nanonuclearenergy.com: LOKI MMR; NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
An NRIC/DOE DOME selection or test-plan document for LOKI MMR, or a NANO technical specification fixing the rated output. Next scheduled check: 19 Jan 2027.
- Module rating. NANO's page gives a designed thermal range of 1.5 MWth to 5 MWth per reactor and a space power system scalable from 10 kWe to 3 MWe; this is a design envelope, not a single nameplate rating. The figure is not stored on this identity profile, which by standing rule carries no module rating. Last checked 19 Oct 2026. nanonuclearenergy.com: LOKI MMR
What would change this
A NANO specification or DOME experiment plan stating a single rated thermal output for the demonstration unit. Next scheduled check: 19 Jan 2027.